Skip to content
Aperlena

TED - Tenders Electronic Daily (Publications Office of the EU) verified 15 hours ago Contract notice

France - Construction site works - Maintenance and modernisation works at the AP-HP. Sorbonne University Hospital Group

Original France - Travaux de chantier - Travaux d’entretien et de modernisation du Groupe Hospitalo-Universitaire AP-HP. Sorbonne Université

Open France Ile-de-France Construction work

Buyer AP-HP Sorbonne Université

22 days left

Key facts

Closes
12:00 (UTC+1)
Procedure
Open procedure
  1. Published
  2. Today
  3. Deadline open for 28 days
  4. Awarded pending

Bidding window

27 days from publication to deadline

Usual length

Notices of this kind (France, open procedure, above the EU threshold) give a median of 33 days, half of them between 29 and 40 days, based on 60,488 notices of the last two years.

View the official notice Watch this tender

If the deadline moves or the notice is corrected, we email you. Log in

Summary

Machine-generated summary

The AP-HP. Sorbonne University Hospital Group in France is procuring maintenance and modernisation works across its hospital sites, identified as PSL, CFX, SAT, TNN, RTH, TRS and LRG. The works are split into numerous lots by site and trade, covering masonry and hard floors, painting, suspended ceilings, joinery and laboratory benches, exterior joinery, fitting out, soft floor coverings, window cleaning, roofing, waterproofing, electricity, metalwork, HVAC, plumbing, medical fluids, blinds, asbestos removal, road and utility networks, washing works, fire safety systems, resin flooring and work in sewers and buried networks.

Description

Travaux d’entretien et de modernisation du Groupe Hospitalo-Universitaire AP-HP. Sorbonne Université Lot n°1AE Maçonnerie - Sols durs (PSL-CFX); 1B Maçonnerie - Sols durs (SAT); 1C Maçonnerie - Sols durs (TNN); 1D Maçonnerie - Sols durs (RTH/TRS/LRG); 2AE Peinture (PSL/CFX); 2B Peinture (SAT); 2C Peinture (TNN); 2D Peinture (RTH/TRS/LRG); 3AE Faux plafond (PSL/CFX); 3B Faux plafonds (SAT); 3C Faux plafonds (TNN); 3D Faux plafonds (RTH/TRS/LRG); 4A Menuiserie - Paillasses (PSL); 4B Menuiserie - Paillasses (SAT); 4CE Menuiserie - Paillasses (TNN/CFX); 4D Menuiserie - Paillasses (RTH/TRS/LRG); 5AE Menuiseries extérieures (PSL/CFX); 5BCD Menuiseries extérieures (SAT/TNN/RTH/TRS/LRG); 6D Agencement (LRG); 6E Agencement (CFX); 7AE Revêtements de Sols souples (PSL/CFX); 7B Revêtements de Sols souples (SAT); 7C Revêtements de Sols souples (TNN); 7D Revêtements sols souples (RTH/TRS/LRG); 8 Vitretrie (APHP.SU); 9 Couverture (APHP.SU); 10AE Etanchéité (PSL/CFX); 10BCD Etanchéité (SAT/TNN/RTH/TRS/LRG); 11A Electricité (PSL); 11B Electricité (SAT); 11C Electricité (TNN); 11D Electricité (RTH/TRS/LRG); 11E Electricité (CFX); 12AE Métallerie (PSL/CFX); 12BCD Métallerie (SAT/TNN/RTH/TRS/LRG); 13A CVC (PSL); 13B CVC (SAT); 13C CVC (TNN); 13DE CVC (RTH/TRS/LRG/CFX); 14A Plomberie (PSL); 14B Plomberie (SAT); 14C Plomberie (TNN); 14DE Plomberie (RTH/TRS/LRG/CFX); 15AE Fluides médicaux (PSL/CFX); 15BCD Fluides médicaux (SAT/TNN/RTH/TRS/LRG); 16 Stores (APHP.SU); 17AE Désamiantage (PSL/CFX); 17B Désamiantage (SAT); 17C Désamiantage (TNN); 17D Désamiantage (RTH/TRS/LRG); 18AE VRD (PSL/CFX); 18BCD VRD (SAT/TNN/RTH/TRS/LRG); 19 Lessivage (SAT/TNN/TRS/RTH/LRG); 20 SSI (APHP.SU); 21 Résine (APHP.SU); 22 Travaux en égouts et sur réseaux enterrés (APHP.SU)

