Summary
Machine-generated summaryDB InfraGO AG, Geschäftsbereich Fahrweg (Bukr 16), awarded a contract for the renewal of the Mühlenbach and Weg railway overbridge in Greven on the electrified line 2931 from Hamm Pbf to Emden Rbf at kilometre 187,521. The overbridge is in a dilapidated condition. It is a supported bridge with two girder grid superstructures and two massive shallow-founded gravity abutments. The replacement structure will be built at the same location with deep-founded abutments and girder grid superstructures. Accompanying measures (LST, TK, OLA, KTB) will be carried out alongside. The contract was awarded to IHT Ingenieur-, Hoch- und Tiefbau G on 12 August 2026.
Description
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Report an error in this notice
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 3 weeks ago
More from this buyer
Full buyer profile534 open tenders right now
- Tunnel, shaft and underpass construction works - 12 culverts and two retaining walls km 2,694 - 34,863, line 5320 Treuchtlingen - Nuremberg 1 day left
- Construction of railway bridges - Renewal of the Deffernik railway bridge at km 126.965, line 5634 Landshut - Bayerisch Eisenstein 1 day left
- Railway line construction works - Cable civil engineering line 3730 lot 1 km 2.135 to km 17.59, lot 2 km 17.59 to km 31.44 1 day left
Recent awards
Similar tenders
Market context
- Avg. open tender · Construction work
- €32,823,915
- Buyer track record on Aperlena
- 3,921 notices tracked · 2,809 awarded
- €2,941,186,849 in awarded contracts
Never miss a tender like this
1,716 new notices in Construction work in Germany in the last 7 days. Get an email when new ones appear. Free.
Set up my alert