The Aperlena Verdict
Open raceNo supplier dominates: 24 different companies have won the last 73 comparable contracts from this buyer over 5 years. This is a genuinely open race.
- Expected final price vs the published estimate
- 0%
Based on 73 comparable awards by this buyer in this sector over 5 years. Every verdict is recorded before the outcome and graded against the award notice. How we score ourselves.
Description
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Report an error in this notice
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 2 days ago
What this buyer has paid before
Based on 55 comparable contracts this buyer awarded in this sector over the last 4 years.
- Median award
- €216,615
- Middle half of past awards
- €102,890 to €604,575
TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it has no mark on the scale. The official documents may state one.
Most recent awards
- Works for complete or part construction and civil engineering work - 9726 (7774-43) NGT - Pole Validator Installation Package 3 Works €616,610
- Works for complete or part construction and civil engineering work - 9885-Installation of scour protection and associated works at UBE89 and UBE97 €65,025
- Works for complete or part construction and civil engineering work - 9755 (9096-62) Division 26 Drainage €129,438
- Erection of fencing - 9831-Fencing at Dun Laoghaire €31,700
- RFQ_23118 Maintenance and Re-Pointing of Wall Blackrock - Seapoint €27,691
Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.
The buyer
Full buyer profileIarnród Eireann-Irish Rail
- notices in the register
- 1,172
- awards
- 803
- awarded in total
- €1.4B
Who wins its contracts
Many suppliers- different companies won its awards
- 154
- of the awards went to the three most frequent winners
- 15%
- winners of the last 12 months were new here
- 127 of 134
- of its calls state an estimated value
- 57%
Based on 250 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners. New: no award from the same buyer or market in the two years before.
One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.
Who usually wins this buyer's contracts in this sector
| Company | Wins | Total awarded | Last win |
|---|---|---|---|
| TRIUR Construction Limited | 14 | €104.6M | Oct 2026 |
| Carra Plant Hire Ltd | 14 | €1.6M | Sep 2026 |
| Global Rail Services Ltd | 9 | €7.7M | Sep 2026 |
| Pod-Trak infrastructure | 5 | €134.9M | Jul 2026 |
| CRS Contracts | 5 | €1.9M | Jul 2026 |
Based on 73 awards with a linked company profile over the last 5 years.
121 open tenders right now
- Provision of Occupational Health Service for Irish Rail Contractors 745 days left
- Repair, maintenance and associated services related to aircraft, railways, roads and marine equipment - 9300 CME Rolling stock Cleaning and waste management system No deadline published
- Construction work - 9840 Design and Build Enabling Works at the DART+ and MetroLink Interface at Glasnevin No deadline published
Market context
TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it cannot be placed among the open notices of its sector. The official documents may state one.
- open now in Construction work
- 29,189
- median open notice
- €830,000
Who wins in this market
Many suppliersIreland · Construction work
- different companies won awards here
- 789
- of the awards went to the three most frequent winners
- 5%
- winners of the last 12 months were new here
- 366 of 518
- buyers awarded contracts here
- 201
Based on 1,485 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners. New: no award from the same buyer or market in the two years before.
Similar tenders
Open now
1
day left
€950,000
est. value
3
days left
€350,000
est. value
3
days left
€350,000
est. value
Awarded before
Never miss a tender like this
876 new notices in Construction work in Ireland in the last 7 days. Get an email when new ones appear. Free.
Set up my alert