TED - Tenders Electronic Daily (Publications Office of the EU) verified 1 hour ago Contract notice

Czechia - Road construction - I/45 Nove Herminovy - Zator, Stage I

Original Česko - Výstavba silnic - I/45 Nové Heřminovy - Zátor, I. etapa

Open Czechia Moravskoslezsko Construction work

Buyer Ředitelství silnic a dálnic s. p.; Povodí Odry, státní podnik

35 days left

Key facts

Closes
08:00 (UTC+1)
Estimated value
€99.4M
€99,427,871 · converted from CZK
Procedure
Open procedure
  1. Published
  2. Today
  3. Deadline open for 35 days
  4. Awarded pending

Bidding window

35 days from publication to deadline

Usual length

Notices of this kind (Czechia, open procedure, above the EU threshold) give a median of 31 days, half of them between 28 and 34 days, based on 20,461 notices of the last two years.

This buyer usually gives 30 days (median of its last 20 calls for tender).

View the official notice Watch this tender

If the deadline moves or the notice is corrected, we email you. Log in

Summary

Machine-generated summary

The works involve building the first stage of the relocation of road I/45, a first-class road approximately 5.0 km long in category S 11.5/90, connected to the existing I/45 road at both ends. The relocation between Nove Herminovy and Zator is necessitated by flood protection measures on the upper Opava river and the Nove Herminovy reservoir, which would leave the current road inside the flood area. The route includes three roundabouts (in Nove Herminovy, Loucky near Zator and Zator), an at-grade junction with road III/4583, several bridges, retaining walls, supporting walls along the right-bank service road, noise protection measures near residential areas, and adjustments and connections to affected lower-class roads. Works follow project documentation prepared by the consortium 'Morava - RD PP pro stredni zakazky BIM 2020'.

Description

Předmětem stavby je vybudování I. etapy přeložky silnice I/45, to je silnice I. třídy v délce cca 5.0 km v kategorii S 11.5/90, která je na obou koncích napojena na stávající silnici I/45. Přeložka silnice I/45 v úseku mezi Novými Heřminovy a obcí Zátor je vyvolanou investicí z důvodu návrhu protipovodňových opatření na Horní Opavě a Vodního díla Nové Heřminovy. Stávající silnice bude po realizaci vodního díla přerušena a ocitne se v území zátopy. Z tohoto důvodu je nutné silnici I/45 přemístit nad úroveň zátopy nádrže Nové Heřminovy, stavba silnice I/45 tedy řeší přeložení stávající silnice I/45 mimo zátopové území vodního díla Nové Heřminovy. Na trase přeložky silnice I/45 je z důvodu křížení navržena okružní křižovatka v obci Nové Heřminovy (napojení sil. III/4581 směr Milotice a místních komunikací), dále úrovňová křižovatka se silnicí III/4583 (směr Čaková), okružní křižovatka v Loučkách u Zátoru (napojení stávající komunikace I/45 a místní komunikace) a okružní křižovatka v obci Zátor (napojení silnice III/4585 směr Brantice resp. III/45910 směr Lichnov a místní komunikace). Na trase přeložky silnice I/45 bude vybudováno několik mostních objektů a v místech hlubokých zářezů budou vybudovány zárubní zdi. V souběhu s pravobřežní obslužnou komunikaci jsou navrženy opěrné zdi. V místech, kde navrhovaná silnice I/45 prochází územím s objekty určených k trvalému bydlení, jsou navržena protihluková opatření. Součástí stavby budou dále úpravy a napojení komunikací nižších tříd, které budou dotčeny stavbou silnice I/45. Práce budou provedeny dle projektové dokumentace zpracované sdružením „Morava - RD PP pro střední zakázky BIM 2020“, vedoucí společník SHB a.s. a.s., IČO 25324365.

Bid or no-bid?

Six questions before you commit a team. Under each one, what the register holds on it. The answers are yours.

  1. In your favour:

    Do we meet every eligibility criterion?

    Open procedure: any interested supplier may submit a bid.

    Above the EU threshold: open to companies from any EU country.

  2. Your call:

    Can we deliver this with the team we have?

    Estimated at €99.4M.

  3. Your call:

    Do we have two comparable references?

    Comparable work is in Construction work.

  4. In your favour:

    Is the deadline realistic for a proper offer?

    35 days left, 26 of them working days.

  5. Your call:

    Is there a margin at the likely winning price?

    In this country this kind of contract is usually awarded for between €207,608 and €11.9M.

  6. Your call:

    Do we know this buyer?

    The buyer has 20 notices in the register and no pattern of winners yet.

Can I bid?

  • Open procedure: any interested supplier may submit a bid. Above the EU threshold: open to companies from any EU country.
  • The notice is written in Czech.
  • Certificates from another EU country? Check the equivalents on eCertis

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Report an error in this notice

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 hour ago

What this market pays

The buyer has too few awards of its own in this sector, so this is the range of the last 2,000 awards for Construction work in Czechia.

This notice
€99.4M
Median award
€2.4M
Middle half of past awards
€207,608 to €11.9M

The estimate is larger than three in four past awards.

Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.

Ředitelství silnic a dálnic s. p.; Povodí Odry, státní podnik

Czechia

notices in the register
20

Who wins its contracts

of its calls state an estimated value
100%

This buyer has no award history in this sector yet. Usual winners, Construction work - Czechia

Company Wins Total awarded Last win
VESIBA, s.r.o. 88 €18.0M Sep 2026
STRABAG a.s. 70 €139.5M Sep 2026
EUROVIA CZ a.s. 67 €107.6M Sep 2026
Značky Morava, a.s. 67 €46.1M Sep 2026
PORR a.s. 61 €59.5M Sep 2026

Based on 3204 awards with a linked company profile over the last 2 years.

7 open tenders right now

Market context

Larger than 96% of the open notices in Construction work across Europe.

open now in Construction work
28,901
median open notice
€812,445

Who wins in this market

Many suppliers

Czechia · Construction work

different companies won awards here
1,198
of the awards went to the three most frequent winners
7%
buyers awarded contracts here
484

Based on 3,204 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Similar tenders

Open now

Awarded before

Never miss a tender like this

5,461 new notices in Construction work in Czechia in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

35 days left

Open notice

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language