Summary
Machine-generated summaryThe Champagne University Hospital Group (GHUC) is procuring maintenance and fit-out works through a framework agreement, with individual projects capped below EUR 250,000 excluding VAT. The framework is signed with several economic operators, subject to sufficient candidates and offers, and is executed via subsequent contracts preceded by competition among framework holders when needs arise. It has no minimum value but a maximum per site and lot, defined in the CCAP appendix 2. Works are divided into 17 technical trades across 5 geographical sites: Reims CHU, the CHAM facilities (Epernay and its EHPADs at Dormans, Ay, Avize and Vertus), Montmirail CH, the CHLB group (Leon Bourgeois Hospital and EPSM de la Marne), and the GHSA group (Rethel and Vouziers hospitals), with lot number ranges per site.
Description
79 lots
- Lot 1
- Voiries Réseaux Divers (VRD) 12 months · Excavating and earthmoving work
- Lot 2
- Gros-Œuvre (GO) 12 months · Structural shell work
- Lot 3
- Couverture Etanchéité (CE) 12 months · Roof-covering work
- Lot 4
- Menuiserie Métallique - Aluminium (MMA) 12 months · Joinery work
- Lot 5
- Menuiserie Intérieure (MI) 12 months · Joinery work
- Lot 6
- Carrelage - Faïence (CF) 12 months · Tiling work
- Lot 7
- Peinture - Revêtements (PR) 12 months · Painting work
- Lot 8
- Occultation (OC) 12 months · Installation work of blinds
Show 71 more lots
- Lot 9
- Marquage Routier (MR) 12 months · Road-surface painting work
- Lot 10
- Electricité Haute Tension - TGBT (HT) 12 months · Electrical fitting work
- Lot 11
- Electricité Courants Forts (CFo) 12 months · Electrical fitting work
- Lot 12
- Electricité Courant Faible (CFa) 12 months · Electrical fitting work
- Lot 13
- Gestion Technique Centralisée (GTC) 12 months · Other electrical installation work
- Lot 14
- Chauffage - Ventilation - Climatisation (CVC) 12 months · Heating, ventilation and air-conditioning installation work
- Lot 15
- Plomberie sanitaire (PB) 12 months · Plumbing and sanitary works
- Lot 16
- Fluides Médicaux (FM) 12 months · Plumbing and sanitary works
- Lot 17
- Désamiantage 12 months · Asbestos-removal work
- Lot 18
- Voiries Réseaux Divers (VRD) 12 months · Excavating and earthmoving work
- Lot 19
- Gros-Œuvre (GO) 12 months · Structural shell work
- Lot 20
- Couverture Etanchéité (CE) 12 months · Roof-covering work
- Lot 21
- Menuiserie Métallique - Aluminium (MMA) 12 months · Joinery work
- Lot 22
- Menuiserie Intérieure (MI) 12 months · Joinery work
- Lot 23
- Carrelage - Faïence (CF) 12 months · Tiling work
- Lot 24
- Peinture - Revêtements (PR) 12 months · Painting work
- Lot 25
- Occultation (OC) 12 months · Installation work of blinds
- Lot 26
- Marquage Routier (MR) 12 months · Road-surface painting work
- Lot 27
- Electricité Haute Tension - TGBT (HT) 12 months · Electrical fitting work
- Lot 28
- Electricité Courants Forts (CFo) 12 months · Electrical fitting work
- Lot 29
- Electricité Courant Faible (CFa) 12 months · Electrical fitting work
- Lot 30
- Gestion Technique Centralisée (GTC) 12 months · Other electrical installation work
- Lot 31
- Chauffage - Ventilation - Climatisation (CVC) 12 months · Heating, ventilation and air-conditioning installation work
- Lot 32
- Plomberie sanitaire (PB) 12 months · Plumbing and sanitary works
- Lot 33
- Fluides Médicaux (FM) 12 months · Plumbing and sanitary works
- Lot 34
- Désamiantage 12 months · Asbestos-removal work
- Lot 35
- Voiries Réseaux Divers (VRD) 12 months · Excavating and earthmoving work
- Lot 36
- Gros-Œuvre (GO) 12 months · Structural shell work
- Lot 37
- Couverture Etanchéité (CE) 12 months · Roof-covering work
- Lot 38
- Menuiserie Métallique - Aluminium (MMA) 12 months · Joinery work
- Lot 39
- Menuiserie Intérieure (MI) 12 months · Joinery work
- Lot 40
- Carrelage - Faïence (CF) 12 months · Tiling work
- Lot 41
- Peinture - Revêtements (PR) 12 months · Painting work
- Lot 42
- Occultation (OC) 12 months · Installation work of blinds
- Lot 43
- Marquage Routier (MR) 12 months · Road-surface painting work
- Lot 44
- Electricité Haute Tension - TGBT (HT) 12 months · Electrical fitting work
- Lot 45
- Electricité Courants Forts (CFo) 12 months · Electrical fitting work
- Lot 46
- Electricité Courant Faible (CFa) 12 months · Electrical fitting work
- Lot 47
- Gestion Technique Centralisée (GTC) 12 months · Other electrical installation work
- Lot 48
