Skip to content
Aperlena

France - Road works - RD135 - Removal of level crossing 66 in Perrignier and creation of a roundabout on RD 135

Original France - Travaux routiers - RD135 - Suppression du PN 66 sur la commune de Perrignier et création d'un giratoire sur la RD 135

Open Contract notice 12 days left
Watch this tender

Deadline 9 Oct. If it moves, an email when the register sees it. A correction: the same email. Log in

  1. Published
  2. Today
  3. Deadline open for 32 days
  4. Awarded pending

The Aperlena Verdict

Open race

No supplier dominates: 25 different companies have won the last 27 comparable contracts from this buyer over 5 years. This is a genuinely open race.

0%
Expected final price vs the published estimate

Based on 27 comparable awards by this buyer in this sector over 5 years. Every verdict is recorded before the outcome and graded against the award notice. How we score ourselves.

Summary

Machine-generated summary

The buyer, the French Department, is procuring road works on the RD 135 in Perrignier, France. As part of the A412 motorway construction between Machilly and Thonon-les-Bains, SNCF is securing level crossings 65 and 66: RD 25 will be closed at crossing 65 and crossing 66 will be removed by lowering RD 135, including a rail bridge, a road overpass and a reinstated municipal road. The Department is building a roundabout connecting RD 135 with the street serving Perrignier station, plus the carriageway and underpass equipment. Works include demolition, earthworks, pavement, kerbs, wet networks, acoustic barriers and signage.

Description

Dans le cadre de la construction de l'autoroute A412 entre Machilly et Thonon-les-Bains, la SNCF est missionnée pour sécuriser les passages à niveaux n°65 et 66 sur la commune de Perrignier qui verront leurs trafics routiers augmenter. Ces projets de suppression de passages à niveaux consistent à fermer la RD 25 au droit du PN65 et à supprimer le PN 66 par une dénivellation de la RD 135 Le projet porté par la SNCF consiste à créer l'ouvrage de dénivellation, le Pont Rail et un passage supérieur routier pour rétablir une voie communale. Le Département quant à lui réalise sous sa maîtrise d'ouvrage un giratoire permettant de raccorder la RD 135 et la rue connexe qui dessert la gare de Perrignier, ainsi que la chaussée et les équipements du passage sous rail. Les principales caractéristiques du projet sont : - Démolition ; - Terrassement ; - Structure de chaussée / revêtements - Bordures ; - Réseaux humides - Ecrans acoustiques ; - Signalisation verticales et horizontales

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 week ago

More from this buyer

Full buyer profile

14 open tenders right now

Who usually wins this buyer's contracts in this sector

Based on 27 awards with a linked company profile over the last 5 years.

What this buyer has paid before

Based on 16 comparable contracts this buyer awarded in this sector over the last 4 years.

€41,980
Lower quartile
€279,115
Median award
€646,742
Upper quartile

Most recent awards

Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.

Similar tenders

Market context

Avg. open tender · Construction work
€31,225,195
25,976 open across Europe right now
Buyer track record on Aperlena
293 notices tracked · 151 awarded
€368,481,926 in awarded contracts

Never miss a tender like this

696 new notices in Construction work in France in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
/
Jump to the search box
?
Show these shortcuts
Esc
Close