Aller au contenu
Aperlena

Contracts Finder (UK Cabinet Office) vérifié il y a 1 mois Avis de marché

DNWP0073 - Lot 1B/In-SEP ID - Opérations initiales de démantèlement en zone contrôlée

Original DNWP0073 - Lot 1B/In-SEP ID - Controlled Area Initial Decommissioning Operations

Clôturé Royaume-Uni Travaux de construction

Acheteur public Altrad AtkinsRealis Joint Venture (A2R JV)

23,4 M € valeur estimée · 23 360 938 € · converti depuis GBP

Informations clés

Clôturé
12:00 (UTC+1)
Consulter l'avis officiel Suivre ce marché

Les offres sont closes. Une attribution ou un rectificatif sur cet avis : un e-mail quand le registre le voit. Se connecter

Résumé

Résumé généré automatiquement

Le groupement Altrad AtkinsRealis (A2R JV) a acquis un soutien aux opérations de démantèlement à l'intérieur de la zone contrôlée (In-SEP) au titre de l'avis DNWP0073, lot 1B. Le contractant recherchait jusqu'à 30 équivalents temps plein, la répartition entre personnel ouvrier et encadrement étant déterminée par le sous-traitant. Les travaux comprenaient l'enlèvement des déchets, leur conditionnement, leur expédition et leur réduction en taille, ainsi que le déposement d'installations devenues superflues dans des bâtiments In-SEP existants et futurs. Un contrat actif courait jusqu'au 31 mars 2027 pour démontrer le concept, suivi de travaux à plus long terme estimés à 24 mois. Les tâches relevaient de la définition de la construction selon CDM 2015. La valeur estimée était de 20 000 000 GBP, soit environ 23 360 938 EUR, convertis de GBP. La remise des offres a été clôturée le 2026-09-17.

Calendrier

20 jours entre la publication et la date limite.

  1. Publié
  2. Date limite
  3. Attribué en attente

Description

The anticipated scope for DNWP0073 is indicatively only. The Contractor requires support to the Inside Controlled Area (In-SEP) Decommissioning Operations. This will take the form of the provision of resource, up to 30 Full Time Equivalent (FTE), with an appropriate ratio of blue:white collar resources to be determined by the Subcontractor to best meet the Initial Decommissioning (ID) activities required by the Contractor. A current contract is in place until 31st March 2027 to prove the concept and develop an initial operating capability. This EOI relates to the longer-term works anticipated to commence thereafter, with an estimated duration of 24 months. The tasks undertaken will be broad and varied, and will be located in existing In-SEP and any future In-SEP buildings. Broadly, the Subcontractor will be required to provide Operational Support to the ID capability, build upon the previously developed ID capability, drive future improvements and assist in building scope of ID workload. Specific work and details will be decided by the ID In-SEP, Delivery Board and locally on plant at Plant Operations Control Centres (POCCs). Initial works will include waste removal, waste packaging and despatch and size reduction. Deplanting, involving the removal, lifting, size reduction and transport of redundant plant will also be required. Works will grow and develop in complexity as the capability matures, subject to providing ongoing Value for Money. (VFM) Tasks which meet the definition of 'Construction' (CDM 2015 Part 1 Regulation 2) should now be anticipated and appropriate management and supervision arrangements incorporated. This Contract Opporutnity represents a long-term commitment by the Contractor to further develop the Suitably Qualified and Experienced Person (SQEP) workforce of the Subcontractor to undertake works in uniquely hazardous facilities requiring prior knowledge and experience. The Subcontractor will be responsible for the design of all temporary works, this is anticipated to primarily be access/scaffolding but may also include design of lifting plans. The Subcontractor will ensure a safe sequence is adhered to for all activities. This may require the use of Contractor's structural/mechanical engineer on an ad-hoc basis. The Subcontractor shall integrate and co-ordinate its design with the following design of the Contractor and Others. The Subcontractor shall submit all temporary works plans to the Project Manager for acceptance prior to erection. The Subcontractor will be responsible for ensuring an appropriate level of checking and approval for their designs. The review period for the Project Manager to review the Review Documents is up to 2 weeks (10 working days). No temporary works will be erected until the Review Documentation has been authorised by the Project Manager. Important: Delivery is within a live operational environment, and scope is subject to change. Additional information: https://www.linkedin.com/company/a2r-altrad-atkinsrealis-remediation https://www.gov.uk/government/news/sellafield-ltd-awards-high-hazard-risk-reduction-framework-contract

Source officielle

Source : Contracts Finder (UK Cabinet Office)

Vérifiez toujours les détails dans l'avis officiel.

Dernière vérification auprès de Contracts Finder (UK Cabinet Office) il y a 1 mois

Documents sur Contracts Finder (UK Cabinet Office) (anglais)

Marché

Travaux de construction, Royaume-Uni

avis ouvert médian
523 797 €
Plus de chiffres

Contexte de marché

ouverts en ce moment, Travaux de construction
20 095
avis ouvert médian
523 797 €

Qui remporte les marchés ici

Nombreux fournisseurs

Royaume-Uni · Travaux de construction

entreprises différentes ont remporté des attributions ici
870
des attributions sont allées aux trois titulaires les plus fréquents
6%
acheteurs ont attribué des marchés ici
403

D'après 1 576 attributions avec un titulaire nommé sur les 3 dernières années. Compté par attribution et non par montant, car les montants des lots et des accords-cadres ne sont pas comparables. Concentré : les trois titulaires les plus fréquents ont obtenu 65% des attributions ou plus ; nombreux fournisseurs : moins de 35% avec au moins dix titulaires différents.

L'acheteur en chiffres

Altrad AtkinsRealis Joint Venture (A2R JV)

Altrad AtkinsRealis Joint Venture (A2R JV)

Royaume-Uni

Marchés similaires

Ouverts en ce moment

13

jours restants

Rénovation de The Core

Newcastle City Council

13 jours, Royaume-Uni Travaux de construction

8 246 937 € valeur est.

Déjà attribués

Ne manquez plus aucun marché comme celui-ci

179 nouveaux avis pour Travaux de construction en Royaume-Uni au cours des 7 derniers jours. Recevez un e-mail quand de nouveaux avis paraissent. Gratuit.

Créer mon alerte

Ou suivez seulement son code CPV, Travaux de construction d'un réacteur nucléaire : un e-mail quand de nouveaux marchés arrivent sous ce code, sans compte.

Raccourcis clavier

Parcourir une liste sans toucher la souris. Les raccourcis restent inactifs pendant la saisie dans un champ.

j
Résultat suivant
k
Résultat précédent
Entrée
Ouvrir le résultat
n
Page suivante
p
Page précédente
c
Comparer ce résultat
s
Ajouter ce résultat à la présélection
o
Ouvrir le résultat dans un nouvel onglet
x
Écarter ce résultat
/
Rechercher depuis n’importe quelle page
Ctrl K
Rechercher depuis n’importe quelle page
?
Afficher ces raccourcis
Échap
Fermer

Sommaire

Fermer
Se connecter

Langue