Summary
Machine-generated summaryThe contract covers the replacement construction of the Mühlenbach and path railway overpass in Greven, located on the electrified route 2931 from Hamm to Emden at km 187.521. The existing bridge is in a dilapidated state and will be replaced at the same location with deep-founded abutments and new superstructures. The works are divided into two lots: lot 1 includes civil engineering and structural work, while lot 2 covers overhead line work, alongside accompanying measures for signalling, telecommunications and cable works.
Description
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Report an error in this notice
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 month ago
More from this buyer
Full buyer profile540 open tenders right now
- Track superstructure works - ESTW Flörsheim project, superstructure including removal of insulated joints and RZ turnout measure in three lots 1 day left
- Steel bridge construction works - ABS Leipzig - Dresden, replacement bridge Neu-Medessen including replacement feed at Priestewitz 1 day left
- Track renewal works - Package 302057 - Investment container B04 1 day left
Recent awards
Similar tenders
1
day left
€14,000,000
est. value
Market context
- Avg. open tender · Construction work
- €32,600,825
- Buyer track record on Aperlena
- 3,967 notices tracked · 2,844 awarded
- €2,941,186,849 in awarded contracts
Never miss a tender like this
1,712 new notices in Construction work in Germany in the last 7 days. Get an email when new ones appear. Free.
Set up my alert