TED - Tenders Electronic Daily (Publications Office of the EU) verified 3 hours ago Contract notice

Belgium - Laying of cables - 57/43/3/26/118 Projects North - Power Distribution & Substations - Civil works, Framework agreement, Lot 1: East and West Flanders, Lot 2: Antwerp, Limburg and Flemish Brabant

Original België - Leggen van kabels - 57/43/3/26/118 Projects North - Power Distribution & Substations. Buitenwerken (graaf- en grondwerken, kabelaanleg, kabelwegen/trekputten/betonsleuven, kasten en verlichtingspylonen). Raamovereenkomst. Perceel 1: Provincies Oost- en West-Vlaanderen. Perceel 2: Provincies Antwerpen, Limburg en Vlaams-Brabant.

Open Belgium Prov. Oost-Vlaanderen Construction work

Buyer Infrabel nv

13 days left

Key facts

Closes
11:00 (UTC+2)
Competition
Open race
  1. Published
  2. Today
  3. Deadline open for 13 days
  4. Awarded pending

Bidding window

13 days from publication to deadline

Shorter than usual

Notices of this kind (Belgium, open procedure, above the EU threshold) give a median of 30 days, half of them between 17 and 37 days, based on 10,446 notices of the last two years. Fewer days than three in four comparable notices. Check the documents early and ask questions before the clarification deadline.

This buyer usually gives 34 days (median of its last 65 calls for tender).

View the official notice Watch this tender

If the deadline moves or the notice is corrected, we email you. Log in

The Aperlena Verdict

Open race

No supplier dominates: 18 different companies have won the last 19 comparable contracts from this buyer over 5 years. This is a genuinely open race.

Based on 19 comparable awards by this buyer in this sector over 5 years. Every verdict is recorded before the outcome and graded against the award notice. How we score ourselves.

Summary

Machine-generated summary

A framework agreement for works relating to power distribution and substations. The works mainly consist of excavation and ground works, the installation of cables, the supply and placement of cable ducts, pulling pits and concrete trenches, the placement of cabinets, and the supply, placement and removal of lighting pylons. The contract is divided into two lots: Lot 1 covers the provinces of East Flanders and West Flanders, while Lot 2 covers the provinces of Antwerp, Limburg and Flemish Brabant. The works are located in Belgium.

Description

Deze opdracht betreft: De onderhavige opdracht betreft een raamovereenkomst van werken voor Power Distribution en Substations en betreft voornamelijk: - graaf- en grondwerken, - de aanleg van kabels, - het leveren en plaatsen van kabelwegen, trekputten, betonsleuven,... - het plaatsen van kasten - het leveren, plaatsen en afbreken van verlichtingspylonen. De onderhavige opdracht betreft een raamovereenkomst van werken voor Power Distribution en Substations en betreft voornamelijk: - graaf- en grondwerken, - de aanleg van kabels, - het leveren en plaatsen van kabelwegen, trekputten, betonsleuven,... - het plaatsen van kasten - het leveren, plaatsen en afbreken van verlichtingspylonen; Deze opdracht betreft: De onderhavige opdracht betreft een raamovereenkomst van werken voor Power Distribution en Substations en betreft voornamelijk: - graaf- en grondwerken, - de aanleg van kabels, - het leveren en plaatsen van kabelwegen, trekputten, betonsleuven,... - het plaatsen van kasten - het leveren, plaatsen en afbreken van verlichtingspylonen,

Bid or no-bid?

Six questions before you commit a team. Under each one, what the register holds on it. The answers are yours.

  1. In your favour:

    Do we meet every eligibility criterion?

    Open procedure: any interested supplier may submit a bid.

    Above the EU threshold: open to companies from any EU country.

  2. Your call:

    Can we deliver this with the team we have?

    The register holds nothing on this. The official documents will.

  3. Your call:

    Do we have two comparable references?

    Comparable work is in Construction work.

  4. In your favour:

    Is the deadline realistic for a proper offer?

    13 days left, 10 of them working days.

  5. Your call:

    Is there a margin at the likely winning price?

    This buyer usually awards this kind of contract for between €3.6M and €11.4M.

  6. In your favour:

    Do we know this buyer?

    18 different companies won the last 19 comparable contracts.

Can I bid?

  • Open procedure: any interested supplier may submit a bid. Above the EU threshold: open to companies from any EU country.
  • The notice is written in Dutch.
  • Certificates from another EU country? Check the equivalents on eCertis

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Report an error in this notice

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 3 hours ago

What this buyer has paid before

Based on 11 comparable contracts this buyer awarded in this sector over the last 4 years.

Median award
€6.9M
Middle half of past awards
€3.6M to €11.4M

TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it has no mark on the scale. The official documents may state one.

Most recent awards

Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.

Infrabel nv

Belgium

notices in the register
308
awards
198
awarded in total
€273.9M

Who wins its contracts

Many suppliers
different companies won its awards
146
of the awards went to the three most frequent winners
6%
of its calls state an estimated value
0%

Based on 174 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
4.7
of those lots received a single tender
7%
of the awards went to companies based in another country
13%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.

Who usually wins this buyer's contracts in this sector

Company Wins Total awarded Last win
TM TDV 2 Oct 2025
Tijdelijke Maatschap "CK"; Cegelec Infra technics; Kontron AIS GmbH 1 €98.9M Jul 2025
Stadsbader NV 1 €53.1M Aug 2026
DUCHENE N.V.; VALENS N.V. 1 €12.2M Aug 2025
STRUKTON RAIL; EQUANS 1 €10.6M Jul 2026

Based on 19 awards with a linked company profile over the last 5 years.

45 open tenders right now

Market context

TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it cannot be placed among the open notices of its sector. The official documents may state one.

open now in Construction work
29,308
median open notice
€885,740

Who wins in this market

Many suppliers

Belgium · Construction work

different companies won awards here
430
of the awards went to the three most frequent winners
6%
buyers awarded contracts here
269

Based on 577 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
3.8
of those lots received a single tender
12%
of the awards went to companies based in another country
2%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Similar tenders

Open now

Awarded before

Never miss a tender like this

1,295 new notices in Construction work in Belgium in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

13 days left

Open notice

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language