World Bank - Procurement Notices (Bank-financed projects)verificado hace 1 semanaAnuncio de licitación
Rehabilitacion del Corredor 24 Lote 1: Seccion 1.1: G133: G132 - Tartaul - Gotesti - R34, km 0+000 - km 14+930, y Seccion 1.2: G132: R35 - Baimaclia - Tarclia de Salcie - R32, km 14+220 - km 20+350 Lote 2: G131: R35 - Bobocica - G132, km 0+00 - km 22+110
OriginalRehabilitation of Corridor 24 Lot 1: Section 1.1: G133: G132 - Tartaul - Gotesti - R34, km 0+000 - km 14+930, and Section 1.2: G132: R35 - Baimaclia - Tarclia de Salcie - R32, km 14+220 - km 20+350 Lot 2: G131: R35 - Bobocica - G132, km 0+00 - km 22+110
Rehabilitacion del Corredor 24 Lote 1: Seccion 1.1: G133: G132 - Tartaul - Gotesti - R34, km 0+000 - km 14+930, y Seccion 1.2: G132: R35 - Baimaclia - Tarclia de Salcie - R32, km 14+220 - km 20+350 Lote 2: G131: R35 - Bobocica - G132, km 0+00 - km 22+110
Órgano de contratación: SE National Road Administration
País: Moldavia
Plazo: 14 jul. 2026, 10:00 (UTC+3)
Procedimiento: Procedimiento abierto
Aperlena: https://aperlena.com/es/t/rehabilitation-of-corridor-24-lot-1-section-11-g133-g132-tartaul-gotesti-r34-km-0000-km-14930-and-sectio-4abcdae592
Anuncio oficial: https://projects.worldbank.org/en/projects-operations/procurement-detail/OP00447803
El plazo de ofertas ha cerrado. Una adjudicación o una corrección de este anuncio: un email cuando el registro lo ve.
Iniciar sesión
01
Resumen
Resumen generado automáticamente
La J.S.C. 'National Road Administration' de la Republica de Moldova invito ofertas selladas para trabajos de rehabilitacion del Corredor 24 en el marco del Moldova Rural Connectivity Project, financiado por el Banco Mundial (referencia MRCP/C24/W2/01-02). El lote 1 abarca la via G133 de G132 por Tartaul y Goteti hasta R34, km 0+000 a km 14+920, y la via G132 de R35 por Baimaclia y Taraclia de Salcie hasta R32, km 14+220 a km 20+350. El lote 2 abarca la via G131 de R35 por Bobocica hasta G132, km 0+000 a km 22+110. Los trabajos incluyen movimientos de tierra, rehabilitacion y ensanche del pavimento, estructuras, drenaje, instalaciones de seguridad, senalizacion horizontal y vertical. Se podia ofertar por uno o ambos lotes. El plazo de presentacion fue el 14 de julio de 2026 y ha finalizado.
02
Descripción
Procedimiento
Request for Bids
Financiación
World Bank
Expediente
MRCP/C24/W2/01-02
Project: P180153 - Moldova Rural Connectivity Project
Reference: MRCP/C24/W2/01-02
Procurement method: Request for Bids
Financing: World Bank
Specific Procurement Notice
Request for Bids
Works
(Two-envelope Bidding Process Without Prequalification)
Employer: J.S.C.”National Road Administration” (S.A. ”Administraia Naional a Drumurilor”)
Project: Moldova Rural Connectivity Project
Contract title: Procurement of Rehabilitation Works on Corridor 24:
Lot 1: Contract MRCP/W2/01: Road G133: G132 - Tartaul - Goteti - R34, km 0+000 - km 14+920 (Section 1) and Road G132: R35 - Baimaclia - Taraclia de Salcie - R32, km 14+220 - km 20+350 (Section 2).
Lot 2: Contract MRCP/W2/02: Road G131: R35 - Bobocica - G132, km 0+000 - km 12+000 (Section 1) and Road G131: R35 - Bobocica - G132, km 12+000-km 22+110 (Section 2).
