Les offres sont closes. Une attribution ou un rectificatif sur cet avis : un e-mail quand le registre le voit.Se connecter
Germany - ROV services - Subsea Inspection
Acheteur: EnBW Energie Baden-Württemberg AG
Pays: Allemagne
Procédure: Procédure négociée
Secteur (CPV): Services auxiliaires de transport (63726620)
Aperlena: https://aperlena.com/fr/t/germany-rov-services-subsea-inspection-ac18d6cad4
Avis officiel: https://ted.europa.eu/en/notice/-/detail/289319-2026
Publié
Attribuéen attente
Description
Lot 1: Periodic Subsea Inspections - Offshore Wind Farms in the Baltic Sea Lot 1 covers the periodic subsea inspections for the Offshore Wind Farms Baltic 1 (B1) and Baltic 2 (B2). The scope includes visual and functional inspections of underwater support structures of the wind turbine generators (WTG) and offshore substations (OSS). All inspections shall be performed in accordance with the applicable standards of the Bundesamt für Seeschifffahrt und Hydrographie (BSH) and the respective wind farm-specific inspection plans. In B1, all 21 WTGs and the OSS shall be inspected every four years. The next scheduled campaign is planned for 2027. In B2, 20 WTGs shall be inspected annually (25% scope), with both jacket and monopile foundations to be covered. The OSS in B2 is subject to a four-year inspection cycle. The inspections may involve either full visual and functional checks or reduced general visual inspections (GVI). Bidders shall submit fixed lump sum prices for both options. The contractor shall conduct the inspections between April and September. The full organization of the offshore campaign is the contractor’s responsibility, including selection and provision of a suitable DP2 vessel, logistics planning, crew transfers, and inspection equipment such as remotely operated vehicles (ROV). All personnel must hold valid offshore wind certifications and have documented experience in subsea inspections. A logistics concept must be submitted as part of the bid and shall include information on the base port, operational weather limits, contingency planning, and crew transfer processes. Inspection activities must be thoroughly documented. This includes daily reports outlining completed work, deviations, weather conditions, and safety-related events, as well as technical inspection reports. All photo and video recordings must be time- and location-stamped. Final documentation must be submitted no later than six weeks after completion of the offshore works. In addition to the base scope, bidders shall provide daily rates for optional services such as re-inspections, spot checks, or minor recovery works using ROVs. Lot 2: Periodic Subsea Inspections - Offshore Wind Farms in the North Sea Lot 2 covers the periodic subsea inspections for the offshore wind farms Hohe See (HS), Albatros (ALB), and He Dreiht (HD). The scope includes visual and functional inspections of underwater support structures of WTGs and OSSs. All inspections shall be performed in accordance with the applicable standards of the BSH and the respective wind farm-specific inspection plans. In HS and ALB, 21 to 22 WTGs shall be inspected annually (25% scope). The OSS in each wind farm is subject to a four-year inspection cycle. In HD, which is currently under construction, 16 WTGs shall be inspected annually (25% scope). The inspection scope is based on applicable standards and is expected to be updated as the project progresses. The inspections may involve either full visual and functional checks or reduced GVI. Bidders shall submit fixed lump sum prices for both options. The contractor shall conduct the inspections between April and September. The full organization of the offshore campaign is the contractor’s responsibility, including selection and provision of a suitable DP2 vessel, logistics planning, crew transfers, and inspection equipment such as ROVs. All personnel must hold valid offshore wind certifications and have documented experience in subsea inspections. A logistics concept must be submitted as part of the bid and shall include information on the base port, operational weather limits, contingency planning, and crew transfer processes. Inspection activities must be thoroughly documented. This includes daily reports outlining completed work, deviations, weather conditions, and safety-related events, as well as technical inspection reports. All photo and video recordings must be time- and location-stamped. Final documentation must be submitted no later than six weeks after completion of the offshore works. In addition to the base scope, bidders shall provide daily rates for optional services such as re-inspections, spot checks, or minor recovery works using ROVs.
