Skip to content
Aperlena

TED - Tenders Electronic Daily (Publications Office of the EU) verified 1 day ago Contract notice

France - Construction works - Extension of Terminal 3 at Paris Charles de Gaulle Airport

Original France - Travaux de construction - EXTENSION DU TERMINAL 3 DE L’AÉROPORT DE PARIS CHARLES DE GAULLE

Open France Ile-de-France Construction work

Buyer Aéroports de Paris

Key facts

Published
Procedure
Negotiated procedure
  1. Published

TED - Tenders Electronic Daily (Publications Office of the EU) does not publish a closing date for this notice. See the official notice

View the official notice Watch this tender

We email you if the deadline moves or a correction is published. Free. Log in

Summary

Machine-generated summary

Aéroports de Paris is seeking a design-and-build contractor for works at Terminal 3 of Paris Charles de Gaulle airport. The contract covers: construction of a new boarding and deboarding pier; construction of a building of at least one upper floor housing retail space and departure border control facilities; and extension of an existing building containing a baggage delivery hall and an arrivals border control zone. Fitting-out works will follow Aéroports de Paris specifications. The facilities are designed for efficient operation for low-cost carriers while meeting the airport's quality standards. The whole operation must be delivered by the end of 2029 at the latest.

Description

La présente consultation a pour objet la réalisation de travaux de conception réalisation réalisés sur le Terminal 3 de la plateforme de Paris Charles de Gaulle (CDG). Le marché portera notamment sur : i) La construction d'une nouvelle jetée d'embarquement, débarquement ; ii) La construction d'une structure au moins en R+1 hébergeant notamment une surface commerciale ainsi qu'une surface destinée aux contrôles de frontière départ ; iii) L'extension d'un bâtiment existant hébergeant une salle de livraison bagages et une zone de frontière arrivée. Des opérations d'aménagement seront également réalisées conformément aux spécifications d’Aéroports de Paris décrites dans le Programme. Ces ouvrages et extensions sont conçues pour garantir le fonctionnement opérationnel le plus efficace possible aux bénéfices de compagnies qui opèrent selon le modèle dit "low-cost", tout en offrant aux passagers, clients et personnels qui y travaillent des conditions conformes aux exigences de qualité d'Aéroports de Paris. L'ensemble de l'opération doit être livré pour fin 2029 au plus tard.. Compte tenu des développements envisagés à moyen et long terme sur la plateforme de Paris Charles de Gaulle dans le cadre de son schéma directeur, le Terminal 3 pourrait être détruit à l'horizon 2050, soit 20 ans après la livraison des ouvrages et extensions bâtimentaires objet du présent marché. Les offres remises devront tenir compte de ce caractère non nécessairement pérenne.

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Report an error in this notice

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 day ago

What this buyer has paid before

Based on 3 comparable contracts this buyer awarded in this sector over the last 4 years.

Median award
€223.8M
Middle half of past awards
€128.2M to €230.4M

TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it has no mark on the scale. The official documents may state one.

Most recent awards

Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.

Aéroports de Paris

France

notices in the register
217
awards
5
awarded in total
€493.3M

One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.

Who usually wins this buyer's contracts in this sector

Company Wins Total awarded Last win
EIFFAGE CONSTRUCTION EQUIPEMENTS; KARDHAM; WSP; EIFFAGE ENEGIE SYSTEMES IDF; GOYER; CEEF; OASIIS 1 €237.0M Apr 2026
NV BESIX SA 1 €223.8M Sep 2026
JDC AIRPORTS; AGC CABLING; DCP AIRPORTS 1 €32.5M Mar 2026

Based on 3 awards with a linked company profile over the last 5 years.

202 open tenders right now

Market context

TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it cannot be placed among the open notices of its sector. The official documents may state one.

open now in Construction work
28,984
median open notice
€801,630

Similar tenders

Open now

Awarded before

Never miss a tender like this

17,607 new notices in Construction work in France in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language