- Chauffage - Ventilation - Climatisation (CVC) 12 months · Heating, ventilation and air-conditioning installation work
- Lot 49
- Plomberie sanitaire (PB) 12 months · Plumbing and sanitary works
- Lot 50
- Fluides Médicaux (FM) 12 months · Plumbing and sanitary works
- Lot 51
- Désamiantage 12 months · Asbestos-removal work
- Lot 52
- Voiries Réseaux Divers (VRD) 12 months · Excavating and earthmoving work
- Lot 53
- Gros-Œuvre (GO) 12 months · Structural shell work
- Lot 54
- Couverture Etanchéité (CE) 12 months · Roof-covering work
- Lot 55
- Menuiserie Métallique - Aluminium (MMA) 12 months · Joinery work
- Lot 56
- Menuiserie Intérieure (MI) 12 months · Joinery work
- Lot 57
- Carrelage - Faïence (CF) 12 months · Tiling work
- Lot 58
- Peinture - Revêtements (PR) 12 months · Painting work
- Lot 59
- Marquage Routier (MR) 12 months · Road-surface painting work
- Lot 60
- Electricité Courants Forts (CFo) 12 months · Electrical fitting work
- Lot 61
- Electricité Courant Faible (CFa) 12 months · Electrical fitting work
- Lot 62
- Chauffage - Ventilation - Climatisation (CVC) 12 months · Heating, ventilation and air-conditioning installation work
- Lot 63
- Plomberie sanitaire (PB) 12 months · Plumbing and sanitary works
- Lot 64
- Fluides Médicaux (FM) 12 months · Plumbing and sanitary works
- Lot 65
- Désamiantage 12 months · Asbestos-removal work
- Lot 66
- Voiries Réseaux Divers (VRD) 12 months · Excavating and earthmoving work
- Lot 67
- Gros-Œuvre (GO) 12 months · Structural shell work
- Lot 68
- Couverture Etanchéité (CE) 12 months · Roof-covering work
- Lot 69
- Menuiserie Métallique - Aluminium (MMA) 12 months · Joinery work
- Lot 70
- Menuiserie Intérieure (MI) 12 months · Joinery work
- Lot 71
- Peinture - Revêtements (PR) 12 months · Painting work
- Lot 72
- Occultation (OC) 12 months · Installation work of blinds
- Lot 73
- Electricité Courants Forts (CFo) 12 months · Electrical fitting work
- Lot 74
- Electricité Courant Faible (CFa) 12 months · Electrical fitting work
- Lot 75
- Gestion Technique Centralisée (GTC) 12 months · Other electrical installation work
- Lot 76
- Chauffage - Ventilation - Climatisation (CVC) 12 months · Heating, ventilation and air-conditioning installation work
- Lot 77
- Plomberie sanitaire (PB) 12 months · Plumbing and sanitary works
- Lot 78
- Fluides Médicaux (FM) 12 months · Plumbing and sanitary works
- Lot 79
- Désamiantage 12 months · Asbestos-removal work
As the official notice states them.
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Report an error in this notice
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 2 days ago
The buyer
Full buyer profileCHU de Reims, en qualité d'établissement support du Groupement Nom complet de l'acheteur : Hospitalier Universitaire de Champagne (GHUC)
This is the only notice from this buyer in the register so far, so there is no record to show yet.
Market context
- open now in Construction work
- 20,149
- median open notice
- €559,898
Who wins in this market
Many suppliersFrance · Construction work
- different companies won awards here
- 19,070
- of the awards went to the three most frequent winners
- 3%
- winners of the last 12 months were new here
- 11,607 of 15,880
- buyers awarded contracts here
- 8,665
Based on 55,204 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners. New: no award from the same buyer or market in the two years before.
Competition
- tenders per lot on average (open and restricted procedures)
- 4.0
- of those lots received a single tender
- 8%
- of the awards went to companies based in another country
- 1%
- of the tenders came from another country
- 8%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
Change history
Every time an official source republished this notice with different content. We watch every source we index, including regional copies of the same notice.
-
Act now
- Submission deadline
-
Was:
October 2, 2026, 00:00 - Now: October 2, 2026, 00:00 1 day earlier
- Scope and criteria
- The description was expanded. Re-read it before you bid.
Follow this tender and we email you the moment it changes. Create account
Similar tenders
Open now
2
days left
€3,000,000
est. value
Awarded before
Never miss a tender like this
2,175 new notices in Construction work in France in the last 7 days. Get an email when new ones appear. Free.
Set up my alertOr follow just its CPV code, Overhaul and refurbishment work: an email when new tenders arrive under it, no account needed.