Awarded to
- Awarded value
- €113,510
- Record with this buyer
- 1 first contract from this buyer in the register
Summary
Machine-generated summaryEtablissement Public Loire awarded a contract under the Preliminary Studies Programme (PEP) of the Loir flood prevention action programme (PAPI). The contract covered three lots: a study of rain runoff hazard on the EPCI Loir Luce Berce, a similar study on the EPCI Territoires Vendomois, Perche and Haut Vendomois, and a flood wave propagation study. The actions concerned improved knowledge and awareness of risk and flood monitoring and forecasting. The contract was awarded to ARTELIA and BRL Ingenierie for EUR 113,510.
Description
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Report an error in this notice
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 week ago
What this buyer has paid before
Based on 7 comparable contracts this buyer awarded in this sector over the last 4 years.
- This award
- €113,510
- Median award
- €478,274
- Middle half of past awards
- €212,674 to €565,886
The award is smaller than three in four past awards.
Most recent awards
- Services d'ingénierie - Visites Techniques Approfondies (VTA) des systèmes d'endiguement de la plateforme de Nevers, missions de maîtrise d'oeuvre sur désordres et appui technique en cas de crue, et analyse des documents d'organisation en toutes circonstances (2 lots) €527,762
- Étude d'impact sur l'environnement pour la construction - Études hydrauliques sur le bassin du Cher (6 lots) €217,617
- Étude d'impact sur l'environnement pour la construction - Etudes hydrauliques pour l'amélioration de la connaissance des risques d'inondation (4 lots) €207,730
- Services de conseil en matière d'ingénierie et de construction - Etude de fiabilisation du système d'endiguement du Val d'Authion (2 lots) €478,274
Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.
The buyer
Full buyer profileEtablissement Public Loire
- notices in the register
- 53
- awards
- 19
- awarded in total
- €6.1M
Who wins its contracts
Many suppliers- different companies won its awards
- 18
- of the awards went to the three most frequent winners
- 17%
- of its calls state an estimated value
- 13%
Based on 18 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- of the awards went to companies based in another country
- 0%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
Recent awards
- Services de réparation et d'entretien de matériel de distribution électrique - Barrage de NAUSSAC et de VILLEREST : Maintenance des installations Haute Tension
- Services d'ingénierie - Visites Techniques Approfondies (VTA) des systèmes d'endiguement de la plateforme de Nevers, missions de maîtrise d'oeuvre sur désordres et appui technique en cas de crue, et analyse des documents d'organisation en toutes circonstances (2 lots)
- Réalisation et entretien d'espaces verts - Fauchage des systèmes d'endiguement de la Plateforme d'Orléans dans le Loiret (45) - (5 lots)
1 open tender right now
Market context
- open now in Architecture & engineering services
- 7,697
- median open notice
- €300,000
Who wins in this market
Many suppliersFrance · Architecture & engineering services
- different companies won awards here
- 7,284
- of the awards went to the three most frequent winners
- 3%
- winners of the last 12 months were new here
- 4,995 of 5,688
- buyers awarded contracts here
- 4,630
Based on 12,683 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners. New: no award from the same buyer or market in the two years before.
Competition
- tenders per lot on average (open and restricted procedures)
- 6.4
- of those lots received a single tender
- 6%
- of the awards went to companies based in another country
- 1%
- of the tenders came from another country
- 5%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
Similar tenders
Open now
7
days left
€100,000
est. value
2
days to request
€2,096,640
est. value
6
days left
€4,000,000
est. value
6
days left
€4,000,000
est. value
Awarded before
Never miss a tender like this
576 new notices in Architecture & engineering services in France in the last 7 days. Get an email when new ones appear. Free.
Set up my alertOr follow just its CPV code, Environmental impact assessment for construction: an email when new tenders arrive under it, no account needed.