Summary
Machine-generated summaryWorks contract awarded under a negotiated procedure for the construction of the West Montpellier Bypass, covering preparatory works and site clearance, earthworks, drainage and basins, pavements, safety equipment, engineering structures including a viaduct crossing the Mosson, restoration of communications and interchanges, acoustic screens, horizontal and vertical road marking, civil engineering for dynamic equipment and associated networks, fencing, and networks including fibre optic cabling, lighting and traffic lights. The works concern the section at the current RM612, RM132, RM132E2 and RN109 roads, the RN109 interchange and three exits. Quantities include 850,000 m3 of excavation, 550,000 m3 of embankments, 220,000 m3 of capping layer, 41,200 m3 of GB and 16,500 m3 of BBSG. Candidates awarded multiple contracts must mobilise separate human and material resources.
Description
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Report an error in this notice
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 6 days ago
The buyer
Full buyer profileAUTOROUTES DU SUD DE LA FRANCE (ASF)
- notices in the register
- 186
- awards
- 51
- awarded in total
- €393.6M
Who wins its contracts
Many suppliers- different companies won its awards
- 48
- of the awards went to the three most frequent winners
- 10%
- of its calls state an estimated value
- 35%
Based on 50 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 5.6
- of those lots received a single tender
- 5%
- of the awards went to companies based in another country
- 0%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.
Awards most often to
- EUROVIA GRANDS PROJETS FRANCE
- FAYAT ENTREPRISE TP; RAZEL-BEC; EUREA; FREYSSINET FRANCE; BTPS ATLANTIQUE; SADE CGTH; REHACANA; SOGEA SUD-OUEST HYDRAULIQUE; COFEX LITTORAL; GAUTHIER; ETCHART GENIE CIVIL ET MARITIME; AEVIA; COLAS FRANCE; EBGC; SUBTERRA; M3R; RCR; DPSM; VALENTIN; SOGEA NORD-OUEST TRAVAUX PUBLICS
- EON Génie Civil SAS; EUREA SA; FREYSSINET France SAS; SOGEA Rhône-Alpes SAS; REHACANA SAS; GUINTOLI SAS; NGE GENIE CIVIL SAS; EHTP SAS
9 open tenders right now
- Topographical services - Western Bypass of Montpellier (COM) - External control - Setting out and topographical checks 3 days left
- Technical inspection services - ASF network - Technical inspection of engineering structures - Framework agreement with purchase orders for asbestos, lead, PAH and HCT investigation missions on bridges and structures 5 days left
- Technical control and testing services - ASF EST network - Framework agreements for investigation, core drilling and testing 8 days left
Market context
- open now in Construction work
- 20,469
- median open notice
- €533,910
Who wins in this market
Many suppliersFrance · Construction work
- different companies won awards here
- 18,784
- of the awards went to the three most frequent winners
- 3%
- winners of the last 12 months were new here
- 11,471 of 15,597
- buyers awarded contracts here
- 8,474
Based on 52,928 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners. New: no award from the same buyer or market in the two years before.
Competition
- tenders per lot on average (open and restricted procedures)
- 4.0
- of those lots received a single tender
- 8%
- of the awards went to companies based in another country
- 1%
- of the tenders came from another country
- 8%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
Similar tenders
Open now
1
day left
€142,000,000
est. value
Awarded before
Never miss a tender like this
1,079 new notices in Construction work in France in the last 7 days. Get an email when new ones appear. Free.
Set up my alertOr follow just its CPV code, Construction work for highways, roads: an email when new tenders arrive under it, no account needed.