56 lots

Lot 1
Lot n°1AE Maçonnerie - Sols durs (PSL-CFX) 12 months · Masonry work
Lot 2
1B Maçonnerie - Sols durs (SAT) 12 months · Masonry work
Lot 3
1C Maçonnerie - Sols durs (TNN) 12 months · Masonry work
Lot 4
1D Maçonnerie - Sols durs (RTH/TRS/LRG) 12 months · Masonry work
Lot 5
2AE Peinture (PSL/CFX) 12 months · Painting work
Lot 6
2B Peinture (SAT) 12 months · Painting work
Lot 7
2C Peinture (TNN) 12 months · Painting work
Lot 8
2D Peinture (RTH/TRS/LRG) 12 months · Painting work
Show 48 more lots
Lot 9
3AE Faux plafond (PSL/CFX) 12 months · Installation of suspended ceilings
Lot 10
3B Faux plafonds (SAT) 12 months · Installation of suspended ceilings
Lot 11
3C Faux plafonds (TNN) 12 months · Installation of suspended ceilings
Lot 12
3D Faux plafonds (RTH/TRS/LRG) 12 months · Installation of suspended ceilings
Lot 13
4A Menuiserie - Paillasses (PSL) 12 months · Joinery work
Lot 14
4B Menuiserie - Paillasses (SAT) 12 months · Joinery work
Lot 15
4CE Menuiserie - Paillasses (TNN/CFX) 12 months · Joinery work
Lot 16
4D Menuiserie - Paillasses (RTH/TRS/LRG) 12 months · Joinery work
Lot 17
5AE Menuiseries extérieures (PSL/CFX) 12 months · Joinery work
Lot 18
5BCD Menuiseries extérieures (SAT/TNN/RTH/TRS/LRG) 12 months · Joinery work
Lot 19
6D Agencement (LRG) 12 months · Other building completion work
Lot 20
6E Agencement (CFX) 12 months · Other building completion work
Lot 21
7AE Revêtements de Sols souples (PSL/CFX) 12 months · Laying work of flexible floor coverings
Lot 22
7B Revêtements de Sols souples (SAT) 12 months · Laying work of flexible floor coverings
Lot 23
7C Revêtements de Sols souples (TNN) 12 months · Laying work of flexible floor coverings
Lot 24
7D Revêtements sols souples (RTH/TRS/LRG) 12 months · Laying work of flexible floor coverings
Lot 25
8 Vitretrie (APHP.SU) 12 months · Glazing work
Lot 26
9 Couverture (APHP.SU) 12 months · Roof-covering work
Lot 27
10AE Etanchéité (PSL/CFX) 12 months · Waterproofing work
Lot 28
10BCD Etanchéité (SAT/TNN/RTH/TRS/LRG) 12 months · Waterproofing work
Lot 29
11A Electricité (PSL) 12 months · Electrical fitting work
Lot 30
11B Electricité (SAT) 12 months · Electrical fitting work
Lot 31
11C Electricité (TNN) 12 months · Electrical fitting work
Lot 32
11D Electricité (RTH/TRS/LRG) 12 months · Electrical fitting work
Lot 33
11E Electricité (CFX) 12 months · Electrical fitting work
Lot 34
12AE Métallerie (PSL/CFX) 12 months · Metal roof-covering work
Lot 35
12BCD Métallerie (SAT/TNN/RTH/TRS/LRG) 12 months · Metal roof-covering work
Lot 36
13A CVC (PSL) 12 months · Heating, ventilation and air-conditioning installation work
Lot 37
13B CVC (SAT) 12 months · Heating, ventilation and air-conditioning installation work
Lot 38
13C CVC (TNN) 12 months · Heating, ventilation and air-conditioning installation work
Lot 39
13DE CVC (RTH/TRS/LRG/CFX) 12 months · Heating, ventilation and air-conditioning installation work
Lot 40
14A Plomberie (PSL) 12 months · Plumbing and sanitary works
Lot 41
14B Plomberie (SAT) 12 months · Plumbing and sanitary works
Lot 42
14C Plomberie (TNN) 12 months · Plumbing and sanitary works
Lot 43
14DE Plomberie (RTH/TRS/LRG/CFX) 12 months · Plumbing and sanitary works
Lot 44
15AE Fluides médicaux (PSL/CFX) 12 months · Compressed-air pipeline work
Lot 45
15BCD Fluides médicaux (SAT/TNN/RTH/TRS/LRG) 12 months · Compressed-air pipeline work
Lot 46
16 Stores (APHP.SU) 12 months · Installation work of blinds
Lot 47
17AE Désamiantage (PSL/CFX) 12 months · Asbestos-removal work
Lot 48
17B Désamiantage (SAT) 12 months · Asbestos-removal work
Lot 49
17C Désamiantage (TNN) 12 months · Asbestos-removal work
Lot 50
17D Désamiantage (RTH/TRS/LRG) 12 months · Asbestos-removal work
Lot 51
18AE VRD (PSL/CFX) 12 months · Earthmoving work
Lot 52
18BCD VRD (SAT/TNN/RTH/TRS/LRG) 12 months · Earthmoving work
Lot 53
19 Lessivage (SAT/TNN/TRS/RTH/LRG) 12 months · Paint-stripping work
Lot 54
20 SSI (APHP.SU) 12 months · Fire-alarm system installation work
Lot 55
21 Résine (APHP.SU) 12 months · Floor-covering work
Lot 56
22 Travaux en égouts et sur réseaux enterrés (APHP.SU) 12 months · Installation of pipe system

