TED - Tenders Electronic Daily (Publications Office of the EU) verified 1 week ago Prior information notice

Denmark - Construction work: heating plants - Establishment of a heat pump at Hjørring Wastewater Treatment Plant

Original Danmark - Bygge-anlægsarbejde: varmeværker - Etablering af varmepumpe på Hjørring Renseanlæg

Upcoming Denmark Nordjylland Construction work

Buyer Hjørring Varmeforsyning

€8.7M estimated value · €8,697,281 · converted from DKK

Key facts

Published
  1. Published

TED - Tenders Electronic Daily (Publications Office of the EU) does not publish a closing date for this notice. See the official notice

View the official notice Watch this tender

We email you if the deadline moves or a correction is published. Free. Log in

Summary

Machine-generated summary

Hjørring Varmeforsyning is to establish a new heat pump system at Hjørring Wastewater Treatment Plant that uses heat from wastewater for district heating production. The heat pump system must be dimensioned at 7 MW with a tolerance of -0.2/+0.5 MW. The heat pumps must be able to cool the wastewater down to 2 degrees C and be controlled to achieve the best possible COP. The contract also covers the construction of a new building to house the heat pump system and its associated components. The contract is not divided into sub-contracts. Signing of the agreement is conditional on approval of the project by the board of Hjørring Varmeforsyning.

Description

Hjørring Varmeforsyning, skal etablere et nyt varmepumpesystem på Hjørring Renseanlæg, som udnytter varmen fra spildevandet til fjernvarmeproduktion. Varmepumpesystemet skal være dimensioneret til 7MW ­0,2/+0,5. Varmepumperne skal kunne køle spildevandet ned til 2°C og styres efter bedst mulige COP. Denne entreprise omhandler også opførelse af en ny bygning, hvori varmepumpeanlægget og tilhørende komponenter skal placeres). Det udbudte arbejde er mere detaljeret beskrevet i udbudsmaterialet. Under henvisning til Forsyningsvirksomhedsdirektivets artikel 65 kan det oplyses, at kontrakten i dette udbud ikke opdeles i (yderligere) delkontrakter, da ordregiver har vurderet, at den henset til opgavens karakteristika, samt de økonomiske, ansvars­ og udførelsesmæssige forhold løses mest hensigtsmæssigt i en entreprise. Der ydes ikke vederlag for deltagelsen i dette udbud. Aftaleindgåelse er betinget af at bestyrelsen for Hjørring Varmeforsyning godkender projektet. Hjørring Varmeforsyning, skal etablere et nyt varmepumpesystem på Hjørring Renseanlæg, som udnytter varmen fra spildevandet til fjernvarmeproduktion. Varmepumpesystemet skal være dimensioneret til 7 MW ­0,2/+0,5. Varmepumperne skal kunne køle spildevandet ned til 2°C og styres efter bedst mulige COP. Denne entreprise omhandler også opførelse af en ny bygning, hvori varmepumpeanlægget og tilhørende komponenter skal placeres). Det udbudte arbejde er mere detaljeret beskrevet i udbudsmaterialet. Under henvisning til Forsyningsvirksomhedsdirektivets artikel 65 kan det oplyses, at kontrakten i dette udbud ikke opdeles i (yderligere) delkontrakter, da ordregiver har vurderet, at den henset til opgavens karakteristika, samt de økonomiske, ansvars­ og udførelsesmæssige forhold løses mest hensigtsmæssigt i en entreprise. Der ydes ikke vederlag for deltagelsen i dette udbud. Aftaleindgåelse er betinget af at bestyrelsen for Hjørring Varmeforsyning godkender projektet.

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Report an error in this notice

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 week ago

Hjørring Varmeforsyning

Denmark

notices in the register
5
awards
2
awarded in total
€6.4M

Who usually wins this buyer's contracts in this sector

Company Wins Total awarded Last win
Krebs A/S 1 €5.1M Jun 2026
Arkil A/S 1 €1.3M Jun 2026

Based on 2 awards with a linked company profile over the last 5 years.

Market context

open now in Construction work
19,935
median open notice
€547,553

Who wins in this market

Many suppliers

Denmark · Construction work

different companies won awards here
236
of the awards went to the three most frequent winners
9%
buyers awarded contracts here
173

Based on 359 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
4.1
of those lots received a single tender
4%
of the awards went to companies based in another country
3%
of the tenders came from another country
1%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Similar tenders

Open now

Awarded before

Never miss a tender like this

25 new notices in Construction work in Denmark in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Or follow just its CPV code, Heating plant construction work: an email when new tenders arrive under it, no account needed.

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language