The Aperlena Verdict
Open raceNo supplier dominates: 17 different companies have won the last 19 comparable contracts from this buyer over 5 years. This is a genuinely open race.
- Expected final price vs the published estimate
- -14.2%
Based on 19 comparable awards by this buyer in this sector over 5 years. Every verdict is recorded before the outcome and graded against the award notice. How we score ourselves.
Summary
Machine-generated summaryA French road authority is procuring the second phase of the Lyon/Gap motorway link, involving construction of a slip road between the A8 (Lyon) and A51 (Gap) motorways. The works include a roughly 1600-metre slip road from the A8 West to the A51 North, two steel bridges (40 m and 210 m, one of them a special structure), about 3000 m2 of retaining walls, heavy signage on both motorways, building demolition, a realigned slip road of about 400 m, three drainage basins and a third lane of about 300 m on the A51.
Description
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 month ago
More from this buyer
Full buyer profile19 open tenders right now
- Motorway resurfacing works - A89 motorway - Road maintenance - Violay/Tarare section (PR 508 to 521, directions 1 and 2) 2 days left
- Bridge renovation works - A9 - Repair works on engineering structure PI 1306 (PR 130+600) 11 days left
- Topographical services - Western Bypass of Montpellier (COM) - External control - Setting out and topographical checks 16 days left
Who usually wins this buyer's contracts in this sector
Based on 19 awards with a linked company profile over the last 5 years.
What this buyer has paid before
Based on 19 comparable contracts this buyer awarded in this sector over the last 4 years.
- Lower quartile
- €1.1M
- Median award
- €4.3M
- Upper quartile
- €16.0M
Most recent awards
- Installation of metal structures - A7 - Valence crossing - Works for an architectural canopy, privacy screens and improvement of an underpass €1,481,399
- Travaux de rénovation de ponts - A62 - Rocade de Toulouse - Mise en place de dispositif de retenue H2 sur la section les Izards / Croix Daurade €120,556
- Travaux de revêtement d'autoroutes - Autoroute A89 - Entretien des chaussées - Secteur Tarare - Section Saint-Romain-de-Poppey/La Tour de Salvagny €4,287,409
- Travaux de construction d'ouvrages hydrauliques - Travaux de réaménagement de la buse métallique OT1896 - Autoroute A63 €1,036,861
- Travaux de revêtement d'autoroutes - A89 Périgueux Est/La Bachellerie - Entretien des chaussées €1,083,211
Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.
Change history
Every time an official source republished this notice with different content. We watch every source we index, including regional copies of the same notice.
-
Read before bidding
- Scope and criteria: The description was expanded. Re-read it before you bid.
Follow this tender and we email you the moment it changes. Create account
Similar tenders
1
day left
€15,000,000
est. value
Market context
- Avg. open tender · Construction work
- €32,569,151
- Buyer track record on Aperlena
- 113 notices tracked · 30 awarded
- €298,846,526 in awarded contracts
Never miss a tender like this
702 new notices in Construction work in France in the last 7 days. Get an email when new ones appear. Free.
Set up my alert