World Bank - Procurement Notices (Bank-financed projects)vérifié il y a 1 semaineAvis de marché
Rehabilitation du Corridor 24 Lot 1: Section 1.1: G133: G132 - Tartaul - Gotesti - R34, km 0+000 - km 14+930, et Section 1.2: G132: R35 - Baimaclia - Tarclia de Salcie - R32, km 14+220 - km 20+350 Lot 2: G131: R35 - Bobocica - G132, km 0+00 - km 22+110
OriginalRehabilitation of Corridor 24 Lot 1: Section 1.1: G133: G132 - Tartaul - Gotesti - R34, km 0+000 - km 14+930, and Section 1.2: G132: R35 - Baimaclia - Tarclia de Salcie - R32, km 14+220 - km 20+350 Lot 2: G131: R35 - Bobocica - G132, km 0+00 - km 22+110
Rehabilitation du Corridor 24 Lot 1: Section 1.1: G133: G132 - Tartaul - Gotesti - R34, km 0+000 - km 14+930, et Section 1.2: G132: R35 - Baimaclia - Tarclia de Salcie - R32, km 14+220 - km 20+350 Lot 2: G131: R35 - Bobocica - G132, km 0+00 - km 22+110
Acheteur: SE National Road Administration
Pays: Moldavie
Date limite: 14 juil. 2026, 10:00 (UTC+3)
Procédure: Procédure ouverte
Aperlena: https://aperlena.com/fr/t/rehabilitation-of-corridor-24-lot-1-section-11-g133-g132-tartaul-gotesti-r34-km-0000-km-14930-and-sectio-4abcdae592
Avis officiel: https://projects.worldbank.org/en/projects-operations/procurement-detail/OP00447803
Les offres sont closes. Une attribution ou un rectificatif sur cet avis : un e-mail quand le registre le voit.
Se connecter
01
Résumé
Résumé généré automatiquement
La J.S.C. 'National Road Administration' en Republique de Moldavie a invite des offres scellees pour des travaux de rehabilitation du Corridor 24 dans le cadre du projet Moldova Rural Connectivity Project finance par la Banque mondiale (reference MRCP/C24/W2/01-02). Le lot 1 couvre la route G133 de G132 a Tartaul, Goteti et R34, km 0+000 a km 14+920, et la route G132 de R35 a Baimaclia, Taraclia de Salcie et R32, km 14+220 a km 20+350. Le lot 2 couvre la route G131 de R35 a Bobocica et G132, km 0+000 a km 22+110. Les travaux comprennent terrassements, rehabilitation et elargissement de chaussee, ouvrages, drainage, equipements de securite, marquage et signalisation. Les soumissionnaires pouvaient soumissionner pour un lot ou les deux. La date limite etait le 14 juillet 2026 et est passee.
02
Description
Procédure
Request for Bids
Financement
World Bank
Référence
MRCP/C24/W2/01-02
Project: P180153 - Moldova Rural Connectivity Project
Reference: MRCP/C24/W2/01-02
Procurement method: Request for Bids
Financing: World Bank
Specific Procurement Notice
Request for Bids
Works
(Two-envelope Bidding Process Without Prequalification)
Employer: J.S.C.”National Road Administration” (S.A. ”Administraia Naional a Drumurilor”)
Project: Moldova Rural Connectivity Project
Contract title: Procurement of Rehabilitation Works on Corridor 24:
Lot 1: Contract MRCP/W2/01: Road G133: G132 - Tartaul - Goteti - R34, km 0+000 - km 14+920 (Section 1) and Road G132: R35 - Baimaclia - Taraclia de Salcie - R32, km 14+220 - km 20+350 (Section 2).
Lot 2: Contract MRCP/W2/02: Road G131: R35 - Bobocica - G132, km 0+000 - km 12+000 (Section 1) and Road G131: R35 - Bobocica - G132, km 12+000-km 22+110 (Section 2).
