Skip to content
Aperlena

JV SCS Multi-Site Utility Connection Works

Closed Contract notice
Watch this tender

We email you if the deadline moves or a correction is published. Free. Log in

  1. Published
  2. Deadline open for 26 days
  3. Awarded pending

Description

We are seeking applications from suitably qualified and accredited Independent Connection Providers (ICPs), Self-Lay Providers (SLPs), and multi-utility contractors to deliver contestable utility connection works across several active construction sites in London. Please note that the estimated contract value shown is based on a per site average. The works encompass the design, procurement, excavation, installation, testing, and commissioning of primary utility infrastructure for: - Power (HV/LV distribution and substation connections) - Water (Main tapping, metering, chlorination, and adoption prep) - Telecommunications (Ducting, chambers, and fibre integration) SCOPE OF WORKS BY UTILITY a) Power Infrastructure: - Installation of High Voltage (HV) and Low Voltage (LV) cables. - Substation base construction, transformer positioning, and jointing. - Delivery of contestable works under UK Power Networks (UKPN) adoption standards. b) Water Infrastructure: - Main connections, boundary box installations, and site distribution pipework. - Pressure testing, chlorination, and water sampling under Thames Water / Affinity Water standards. c) Telecoms & Communications: - Installation of Openreach / Virgin Media / Altnets compliant ducting and footway chambers. - Cable pulling, lead-in installation, and box terminations. LONDON OPERATIONAL CONSTRAINTS & SITE CONDITIONS Contracts will take place in high-density urban environments. Bidders must demonstrate proven capability in managing: - NRSWA Compliance & Highway Authorities: Securing Section 50/171 licenses, managing Traffic Management (TM) schemes, and adhering to London Borough / TfL permit systems. - Sub-surface Utilities: Operating in congested underground service environments utilizing PAS 128 (Type B/A) utility mapping and GPR scanning prior to excavation. - Low Emission Requirements: Compliance with London's NRMM (Non-Road Mobile Machinery) emissions standards and FORS (Fleet Operator Recognition Scheme) Silver/Gold for site deliveries. CONTRACTUAL STRUCTURE We reserve the right to award this scope as a single multi-utility package or split the requirements into trade-specific lots (Water, Power, Telecoms) depending on response quality.

Official source

Source: Contracts Finder (UK Cabinet Office)

Always verify details on the official notice.

Last verified against Contracts Finder (UK Cabinet Office) 1 month ago

Documents on Contracts Finder (UK Cabinet Office) (English)

Similar tenders

Market context

Avg. open tender · Construction work
€31,418,044
29,740 open across Europe right now 81% below sector average
Buyer track record on Aperlena
2 notices tracked · 0 awarded

Never miss a tender like this

Get an email for new tenders matching: Construction work · United Kingdom. Free.

Set up my alert

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
/
Jump to the search box
?
Show these shortcuts
Esc
Close