The Aperlena Verdict
Open raceNo supplier dominates: 7 different companies have won the last 8 comparable contracts from this buyer over 5 years. This is a genuinely open race.
Based on 8 comparable awards by this buyer in this sector over 5 years. Every verdict is recorded before the outcome and graded against the award notice. How we score ourselves.
Summary
Machine-generated summaryWorks for the development of public spaces in the Hautefort Nord sector of Strasbourg, phase 1, under the NPNRU Neuhof urban renewal programme. The works include public lighting and dry network installations as well as landscaping works. The contract is divided into lots, each awarded separately, and services are paid at unit prices. Estimated amounts are indicative and cover similar services planned.
Description
Bid or no-bid?
Six questions before you commit a team. Under each one, what the register holds on it. The answers are yours.
Can I bid?
- Open procedure: any interested supplier may submit a bid. Above the EU threshold: open to companies from any EU country.
- The notice is written in French.
- Certificates from another EU country? Check the equivalents on eCertis
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Report an error in this notice
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 10 minutes ago
Expected award price
- likely award for this notice, from its published estimate of €733,659
- €623,610 to €733,659
Comparable awards in this country and sector came in at a median of 98% of their published estimate, half of them between 85% and 100%, based on 237 awards of the last 3 years.
Each award is compared with the estimate of the same lots, framework agreements excluded. A published estimate may include options and renewals, so an award under it is not always a discount.
What this buyer has paid before
Based on 7 comparable contracts this buyer awarded in this sector over the last 4 years.
- This notice
- €733,659
- Median award
- €5.8M
- Middle half of past awards
- €4.7M to €10.1M
The estimate is smaller than three in four past awards.
Most recent awards
- Construction works for school buildings - Energy renovation and accessibility works for the Schwilgué school group in Strasbourg €8,497,284
- Construction works for school buildings - Reconsultation LOT 06 - LOT 21: Energy renovation and accessibility works at the Schwilgué school group in Strasbourg €2,731,895
- Travaux d'amélioration de l'environnement - Marché global de performance relatif à la rénovation énergétique de cinq groupes scolaires sur Strasbourg €27,953,411
- Travaux de gros œuvre - Travaux de réhabilitation partielle du 18 rue du 22 novembre €5,492,400
- Travaux de remise en état et de remise à neuf - Réalisation de travaux de rénovation du 5 Place du Château à Strasbourg €3,870,687
Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.
The buyer
Full buyer profileVille de Strasbourg
- notices in the register
- 141
- awards
- 26
- awarded in total
- €107.1M
Who wins its contracts
Many suppliers- different companies won its awards
- 24
- of the awards went to the three most frequent winners
- 16%
- of its calls state an estimated value
- 45%
Based on 25 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 3.8
- of those lots received a single tender
- 14%
- of the awards went to companies based in another country
- 0%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.
Who usually wins this buyer's contracts in this sector
| Company | Wins | Total awarded | Last win |
|---|---|---|---|
| EIFFAGE CONSTRUCTION ALSACE | 2 | €33.4M | Jul 2026 |
| CONCEPTEURS BATISSEURS ASSEMBLEURS | 1 | €11.7M | Oct 2025 |
| CODEPA; ESPACE BATISPHERE; CONCEPTEURS BATISSEURS ASSEMBLEURS; SOPREMA ENTREPRISES; ACCES PRO; ETABLISSEMENTS ROBERT GEISTEL; JUNGER FILS; SCE CARRELAGE; KRATZEISEN PEINTURE; GDI Isolation; ANDLAUER; BEYER SA; K3E; Electricité VEIT | 1 | €8.5M | Sep 2026 |
| DEMATHIEU BARD ET CONSTRUCTION | 1 | €5.8M | Oct 2025 |
| KAPP Echafaudages; Société KIEFFEL; EIFFAGE ENERGIE SYSTEMES - CLEVIA EST; FRANCOIS ET FILS; K3E SAS; KONE SA; STENGER PLATRE ET STAFF; DIEBOLT ET FILS; KRATZEISEN PEINTURE; GIF SARL | 1 | €3.9M | Dec 2025 |
Based on 8 awards with a linked company profile over the last 5 years.
11 open tenders right now
- Prefabricated constructions - Schwilgué school group in Strasbourg: Modular buildings lot 3 days left
- Repair and maintenance services for playground equipment - Maintenance, supply, installation and inspection of collective play area equipment 3 days left
- Restoration works for the premises of buildings 1 and 7 of the 'des Romains' primary school 3 days left
Market context
Larger than 49% of the open notices in Construction work across Europe.
- open now in Construction work
- 29,748
- median open notice
- €775,343
Who wins in this market
Many suppliersFrance · Construction work
- different companies won awards here
- 18,790
- of the awards went to the three most frequent winners
- 3%
- winners of the last 12 months were new here
- 11,470 of 15,597
- buyers awarded contracts here
- 8,474
Based on 52,964 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners. New: no award from the same buyer or market in the two years before.
Competition
- tenders per lot on average (open and restricted procedures)
- 4.0
- of those lots received a single tender
- 8%
- of the awards went to companies based in another country
- 1%
- of the tenders came from another country
- 8%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
Similar tenders
Open now
4
days left
€389,200
est. value
2
days left
€170,000
est. value
Awarded before
-
GEOTHERMIE ECOLE NOCE €296,850
Never miss a tender like this
1,084 new notices in Construction work in France in the last 7 days. Get an email when new ones appear. Free.
Set up my alertOr follow just its CPV code, Installation of road lighting equipment: an email when new tenders arrive under it, no account needed.