Summary
Machine-generated summaryTransport Infrastructure Ireland plans to procure the MetroLink programme, a high speed, high capacity, high frequency metro service along the Swords/Airport to Dublin City Centre corridor, designed for integration with other public transport modes. Procurement covers several contracts: a Programme Delivery Partner (PDP) Contract supporting TII in post-contract, construction and delivery functions, including contract management roles under the civils contracts; the M401 and M402 Main Civils Infrastructure Contracts, two NEC4 Engineering and Construction Contracts for bored tunnels, portals, shafts, deep station excavations from Charlemont to Northwood, viaducts, surface sections, the Estuary Park and Ride facility and Dardistown Depot preparation; and the M500 Contract as a DBFOM arrangement.
Description
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Report an error in this notice
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 3 days ago
The buyer
Full buyer profileTransport Infrastructure Ireland (TII)
- notices in the register
- 209
- awards
- 143
- awarded in total
- €904.7M
Who wins its contracts
Many suppliers- different companies won its awards
- 37
- of the awards went to the three most frequent winners
- 25%
- winners of the last 12 months were new here
- 16 of 17
- of its calls state an estimated value
- 89%
Based on 51 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners. New: no award from the same buyer or market in the two years before.
Competition
- tenders per lot on average (open and restricted procedures)
- 5.9
- of those lots received a single tender
- 5%
- of the awards went to companies based in another country
- 13%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.
Who usually wins this buyer's contracts in this sector
| Company | Wins | Total awarded | Last win |
|---|---|---|---|
| Colas JV | 2 | €11.3M | Aug 2024 |
| Jons Civil Engineering Company Limited | 2 | €7.9M | Jul 2025 |
| McKeon Contech Ltd. t/a McKeon Group and Hereworks | 2 | €2.4M | Jul 2024 |
| Jons Civil Engineering Limited | 1 | €5.8M | Jul 2025 |
| Northern Road Markings Ltd | 1 | €2.0M | Oct 2024 |
Based on 14 awards with a linked company profile over the last 5 years.
23 open tenders right now
- Building and facilities management services - M700.CN.1025 - Soft Facilities Management Services for MetroLink (TII) 29 days left
- Environmental impact assessment other than for construction - MetroLink - Environmental Monitoring Services No deadline published
- Public transport services by railways - MetroLink M500 Service Delivery Partner No deadline published
Market context
- open now in Construction work
- 29,122
- median open notice
- €826,446
Who wins in this market
Many suppliersIreland · Construction work
- different companies won awards here
- 789
- of the awards went to the three most frequent winners
- 5%
- winners of the last 12 months were new here
- 365 of 517
- buyers awarded contracts here
- 201
Based on 1,486 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners. New: no award from the same buyer or market in the two years before.
Competition
- tenders per lot on average (open and restricted procedures)
- 8.3
- of those lots received a single tender
- 12%
- of the awards went to companies based in another country
- 7%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
Similar tenders
Open now
Open
€1,200,000,000
est. value
Open
€1,200,000,000
est. value
Open
€1,200,000,000
est. value
Awarded before
Never miss a tender like this
876 new notices in Construction work in Ireland in the last 7 days. Get an email when new ones appear. Free.
Set up my alert