Lot 1: Periodic Subsea Inspections - Offshore Wind Farms in the Baltic Sea Lot 1 covers the periodic subsea inspections for the Offshore Wind Farms Baltic 1 (B1) and Baltic 2 (B2). The scope includes visual and functional inspections of underwater support structures of the wind turbine generators (WTG) and offshore substations (OSS). All inspections shall be performed in accordance with the applicable standards of the Bundesamt für Seeschifffahrt und Hydrographie (BSH) and the respective wind farm-specific inspection plans. In B1, all 21 WTGs and the OSS shall be inspected every four years. The next scheduled campaign is planned for 2027. In B2, 20 WTGs shall be inspected annually (25% scope), with both jacket and monopile foundations to be covered. The OSS in B2 is subject to a four-year inspection cycle. The inspections may involve either full visual and functional checks or reduced general visual inspections (GVI). Bidders shall submit fixed lump sum prices for both options. The contractor shall conduct the inspections between April and September. The full organization of the offshore campaign is the contractor’s responsibility, including selection and provision of a suitable DP2 vessel, logistics planning, crew transfers, and inspection equipment such as remotely operated vehicles (ROV). All personnel must hold valid offshore wind certifications and have documented experience in subsea inspections. A logistics concept must be submitted as part of the bid and shall include information on the base port, operational weather limits, contingency planning, and crew transfer processes. Inspection activities must be thoroughly documented. This includes daily reports outlining completed work, deviations, weather conditions, and safety-related events, as well as technical inspection reports. All photo and video recordings must be time- and location-stamped. Final documentation must be submitted no later than six weeks after completion of the offshore works. In addition to the base scope, bidders shall provide daily rates for optional services such as re-inspections, spot checks, or minor recovery works using ROVs.; Lot 2: Periodic Subsea Inspections - Offshore Wind Farms in the North Sea Lot 2 covers the periodic subsea inspections for the offshore wind farms Hohe See (HS), Albatros (ALB), and He Dreiht (HD). The scope includes visual and functional inspections of underwater support structures of WTGs and OSSs. All inspections shall be performed in accordance with the applicable standards of the BSH and the respective wind farm-specific inspection plans. In HS and ALB, 21 to 22 WTGs shall be inspected annually (25% scope). The OSS in each wind farm is subject to a four-year inspection cycle. In HD, which is currently under construction, 16 WTGs shall be inspected annually (25% scope). The inspection scope is based on applicable standards and is expected to be updated as the project progresses. The inspections may involve either full visual and functional checks or reduced GVI. Bidders shall submit fixed lump sum prices for both options. The contractor shall conduct the inspections between April and September. The full organization of the offshore campaign is the contractor’s responsibility, including selection and provision of a suitable DP2 vessel, logistics planning, crew transfers, and inspection equipment such as ROVs. All personnel must hold valid offshore wind certifications and have documented experience in subsea inspections. A logistics concept must be submitted as part of the bid and shall include information on the base port, operational weather limits, contingency planning, and crew transfer processes. Inspection activities must be thoroughly documented. This includes daily reports outlining completed work, deviations, weather conditions, and safety-related events, as well as technical inspection reports. All photo and video recordings must be time- and location-stamped. Final documentation must be submitted no later than six weeks after completion of the offshore works. In addition to the base scope, bidders shall provide daily rates for optional services such as re-inspections, spot checks, or minor recovery works using ROVs.
Source officielle
Source : TED - Tenders Electronic Daily (Publications Office of the EU)
Vérifiez toujours les détails dans l'avis officiel.
Dernière vérification auprès de TED - Tenders Electronic Daily (Publications Office of the EU) il y a 1 mois
Chaque republication de cet avis par une source officielle avec un contenu différent. Nous surveillons toutes les sources que nous indexons, y compris les copies régionales du même avis.
Allemagne
Services auxiliaires de transportIGA 2027 Ruhrgebiet gGmbH
Déjà consulté
Contexte de marché
Appel ouvert moyen · Services auxiliaires de transport
16 977 298 €
718 ouverts en Europe actuellement
Historique de l'acheteur sur Aperlena
99 avis suivis · 54 attribués
Ne manquez plus aucun marché comme celui-ci
7 nouveaux avis pour Services auxiliaires de transport en Allemagne au cours des 7 derniers jours.
Recevez un e-mail quand de nouveaux avis paraissent. Gratuit.