As the official notice states them.

Bid or no-bid?

Six questions before you commit a team. Under each one, what the register holds on it. The answers are yours.

  1. In your favour:

    Do we meet every eligibility criterion?

    Open procedure: any interested supplier may submit a bid.

    Above the EU threshold: open to companies from any EU country.

  2. Your call:

    Can we deliver this with the team we have?

    The register holds nothing on this. The official documents will.

  3. Your call:

    Do we have two comparable references?

    Comparable work is in Construction work.

  4. In your favour:

    Is the deadline realistic for a proper offer?

    22 days left, 16 of them working days.

  5. Your call:

    Is there a margin at the likely winning price?

    In this country this kind of contract is usually awarded for between €120,000 and €3.2M.

  6. Your call:

    Do we know this buyer?

    The buyer has 13 notices in the register and no pattern of winners yet.

Can I bid?

  • Open procedure: any interested supplier may submit a bid. Above the EU threshold: open to companies from any EU country.
  • The notice is written in French.
  • Certificates from another EU country? Check the equivalents on eCertis

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Report an error in this notice

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 15 hours ago

What this market pays

The buyer has too few awards of its own in this sector, so this is the range of the last 2,000 awards for Construction work in France.

Median award
€431,934
Middle half of past awards
€120,000 to €3.2M

TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it has no mark on the scale. The official documents may state one.

Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.

AP-HP Sorbonne Université

France

notices in the register
13
awards
3
awarded in total
€1.9M

One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.

Recent awards

Market context

TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it cannot be placed among the open notices of its sector. The official documents may state one.

open now in Construction work
20,155
median open notice
€504,000

Who wins in this market

Many suppliers

France · Construction work

different companies won awards here
18,784
of the awards went to the three most frequent winners
3%
winners of the last 12 months were new here
11,471 of 15,597
buyers awarded contracts here
8,474

Based on 52,928 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners. New: no award from the same buyer or market in the two years before.

Competition

tenders per lot on average (open and restricted procedures)
4.0
of those lots received a single tender
8%
of the awards went to companies based in another country
1%
of the tenders came from another country
8%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Similar tenders

Open now

Awarded before

Never miss a tender like this

1,081 new notices in Construction work in France in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Or follow just its CPV code, Siteworks: an email when new tenders arrive under it, no account needed.

22 days left

Open notice

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language