Country: Republic of Moldova
Loan No. 9672-MD/Credit No. 7538-MD
RFB No: MRCP/W2/01-02
Issued on: May 29th, 2026
The Republic of Moldova has received financing from the World Bank toward the cost of the Moldova Rural Connectivity Project and intends to apply part of the proceeds toward payments under the contracts for Procurement of Rehabilitation Works on Corridor 24 under
LOT 1 : Contract MRCP/W2/01: Road G133:
Section 1 : G132 - Tartaul - Goteti - R34, km 0+000 - km 14+920 and
Section 2: Road G132: R35 - Baimaclia - Taraclia de Salcie - R32, km 14+220 - km 20+350.
LOT 2 : Contract MRCP/W2/02: Road G131:
Section 1 : R35 - Bobocica - G132, km 0+000 - km 12+000 and
Section 2 : Road G131: R35 - Bobocica - G132, km 12+000-km 22+110.
Bidder can Bid for any one lot or for both the lots.
The J.S.C. ”National Road Administration” (NRA) now invites sealed Bids from eligible Bidders for the rehabilitation works under MRCP/W2/01-02, inclusive of all the necessary road improvement activities such as earthworks, road pavement rehabilitation/widening, repair works to structures, intersections, structures, drainage, incidental and safety facilities, road marking, signing and sidewalks, rearrangement of engineering services, etc.
The Scope of Works includes as provided below:
The rehabilitation of Corridor 24 comprises three regional roads “G”. The route passes the Cantemir district.
Lot 1
Section 1: Rehabilitation of G133 road - section km 0+000 - km 14+920. The project starts at the intersection with road G132 (km 14+220) - Tartaul village, and follows through road G133 up to km 14+920 - intersection with republican road R34 (km 100+078), village Goteti. The road passes villages Tartaul, Victorovca, Ciobalaccia and Flocoasa.
Section 2: Rehabilitation of G132, km 14+220 - km 20+350. The project starts at the intersection with road G133 (km 0+000) - Tartaul village, and continues up to km 20+350 - intersection with regional road G131 (km 22+110), village Baimaclia. The road passes villages Tartaul and Baimaclia.
Lot 2:
Section 1: Rehabilitation of regional road G131, km 0+000 - km 12+000,
and
Section 2: Rehabilitation of regional road G131, km 12+000 - km 22+110. The project starts at the intersection with republican road R35 (km 14+216), Viniovca village, and follows through road G131 up to km 22+110 - intersection with road G132 (km 20+350) - Baimaclia village. The road passes villages Viniovca, Bobocica, Enichioi and Baimaclia.
The main works for rehabilitation consist of the following quantities:
Lot 1: “Rehabilitation of Corridor 24: Section 1: G133 G132 - Tartaul - Gotesti - R34, km 0+000 - km 14+920, and Section 2: G132 R35 - Baimaclia - Taraclia de Salcie - R32, km 14+220 - km 20+350” Over 145.000 cub. m of earthworks;
Over 9.700 cub. m of asphalt concrete milling to any depth;
Over 126.000 square meters of foundation layer mixture of cement stabilized aggregates (cold recycling);
Over 37.000 tons of asphalt;
Over 12.000 square meters of Double bituminous treatment;
Four bridges rehabilitation;
Over 1.090 linear meters of culverts construction at different diameters;
Over 13.900 linear meters of paved waterways;
Over 1.800 linear meters of guardrail installation;
Over 540 pcs of signs installation;
Over 12.000 square meters of road marking application;
Over 17.800 square meters of sidewalk construction;
13 bus station installation, including ancillary works;
Utilities rearrangement as road illumination, communication cables, gas pipes, and underground water supply.
Lot 2: “Rehabilitation of Corridor 24: Section 1: G131 R35 - Bobocica - G132, km 0+000 - km 12+000, and Section 2: G131 R35 - Bobocica - G132, km 12+000 - km 22+110” Over 236.000 cub. m of earthworks;
Over 2.400 cub. m of asphalt concrete milling to any depth;
Over 21.000 square meters of foundation layer mixture of cement stabilized aggregates (cold recycling);
Over 42.600 tons of asphalt;
Over 26.900 square meters of Double bituminous treatment;
One bridge rehabilitation;
Over 1.000 linear meters of culverts construction at different diameters;
Over 25.100 linear meters of paved waterways;
Over 7.800 linear meters of guardrail installation;
Over 490 pc
Source officielle
Source : World Bank - Procurement Notices (Bank-financed projects)
Vérifiez toujours les détails dans l'avis officiel.