Ireland - Modular and portable buildings - Tender for the Supply, Installation of Rental Portacabins at Medite Europe DAC ‘26
Buyer: Medite Europe DAC
Country: Ireland
Deadline: 9 Feb 2026, 15:00 (UTC)
Estimated value: €375,000
Procedure: Open procedure
Sector (CPV): Construction materials (44211100)
Aperlena: https://aperlena.com/en/t/ireland-modular-and-portable-buildings-tender-for-the-supply-installation-of-rental-portacabins-at-medite-europe-da-790e4d21d3
Official notice: https://ted.europa.eu/en/notice/-/detail/44905-2026
Bidding is closed. An award or a correction on this notice: an email when the register sees it.
Log in
01
Description
MEDITE Europe DAC has plans to modernize their MDF facility with an investment in new plan and equipment collectively called Project Shine. Project Shine involves the installation of the following: • Wet fuel handling system. • Dry Fuel handling system. • 56MW Biomass Energy. • MDF dryers. • Services + utilities to the above, mainly: o Compressed air o Water treatment systems o Fire detection + suppression o Natural Gas o Steam o Storm and foul water o Bunds where necessary Project Shine is shortly commencing the construction phase of the project and proposals are sought for the supply, installation and eventual removal of a range of Portacabins for use as temporary accommodation. The scope of works includes for the supply, installation and eventual removal of a range of Portacabins for use as temporary accommodation. An outline Contractor Compound Layout is attached in appendices. This contract includes for the supply of all offices, containers, welfare facilities (showers, toilets urinals, sinks), drying rooms, first aid room and canteens for the durations outlined in appendices. The proposal provided by the specialist must comply with the following: a) All delivery, offloading, positioning, assembly, lift plans, stairs erection, removal is part of this scope of supply. b) All offices, welfare facilities, drying rooms etc must be fit for purpose with capability of additional units if required. c) All office portacabins must have the following d) All toilet facilities must have e) All shower units must have the following f) All drying portacabins must have the following g) All canteen units must have the following h) Meeting Room portacabin must have the following i) First Aid Room and Permit Office portacabins must have the following j) Security portacabins must have the following k) Miscellaneous l) All design and certification requirements for the electrical and plumbing requirements as detailed above are the responsibility of the portacabin supply company. m) All portacabins must be non-slip flooring design n) All portacabins must be suitably fire rated. o) All portacabins must have smoke wired detectors. p) All stairs access must comply with regulations + standards. q) Supply + installation of WIFI/Ethernet service is not part of this scope. r) Supply + installation of fire extinguishers is not part of this scope. s) Connection of water, wastewater + sewage is not part of this scope. t) Services to all offices, containers welfare facilities etc is not part of this scope of supply. u) The site compound will be prepared by the appointed civil contractor to provide a level hardcore standing. v) The portacabin supplier must allow for the co-ordination of the layout with the client or client representative. Medite have attempted to interpret the requirements for the construction compound. Since the Supplier is an expert, the Supplier is asked to advise Medite of suitable additional equipment/systems and its requirements that are not fulfilled and to provide an option price for same. Summary of Proposed Investment: The key components of Project Shine are as follows: • Installation of a Wet Fuel handling system to supply the energy plant. • Installation of a Dry Fuel handling system to supply the energy plant. • Installation of an Energy Plant for thermal oil heating and supplying hot gas to the dryers. • Installation of a face + core Dryer. • Integration into the existing plant. It is proposed to implement Project Shine in several phases, mainly: • Equipment Vendor selection • Detailed Design • Utilities + Services Tendering Process • Issuing of contracts • Enabling works • Civil works • Equipment assembly and erection works • Commissioning of all equipment • Handover ** Please see the Tender Document attached for the full and Complete scope of Works as well as drawings ***
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
of the awards went to the three most frequent winners
6%
winners of the last 12 months were new here
67 of 69
buyers awarded contracts here
67
Based on 161 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable.
Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
New: no award from the same buyer or market in the two years before.
Competition
tenders per lot on average (open and restricted procedures)
2.5
of those lots received a single tender
18%
of the awards went to companies based in another country
20%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
04
Change history
Every time an official source republished this notice with different content. We watch every source we index, including regional copies of the same notice.
Read before bidding
Submission deadline
Was:February 9, 2026, 00:00
Now:
February 9, 2026, 15:00
1 day later
Estimated value
not stated
Now:
€375,000
Follow this tender and we email you the moment it changes.
Create account