Skip to content
Aperlena

Expansion of the Zirl water treatment plant, HB Eigenhofen - earthworks and civil engineering works

Original Ausbau der WVA Zirl, HB Eigenhofen - Erd- und Baumeisterarbeiten

Open Contract notice No deadline published
Watch this tender

We email you if the deadline moves or a correction is published. Free. Log in

Summary

Machine-generated summary

The municipality of Zirl intends to build a new drinking water reservoir with 2 x 150 m3 useful capacity in prefabricated PE plastic construction for the hamlets of Eigenhofen and Dirschbach. The reservoir site is planned above Eigenhofen in a forest. The tank construction itself is not the subject of this tender. The contract covers the earthworks needed for the elevated drinking water reservoir, construction of the access road to the reservoir, and the planned connection pipes near the reservoir. Scope includes clearing and felling up to 4,000 m2 of forest, around 600 m3 of excavation class 3-5, around 1,400 m3 of blasted rock excavation class 7, around 250 m3 of single-grain concrete, crushed rock backfill material, around 98 linear metres of pipe trenches in one and three lanes, an overflow and emptying shaft, and around 60 linear metres of access road with forecourt.

Description

Die Marktgemeinde Zirl beabsichtigt für die Weiler Eigenhofen und Dirschbach einen neuen Trinkwasserbehälter mit 2 x 150 m3 Nutzinhalt im PE-Kunststoff-Fertigteilbauweise zu errichten. Der Behälterstandort ist oberhalb von Eigenhofen im Wald vorgesehen. Der Behälterbau ist nicht Ausschreibungsgegenstand. Ausschreibungsgegenstand sind die erforderlichen Erdarbeiten für die Errichtung des Trinkwasserhochbehälters, die Errichtung des Zufahrtsweges zum Behälter sowie die Errichtung der geplanten Anschlussleitungen im Nahbereich des Hochbehälters. Bauumfang: • Bis zu 4000 m2 Fläche roden / fällen aller Art und Dimension • rd. 600 m3 Baugrubenaushub BKL. 3-5 • rd.1400 m3 Baugrubenaushub BKL 7, sprengen • rd. 250 m3 Einkornbeton liefern und als Bauwerksbettung einbauen • rd. 250 m3 Splitt 4/8 mm aus Felsabtrag brechen für die Behälterbettung • rd. 1500 m3 Felsabtrag auf 0/63 mm brechen für die Bauwerkshinterfüllung, Überschüttung, Dammschüttung, Grabenwiederverfüllung, Wegschotter • rd. 45 lfm Leitungsgraben 3-fach • rd. 53 lfm Leitungsgraben 1-fach • Anschluss Trinkwasserhochbehälter an die erdverlegten Leitungen • Überlauf- und Entleerungsschacht • rd. 60 lfm Zufahrtsweg zum Hochbehälter inkl. Vorplatz

Official source

Source: AUSSCHREIBUNG.AT (Hubexo Austria GmbH)

Always verify details on the official notice.

Last verified against AUSSCHREIBUNG.AT (Hubexo Austria GmbH) 1 day ago

The official portal may ask for a free registration before downloading.

More from this buyer

Full buyer profile

5 open tenders right now

This buyer has no award history in this sector yet. Usual winners, Construction work - Austria

Company Wins Total awarded Last win
PORR Bau GmbH 54 €285.9M Sep 2026
STRABAG AG 50 €257.2M Sep 2026
SWIETELSKY AG 38 €380.9M Sep 2026
Tischlerei Scheschy GmbH 20 €49.7M Sep 2026
Leyrer + Graf Baugesellschaft m.b.H. 15 €81.7M Sep 2026

Based on 1785 awards with a linked company profile over the last 2 years.

Similar tenders

Market context

Avg. open tender · Construction work
€31,469,117
25,567 open across Europe right now
Buyer track record on Aperlena
5 notices tracked · 0 awarded

Never miss a tender like this

191 new notices in Construction work in Austria in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
/
Jump to the search box
?
Show these shortcuts
Esc
Close