Machine-generated summaryWorks tender for the renewal of the Alajaama Tuhala (Kose) substation in Tuhala village, Kose municipality, Harju County. The contractor must carry out the works according to the project and the additional conditions. The completion deadline for the works is 18 January 2027. The meter will be provided de-energised (ELV), and the need for this must be notified two weeks in advance. Where possible and necessary, the contract may be signed and the works started before the expected contract start date, or after that date if the procurement procedure is extended. Exclusion grounds and qualification requirements are set out in the procurement documents.
Description
Bid or no-bid?
Six questions before you commit a team. Under each one, what the register holds on it. The answers are yours.
Can I bid?
- The notice is written in Estonian.
- Tender documents: riigihanked.riik.ee
- Certificates from another EU country? Check the equivalents on eCertis
Official source
Source: Riigihangete register (RHR, Rahandusministeerium)
Always verify details on the official notice.
Report an error in this notice
Last verified against Riigihangete register (RHR, Rahandusministeerium) 3 hours ago
The official portal may ask for a free registration before downloading.
What this market pays
The buyer has too few awards of its own in this sector, so this is the range of the last 102 awards for Construction work in Estonia.
- Median award
- €6.2M
- Middle half of past awards
- €2.2M to €11.2M
Riigihangete register (RHR, Rahandusministeerium) publishes no value for this notice, so it has no mark on the scale. The official documents may state one.
Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.
The buyer
Full buyer profileElektrilevi OÜ
- notices in the register
- 377
- awards
- 189
- awarded in total
- €45.7M
Who wins its contracts
Many suppliers- different companies won its awards
- 62
- of the awards went to the three most frequent winners
- 23%
- of its calls state an estimated value
- 13%
Based on 183 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 5.7
- of those lots received a single tender
- 6%
- of the awards went to companies based in another country
- 5%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
Who usually wins this buyer's contracts in this sector
| Company | Wins | Total awarded | Last win |
|---|---|---|---|
| Aktsiaselts KH Energia - Konsult; OÜ Pluvo Eesti | 1 | Aug 2025 | |
| E-Service Aktsiaselts; LEONHARD WEISS OÜ | 1 | Aug 2025 | |
| Enersense Aktsiaselts; E-Service Aktsiaselts | 1 | Mar 2026 | |
| Enersense Aktsiaselts; OÜ Clougrupp | 1 | Dec 2025 | |
| Enersense Aktsiaselts; TERASTEENUS OÜ | 1 | Aug 2025 |
Based on 7 awards with a linked company profile over the last 5 years.
47 open tenders right now
- Installation and commissioning of an earthed transformer with integrated arc suppression coil (TKKP1) at Roosna-Alliku substation (LR8372) 1 day left
- Rapla County, Märjamaa Municipality, Leevre Village: Repair of the Sipa 10 kV Feeder Leevre Branch Line, Wire Replacement (IP8331) 1 day left
- Harju County, Kuusalu Parish, Muuksi Village, Low-Voltage Connection of the Orunõlva Property (LC5845) 1 day left
Market context
Riigihangete register (RHR, Rahandusministeerium) publishes no value for this notice, so it cannot be placed among the open notices of its sector. The official documents may state one.
- open now in Construction work
- 29,149
- median open notice
- €850,000
Who wins in this market
Moderately concentratedEstonia · Construction work
- different companies won awards here
- 90
- of the awards went to the three most frequent winners
- 37%
- buyers awarded contracts here
- 41
Based on 215 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 7.1
- of those lots received a single tender
- 1%
- of the awards went to companies based in another country
- 1%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.