Deutschland - Bauarbeiten für Rohrleitungen, Fernmelde- und Stromleitungen, für Autobahnen, Straßen, Flugplätze und Eisenbahnen; Nivellierungsarbeiten - Microtunnel Landfall Vierow
Negotiated procedureThe buyer selects candidates, then negotiates the offers before choosing.Full entryAbove the EU thresholdA contract large enough that EU-wide rules apply and it must be published on TED.Full entry
CPV codeThe EU's common vocabulary for what is being bought: an eight-digit code every notice carries.Full entry
Deutschland - Bauarbeiten für Rohrleitungen, Fernmelde- und Stromleitungen, für Autobahnen, Straßen, Flugplätze und Eisenbahnen; Nivellierungsarbeiten - Microtunnel Landfall Vierow
Buyer: 50Hertz Offshore GmbH; 50Hertz Connectors GmbH
Country: Germany
Procedure: Negotiated procedure
Sector (CPV): Construction work (45230000)
Aperlena: https://aperlena.com/en/t/deutschland-bauarbeiten-fur-rohrleitungen-fernmelde-und-stromleitungen-fur-autobahnen-strassen-flugplatze-und-eise-c37ae1c8dc
Official notice: https://ted.europa.eu/en/notice/-/detail/476714-2026
Bidding is closed. An award or a correction on this notice: an email when the register sees it.
Log in
Published
Awardedpending
01
Description
As part of the scope of this tender, the Contractor shall be responsible for the design and construction of two microtunnels (MTs). Each microtunnel shall accommodate ducts for three high-voltage direct current (HVDC) power cables and fibre optic cables. The landfall for the planned Ostwind 4 (OW4) HVDC cable system is located in Vierow, on the shores of the Greifswalder Bodden in Mecklenburg-Western Pomerania, Germany. For this landfall, the construction of one microtunnel with cable ducts is foreseen. The landfall for the planned Bornholm Energy Island (BEI) HVDC cable system is likewise located in Vierow, at the Greifswalder Bodden. Here, the construction of one microtunnel with cable ducts is also planned. The landfall for the BEI project on the island of Bornholm is not included in the scope of this tender. Furthermore, the delivery and installation of the power cables are not part of this tender either. The landfall structure will be used to accommodate power cables. The subject of the contract is the full scope required for the planning and execution of the complete landing structure.
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)