Skip to content
Aperlena

TED - Tenders Electronic Daily (Publications Office of the EU) verified 4 hours ago Contract notice

France - Matériaux de construction routière - Fourniture de matériaux de reprofilage pour les routes départementales de la Gironde réf 2425

Open France Aquitaine Construction materials

Buyer Conseil Départemental de la Gironde

35 days left

Key facts

Closes
16:00 (UTC+1)
Estimated value
€802,000
Procedure
Open procedure
  1. Published
  2. Today
  3. Deadline open for 35 days
  4. Awarded pending

Bidding window

34 days from publication to deadline

Usual length

Notices of this kind (France, open procedure, above the EU threshold) give a median of 33 days, half of them between 29 and 40 days, based on 61,425 notices of the last two years.

This buyer usually gives 32 days (median of its last 71 calls for tender).

View the official notice Watch this tender

If the deadline moves or the notice is corrected, we email you. Log in

Description

L'accord-cadre a pour objet la fourniture de matériaux de reprofilage pour les routes départementales de la Gironde, comprenant des matériaux naturels, recyclés et issus du réemploi. Le présent accord cadre se décompose en (6) six lots qui constitueront autant d'accord cadre mono attributaire à bons de commande sans montant minimum avec un montant maximum Fourniture de matériaux de reprofilage pour les routes départementales de la Gironde sur le secteur de la MDIM du Bassin d'Arcachon; Fourniture de matériaux de reprofilage pour les routes départementales de la Gironde sur le secteur de la MDIM de Graves Entre deux Mers; Fourniture de matériaux de reprofilage pour les routes départementales de la Gironde sur le secteur de la MDIM de Haute Gironde; Fourniture de matériaux de reprofilage pour les routes départementales de la Gironde sur le secteur de la MDIM du Libournais; Fourniture de matériaux de reprofilage pour les routes départementales de la Gironde sur le secteur de la MDIM du Médoc; Fourniture de matériaux de reprofilage pour les routes départementales de la Gironde sur le secteur de la MDIM du Sud Gironde

6 lots

Lot 1
Lot n°1 MDIM du Bassin d'Arcachon estimated €22,000
Lot 2
Lot n°2 MDIM de Graves Entre deux Mers estimated €200,000
Lot 3
Lot n°3 MDIM de Haute Gironde estimated €160,000
Lot 4
Lot n°4 MDIM du Libournais estimated €160,000
Lot 5
Lot n° 5 MDIM du Médoc estimated €60,000
Lot 6
Lot n° 6 MDIM du Sud Gironde estimated €200,000

As the official notice states them.

Bid or no-bid?

Six questions before you commit a team. Under each one, what the register holds on it. The answers are yours.

  1. In your favour:

    Do we meet every eligibility criterion?

    Open procedure: any interested supplier may submit a bid.

    Above the EU threshold: open to companies from any EU country.

  2. Your call:

    Can we deliver this with the team we have?

    Estimated at €802,000.

  3. Your call:

    Do we have two comparable references?

    Comparable work is in Construction materials.

  4. In your favour:

    Is the deadline realistic for a proper offer?

    35 days left, 25 of them working days.

  5. Your call:

    Is there a margin at the likely winning price?

    In this country this kind of contract is usually awarded for between €50,578 and €200,000.

  6. Your call:

    Do we know this buyer?

    The buyer has 126 notices in the register and no pattern of winners yet.

Can I bid?

  • Open procedure: any interested supplier may submit a bid. Above the EU threshold: open to companies from any EU country.
  • The notice is written in French.
  • Certificates from another EU country? Check the equivalents on eCertis

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Report an error in this notice

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 4 hours ago

What this market pays

The buyer has too few awards of its own in this sector, so this is the range of the last 2,000 awards for Construction materials in France.

This notice
€802,000
Median award
€92,305
Middle half of past awards
€50,578 to €200,000

The estimate is larger than three in four past awards.

Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.

Conseil Départemental de la Gironde

France

notices in the register
126
awards
47
awarded in total
€6.4M

Who wins its contracts

Many suppliers
different companies won its awards
43
of the awards went to the three most frequent winners
7%
of its calls state an estimated value
32%

Based on 43 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
3.9
of those lots received a single tender
14%
of the awards went to companies based in another country
0%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.

Who usually wins this buyer's contracts in this sector

Based on 2 awards with a linked company profile over the last 5 years.

9 open tenders right now

Market context

Larger than 81% of the open notices in Construction materials across Europe.

open now in Construction materials
3,693
median open notice
€73,745

Who wins in this market

Many suppliers

France · Construction materials

different companies won awards here
1,888
of the awards went to the three most frequent winners
5%
winners of the last 12 months were new here
1,284 of 1,406
buyers awarded contracts here
1,535

Based on 2,617 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners. New: no award from the same buyer or market in the two years before.

Competition

tenders per lot on average (open and restricted procedures)
2.8
of those lots received a single tender
18%
of the awards went to companies based in another country
1%
of the tenders came from another country
5%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Similar tenders

Open now

Awarded before

Never miss a tender like this

118 new notices in Construction materials in France in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Or follow just its CPV code, Road-construction materials: an email when new tenders arrive under it, no account needed.

35 days left

Open notice

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language