TED - Tenders Electronic Daily (Publications Office of the EU) verified 3 hours ago Contract notice

Modernisation of mountain railway structures 6 to 10, Germany

Original Deutschland - Bauarbeiten für Brücken - Modernisierung Bergbahn Bauwerke 6-10

Open Germany Karlsruhe Construction work

Buyer Stadtwerke Heidelberg GmbH

34 days left

Key facts

Closes
11:00 (UTC+1)
Procedure
Open procedure
  1. Published
  2. Today
  3. Deadline open for 35 days
  4. Awarded pending

Bidding window

34 days from publication to deadline

Usual length

Notices of this kind (Germany, open procedure, above the EU threshold) give a median of 31 days, half of them between 28 and 34 days, based on 84,618 notices of the last two years.

View the official notice Watch this tender

If the deadline moves or the notice is corrected, we email you. Log in

Summary

Machine-generated summary

Modernisation of bridge structures 6 to 10 of a mountain railway, divided into three sections. Section 1 covers bridge works, including about 2,500 m3 of excavation, 420 m2 of soldier pile retaining wall, 36 anchors, 1,000 m2 of bound road surface, 490 m2 of joint grouting, 250 tonnes of grouting mortar, 260 m of CFRP laminates, 27 tonnes of temporary steel structures and 5 tonnes of historic steelwork. Section 2 covers civil engineering and pipe laying, around 120 to 686 m of PE pipes, 100 m of PVC pipe, several hundred metres of power, telephone and fibre optic cables, and connections to the existing network. Section 3 covers sewerage works, including trench excavation, 68 m of PVC pipes DN 315, temporary channels, control shafts, relaying of natural stone paving and 280 tonnes of soil removal.

Description

Modernisierung Bergbahn - Brückenbauwerke 6-10 - Abschnitt 1: Brückenbauarbeiten - Abschnitt 2: Tief- und Leitungsbauarbeiten - Abschnitt 3: Abwasserarbeiten - Abschnitt 1: Brückenbauarbeiten: unverbindliche Hauptmengen: Aushub: 2500m3 Fläche Trägerbohlwand: 420m2 Anzahl Anker: 36 St Fläche gebundener Straßenbelag: 1000m2 Fläche Fugenverpressung: 490m2 Menge Verpressmörtel: 250to Menge an CFK-Lamellen: 260m Tonnage Stahlbau Baubehelfe: 27to Tonnage historischer Stahlbau: 5to - Abschnitt 2: Tief- und Leitungsbauarbeiten: Verlegung von ca. 120 m d 110 -d 125 PE Verlegung von ca. 686 m d 90 PE Verlegung von ca. 100 m d 63 PVC Verlegung von ca. 230 m NA2XS(F)2Y 3x1x240mm2 Verlegung von ca. 775 m NAYCWY 3x150/150mm2 Verlegung von ca. 160 m NYCY 4x6/6mm2 Verlegung von ca. 55 m NYCWY 4x25/16mm2 Verlegung von ca. 70 m 30x2x0,8mm2 FM Verlegung von ca. 140 m 4x12 LWL Verlegung von ca. 27 m VW d 125 PE Verlegung von ca. 9 m AW d 50 PE Herstellung von Verbindungen zum bestehenden Leitungsnetz. - Abschnitt 3: Abwasserarbeiten: unverbindliche Hauptmengen: Rohrgrabenaushub bis 2,0 m 140 m3 PVC-Rohre DA 315 68 m2 Natursteinpflaster aufnehmen, wiederverlegen 50 m3 Provisorischer Kanal Stahl DN 300 BW 8, Länge/Stützweite 13 m 1 psch Provisorischer Kanal PVC-Rohre DN 400 35 m Kontrollschächte DN 1000, T < 2,0 m 3 Stk Kontrollschächte DN 630, T < 2,0 m 2 Stk Abtransport von Boden 280 to.

Bid or no-bid?

Six questions before you commit a team. Under each one, what the register holds on it. The answers are yours.

  1. In your favour:

    Do we meet every eligibility criterion?

    Open procedure: any interested supplier may submit a bid.

    Above the EU threshold: open to companies from any EU country.

  2. Your call:

    Can we deliver this with the team we have?

    The register holds nothing on this. The official documents will.

  3. Your call:

    Do we have two comparable references?

    Comparable work is in Construction work.

  4. In your favour:

    Is the deadline realistic for a proper offer?

    34 days left, 25 of them working days.

  5. Your call:

    Is there a margin at the likely winning price?

    In this country this kind of contract is usually awarded for between €118,863 and €717,961.

  6. Your call:

    Do we know this buyer?

    The buyer has 25 notices in the register and no pattern of winners yet.

Can I bid?

  • Open procedure: any interested supplier may submit a bid. Above the EU threshold: open to companies from any EU country.
  • The notice is written in German.
  • Certificates from another EU country? Check the equivalents on eCertis

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Report an error in this notice

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 3 hours ago

What this market pays

The buyer has too few awards of its own in this sector, so this is the range of the last 2,000 awards for Construction work in Germany.

Median award
€274,906
Middle half of past awards
€118,863 to €717,961

TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it has no mark on the scale. The official documents may state one.

Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.

Stadtwerke Heidelberg GmbH

Germany

notices in the register
25
awards
6

One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.

This buyer has no award history in this sector yet. Usual winners, Construction work - Germany

Company Wins Total awarded Last win
Fliesen Röhlich GmbH 96 €15.6M Oct 2026
Lindner SE 89 €155.8M Sep 2026
LEONHARD WEISS GmbH & Co. KG 80 €183.0M Sep 2026
STRABAG AG 70 €162.7M Oct 2026
KONE GmbH 66 €16.6M Sep 2026

Based on 27122 awards with a linked company profile over the last 2 years.

16 open tenders right now

Market context

TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it cannot be placed among the open notices of its sector. The official documents may state one.

open now in Construction work
29,504
median open notice
€812,995

Who wins in this market

Many suppliers

Germany · Construction work

different companies won awards here
12,812
of the awards went to the three most frequent winners
1%
buyers awarded contracts here
2,979

Based on 27,122 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
6.3
of those lots received a single tender
7%
of the awards went to companies based in another country
1%
of the tenders came from another country
1%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Similar tenders

Open now

Awarded before

Never miss a tender like this

1,842 new notices in Construction work in Germany in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

34 days left

Open notice

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language