TED - Tenders Electronic Daily (Publications Office of the EU) verified 6 days ago Contract notice

Germany - Overhead line construction works - Remaining works tender BNR_UMS_Altlandsberg

Original Deutschland - Bauarbeiten für Freileitungen - Ausschreibung Restarbeiten BNR_UMS_Altlandsberg

Open Germany Brandenburg Construction work

Buyer 50Hertz Transmission GmbH

Key facts

Published
Procedure
Negotiated procedure
  1. Published

TED - Tenders Electronic Daily (Publications Office of the EU) does not publish a closing date for this notice. See the official notice

View the official notice Watch this tender

We email you if the deadline moves or a correction is published. Free. Log in

Summary

Machine-generated summary

The contract covers remaining works on the 380 kV line conversion at Altlandsberg, where the Uckermark line (UMS) (483/484) crosses the Berliner Nordring (BNR) (293/294). Section Lot 1, construction phase B1-C2, runs from tower 12aM (B1) and tower 1aM (B2) to tower 279/459n (B3), tower 217 and 216_1 at Wustermark (C1) and tower marking (C2). Work starts in calendar week 10/2026 and commissioning follows in week 15/2026. After rerouting at Malchow substation, the 220 kV line 293/294 is dismantled from week 10/2026 and line 517/520 from week 15/2026, with realignment of lines 483 and 484 including earthwires and optical fibre cable alternating between weeks 18 and 21 of 2026.

Description

Los 1 Bauabschnitt B1-C2: B1 - Mast 12aM / B2 - Mast 1aM / B3 - Mast 279/459n / C1 - Mast 217 und 216_1 Wustermark / C2 - Mastkennzeichnung Abschnitt: B1 - C2 Baustart KW10/2026 und Inbetriebnahme KW15/2026 Los 1 Bauabschnitt Auskreuzung 380kV - Leitung UMS und BNR Leitunsgumbau der beiden 380-kV Leitungen Uckermarkleitung (UMS) (483/484) + Berliner Nordring (BNR) (293/294) bei Altlandsberg Im Bereich Altlandsberg überkreuzt aktuell die UMS in den Mastfeldern 335 - 336 den BNR im Bereich Mast 8 - 9. Im Zusammenhang mit dem Umbau zur Einbindung des UW Malchow muss dieser Zustand aufgelöst werden. Nach Abschluss der Leitungsumbindungen am UW Malchow sind die 220-kV Ltg. 293/294 und die 380-kV Ltg. 517/520 zwischen Neuenhagen und Malchow dauerhaft außer Betrieb und können im Kreuzungsfeld demontiert werden. Rückbau 293/294 ab KW10/2026 und 517/520 ab KW 15/2026. Schwenkung 483 + 484 inklusive ES + LWL wechselweise in KW18 bis 21/2026

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Report an error in this notice

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 6 days ago

What this market pays

The buyer has too few awards of its own in this sector, so this is the range of the last 2,000 awards for Construction work in Germany.

Median award
€274,906
Middle half of past awards
€118,863 to €717,961

TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it has no mark on the scale. The official documents may state one.

Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.

50Hertz Transmission GmbH

Germany

notices in the register
80
awards
14
awarded in total
€129.3M

Who wins its contracts

Moderately concentrated
different companies won its awards
6
of the awards went to the three most frequent winners
64%

Based on 11 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

of the awards went to companies based in another country
0%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

This buyer has no award history in this sector yet. Usual winners, Construction work - Germany

Company Wins Total awarded Last win
Fliesen Röhlich GmbH 96 €15.6M Oct 2026
Lindner SE 89 €155.8M Sep 2026
LEONHARD WEISS GmbH & Co. KG 80 €183.0M Sep 2026
STRABAG AG 70 €162.7M Oct 2026
KONE GmbH 66 €16.6M Sep 2026

Based on 27122 awards with a linked company profile over the last 2 years.

62 open tenders right now

Market context

TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it cannot be placed among the open notices of its sector. The official documents may state one.

open now in Construction work
29,507
median open notice
€806,726

Who wins in this market

Many suppliers

Germany · Construction work

different companies won awards here
12,812
of the awards went to the three most frequent winners
1%
buyers awarded contracts here
2,979

Based on 27,122 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
6.3
of those lots received a single tender
7%
of the awards went to companies based in another country
1%
of the tenders came from another country
1%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Similar tenders

Open now

1

day left

Painting works

Germany Construction work Handwerkskammer Ostwestfalen-Lippe zu Bielefeld

Awarded before

Never miss a tender like this

1,842 new notices in Construction work in Germany in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language