Awarded to
- Awarded value
- €53,500
- Award date
- Bids received
- 6
- Record with this buyer
- 1 first contract from this buyer in the register
- Back on the market
- Oct 2028 How we know
When this contract comes back
estimated from the stated durationThis contract runs about 25 months, so it is back on the market around October 2028.
Every contract expiring, on the radarDescription
Terms of the procedure
- How tenders are scored
- Cost
As the official notice states them.
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Report an error in this notice
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 6 hours ago
What this buyer has paid before
Based on 62 comparable contracts this buyer awarded in this sector over the last 4 years.
- This award
- €53,500
- Median award
- €164,182
- Middle half of past awards
- €76,925 to €399,586
The award is smaller than three in four past awards.
Most recent awards
- Architectural, construction, engineering and inspection services - Façade and Building Envelope Engineering Consultancy Services for The Refurbishment, Fitout and Historic Building Retrofit of Áras Mhic Dhiarmada, Store St, Beresford Place, Dublin 1 €425,000
- Architectural, construction, engineering and inspection services - Conservation Architect consultancy services for The Refurbishment, Fitout and Historic Building Retrofit of Áras Mhic Dhiarmada/Busáras, Store St, Beresford Place, Dublin 1 €781,811
- Civil engineering support services - Civil and Structural Consultancy Services for The Refurbishment, Fitout and Historic Building Retrofit of Áras Mhic Dhiarmada/Busáras, Store St, Beresford Place, Dublin €608,850
- Architectural, construction, engineering and inspection services - BIM Consultancy Services for the Aquatic House Complex, National Botanic Gardens, Glasnevin, Dublin 9 €157,460
Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.
The buyer
Full buyer profileOffice of Public Works (OPW)
- notices in the register
- 985
- awards
- 436
- awarded in total
- €185.2M
Who wins its contracts
Many suppliers- different companies won its awards
- 159
- of the awards went to the three most frequent winners
- 6%
- winners of the last 12 months were new here
- 109 of 118
- of its calls state an estimated value
- 64%
Based on 190 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners. New: no award from the same buyer or market in the two years before.
Competition
- tenders per lot on average (open and restricted procedures)
- 18.3
- of those lots received a single tender
- 22%
- of the awards went to companies based in another country
- 17%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.
Awards most often to
8 open tenders right now
- Earthmoving and excavating machinery, and associated parts - Supply of 14-16 tonne Standard Radius Hydraulic Excavators 8 days left
- Facilities management services - The provision of a mobile app to facilitate the booking of desks, lockers and parking spaces at the Office of Public Works, 1GQ, 1 Georges Quay, Dublin 2. D02 Y098 11 days left
- Hire of water transport equipment with crew - Official Passenger and Cargo Ferry Transportation Service for the Office of Public Works, Sceilg Mhichíl, Co. Kerry 18 days left
Market context
- open now in Architecture & engineering services
- 7,764
- median open notice
- €294,310
Who wins in this market
Many suppliersIreland · Architecture & engineering services
- different companies won awards here
- 723
- of the awards went to the three most frequent winners
- 4%
- winners of the last 12 months were new here
- 377 of 479
- buyers awarded contracts here
- 178
Based on 1,196 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners. New: no award from the same buyer or market in the two years before.
Competition
- tenders per lot on average (open and restricted procedures)
- 31.3
- of those lots received a single tender
- 15%
- of the awards went to companies based in another country
- 13%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
Similar tenders
Open now
5
days left
€75,000
est. value
8
days left
€50,000
est. value
Awarded before
Never miss a tender like this
32 new notices in Architecture & engineering services in Ireland in the last 7 days. Get an email when new ones appear. Free.
Set up my alertOr follow just its CPV code, Architectural, construction, engineering and inspection services: an email when new tenders arrive under it, no account needed.