Country: Republic of Moldova
Loan No. 9672-MD/Credit No. 7538-MD
RFB No: MRCP/W2/01-02
Issued on: May 29th, 2026
The Republic of Moldova has received financing from the World Bank toward the cost of the Moldova Rural Connectivity Project and intends to apply part of the proceeds toward payments under the contracts for Procurement of Rehabilitation Works on Corridor 24 under
LOT 1 : Contract MRCP/W2/01: Road G133:
Section 1 : G132 - Tartaul - Goteti - R34, km 0+000 - km 14+920 and
Section 2: Road G132: R35 - Baimaclia - Taraclia de Salcie - R32, km 14+220 - km 20+350.
LOT 2 : Contract MRCP/W2/02: Road G131:
Section 1 : R35 - Bobocica - G132, km 0+000 - km 12+000 and
Section 2 : Road G131: R35 - Bobocica - G132, km 12+000-km 22+110.
Bidder can Bid for any one lot or for both the lots.
The J.S.C. ”National Road Administration” (NRA) now invites sealed Bids from eligible Bidders for the rehabilitation works under MRCP/W2/01-02, inclusive of all the necessary road improvement activities such as earthworks, road pavement rehabilitation/widening, repair works to structures, intersections, structures, drainage, incidental and safety facilities, road marking, signing and sidewalks, rearrangement of engineering services, etc.
The Scope of Works includes as provided below:
The rehabilitation of Corridor 24 comprises three regional roads “G”. The route passes the Cantemir district.
Lot 1
Section 1: Rehabilitation of G133 road - section km 0+000 - km 14+920. The project starts at the intersection with road G132 (km 14+220) - Tartaul village, and follows through road G133 up to km 14+920 - intersection with republican road R34 (km 100+078), village Goteti. The road passes villages Tartaul, Victorovca, Ciobalaccia and Flocoasa.
Section 2: Rehabilitation of G132, km 14+220 - km 20+350. The project starts at the intersection with road G133 (km 0+000) - Tartaul village, and continues up to km 20+350 - intersection with regional road G131 (km 22+110), village Baimaclia. The road passes villages Tartaul and Baimaclia.
Lot 2:
Section 1: Rehabilitation of regional road G131, km 0+000 - km 12+000,
and
Section 2: Rehabilitation of regional road G131, km 12+000 - km 22+110. The project starts at the intersection with republican road R35 (km 14+216), Viniovca village, and follows through road G131 up to km 22+110 - intersection with road G132 (km 20+350) - Baimaclia village. The road passes villages Viniovca, Bobocica, Enichioi and Baimaclia.
The main works for rehabilitation consist of the following quantities:
Lot 1: “Rehabilitation of Corridor 24: Section 1: G133 G132 - Tartaul - Gotesti - R34, km 0+000 - km 14+920, and Section 2: G132 R35 - Baimaclia - Taraclia de Salcie - R32, km 14+220 - km 20+350” Over 145.000 cub. m of earthworks;
Over 9.700 cub. m of asphalt concrete milling to any depth;
Over 126.000 square meters of foundation layer mixture of cement stabilized aggregates (cold recycling);
Over 37.000 tons of asphalt;
Over 12.000 square meters of Double bituminous treatment;
Four bridges rehabilitation;
Over 1.090 linear meters of culverts construction at different diameters;
Over 13.900 linear meters of paved waterways;
Over 1.800 linear meters of guardrail installation;
Over 540 pcs of signs installation;
Over 12.000 square meters of road marking application;
Over 17.800 square meters of sidewalk construction;
13 bus station installation, including ancillary works;
Utilities rearrangement as road illumination, communication cables, gas pipes, and underground water supply.
Lot 2: “Rehabilitation of Corridor 24: Section 1: G131 R35 - Bobocica - G132, km 0+000 - km 12+000, and Section 2: G131 R35 - Bobocica - G132, km 12+000 - km 22+110” Over 236.000 cub. m of earthworks;
Over 2.400 cub. m of asphalt concrete milling to any depth;
Over 21.000 square meters of foundation layer mixture of cement stabilized aggregates (cold recycling);
Over 42.600 tons of asphalt;
Over 26.900 square meters of Double bituminous treatment;
One bridge rehabilitation;
Over 1.000 linear meters of culverts construction at different diameters;
Over 25.100 linear meters of paved waterways;
Over 7.800 linear meters of guardrail installation;
Over 490 pc