France - Construction works - Chemin d'Ablis repowering - Civil engineering works lot (VRD)

Original France - Travaux de construction - Chemin d’Ablis repowering- Marché de travaux lot VRD

Open France Centre — Val de Loire Construction work

Buyer EDF power solutions

24 days to request

Key facts

Requests to participate by
14:00 (UTC+1)
Procedure
Negotiated procedure
  1. Published
  2. Today
  3. Deadline open for 30 days
  4. Awarded pending

Bidding window

29 days from publication to deadline

Usual length

Notices of this kind (France, negotiated procedure, above the EU threshold) give a median of 29 days, half of them between 21 and 34 days, based on 2,178 notices of the last two years.

View the official notice Watch this tender

If the deadline moves or the notice is corrected, we email you. Log in

Summary

Machine-generated summary

The works concern the repowering of the existing Chemin d'Ablis wind farm, commissioned in 2008 with 26 MM92 2MW turbines totalling 52MW, located in the communes of Vierville, Léthuin, Chatenay, Gouillons, Baudreville, Levesville-la-Chenard, Neuvy-en-Beauce and Fresnay-L'Evêque in Eure-et-Loir (28), Centre Val de Loire region. The new farm will keep 26 turbines, close to previous locations, with 102MW total capacity connected to an existing HTB substation. The VRD lot covers execution studies, preparatory works, earthworks, creation or widening of access roads, platforms, reinstatement of existing platforms, demolition of existing foundations, dismantling, acceptance tests, repairs after commissioning and acceptance documentation, with options possible.

Description

Projet de repowering du parc éolien existant de Chemin d’Ablis, mis en service en 2008, constitué de 26 éoliennes MM92 2MW pour une puissance totale de 52MW, et situé sur les communes de Vierville, Léthuin, Chatenay, Gouillons, Baudreville, Levesville-la-Chenard, Neuvy-en-Beauce et Fresnay-L’Evêque dans le département de l’Eure-et-Loir (28) dans la région Centre Val de Loire. Le nouveau parc sera toujours constitué de 26 WTGs, avec des emplacements assez proches des anciens, pour une puissance totale installée de 102MW (raccordement sur poste HTB existant). Ce marché concerne les travaux de VRD. Le périmètre du marché Lot - VRD est le suivant : • Réalisation des études d'exécution • Travaux préparatoires (y compris les installations de chantier) • Travaux de terrassement • Création ou élargissement des voies d'accès • Réalisation des plates-formes • Remise en état des plates-formes existantes • Démolition des fondations existantes • Démantèlement des plate-formes existantes • Essais de réception • Réparations après mise en service • Dossier de réception Une partie des prestations des différents corps d'état pourraient être en option. Ces options seront définies lors de la consultation. Des travaux supplémentaires pourront être en option. Cette option sera précisée dans le dossier de consultation. Pour des raisons de confidentialité, les documents dédiés à cet AVIS028401 de marché ainsi que votre réponse seront à transmettre sur le site suivant hhttps://pha2.edf.com (AVIS028401), après validation d’un accord de confidentialité.

Terms of the procedure

Tenders go to
pha2.edf.com

As the official notice states them.

Bid or no-bid?

Six questions before you commit a team. Under each one, what the register holds on it. The answers are yours.

  1. Check this first:

    Do we meet every eligibility criterion?

    Negotiated procedure: the buyer negotiates the terms with the suppliers it admits.

    Above the EU threshold: open to companies from any EU country.

  2. Your call:

    Can we deliver this with the team we have?

    The register holds nothing on this. The official documents will.

  3. Your call:

    Do we have two comparable references?

    Comparable work is in Construction work.

  4. In your favour:

    Is the deadline realistic for a proper offer?

    24 days left, 19 of them working days.

  5. Your call:

    Is there a margin at the likely winning price?

    In this country this kind of contract is usually awarded for between €120,643 and €3.3M.

  6. Your call:

    Do we know this buyer?

    The buyer has 28 notices in the register and no pattern of winners yet.

Can I bid?

  • Negotiated procedure: the buyer negotiates the terms with the suppliers it admits. Above the EU threshold: open to companies from any EU country.
  • The notice is written in French.
  • Certificates from another EU country? Check the equivalents on eCertis

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Report an error in this notice

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 18 hours ago

What this market pays

The buyer has too few awards of its own in this sector, so this is the range of the last 2,000 awards for Construction work in France.

Median award
€438,832
Middle half of past awards
€120,643 to €3.3M

TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it has no mark on the scale. The official documents may state one.

Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.

EDF power solutions

France

notices in the register
28

6 open tenders right now

Market context

TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it cannot be placed among the open notices of its sector. The official documents may state one.

open now in Construction work
19,943
median open notice
€533,524

Who wins in this market

Many suppliers

France · Construction work

different companies won awards here
18,661
of the awards went to the three most frequent winners
3%
winners of the last 12 months were new here
11,363 of 15,495
buyers awarded contracts here
8,477

Based on 52,938 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners. New: no award from the same buyer or market in the two years before.

Competition

tenders per lot on average (open and restricted procedures)
4.0
of those lots received a single tender
8%
of the awards went to companies based in another country
1%
of the tenders came from another country
8%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Similar tenders

Open now

Awarded before

Never miss a tender like this

593 new notices in Construction work in France in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Or follow just its CPV code, Construction work: an email when new tenders arrive under it, no account needed.

24 days to request

Open notice

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language