Aller au contenu
Aperlena

DNWP0073 - Lot 1B/In-SEP ID - Operations initiales de demantelement en zone controlee

Original DNWP0073 - Lot 1B/In-SEP ID - Controlled Area Initial Decommissioning Operations

Ouvert Avis de marché 13 jours restants
Suivre ce marché

Nous vous écrivons si la date limite change ou si un rectificatif est publié. Gratuit. Se connecter

  1. Publié
  2. Aujourd'hui
  3. Date limite ouvert 21 jours
  4. Attribué en attente

Résumé

Résumé généré automatiquement

L'acheteur recherche un sous-traitant pour appuyer les operations initiales de demantelement en zone controlee (In-SEP), avec jusqu'a 30 equivalents temps plein, dans une repartition appropriee entre personnel d'execution et encadrement. Les travaux comprennent l'enlevement des dechets, leur conditionnement, leur expedition, la reduction de taille et le deplantement des installations hors service. Un contrat actuel court jusqu'au 31 mars 2027 ; cet avis concerne les travaux a plus long terme qui suivront, pour une duree estimee de 24 mois. Les taches deviendront plus complexes et incluront des activites de construction au sens du CDM 2015. L'acheteur est un contractant nucleaire britannique sur un site exceptionnellement dangereux. Valeur estimee, date limite et procedure de soumission ne sont pas indiquees.

Description

The anticipated scope for DNWP0073 is indicatively only. The Contractor requires support to the Inside Controlled Area (In-SEP) Decommissioning Operations. This will take the form of the provision of resource, up to 30 Full Time Equivalent (FTE), with an appropriate ratio of blue:white collar resources to be determined by the Subcontractor to best meet the Initial Decommissioning (ID) activities required by the Contractor. A current contract is in place until 31st March 2027 to prove the concept and develop an initial operating capability. This EOI relates to the longer-term works anticipated to commence thereafter, with an estimated duration of 24 months. The tasks undertaken will be broad and varied, and will be located in existing In-SEP and any future In-SEP buildings. Broadly, the Subcontractor will be required to provide Operational Support to the ID capability, build upon the previously developed ID capability, drive future improvements and assist in building scope of ID workload. Specific work and details will be decided by the ID In-SEP, Delivery Board and locally on plant at Plant Operations Control Centres (POCCs). Initial works will include waste removal, waste packaging and despatch and size reduction. Deplanting, involving the removal, lifting, size reduction and transport of redundant plant will also be required. Works will grow and develop in complexity as the capability matures, subject to providing ongoing Value for Money. (VFM) Tasks which meet the definition of 'Construction' (CDM 2015 Part 1 Regulation 2) should now be anticipated and appropriate management and supervision arrangements incorporated. This Contract Opporutnity represents a long-term commitment by the Contractor to further develop the Suitably Qualified and Experienced Person (SQEP) workforce of the Subcontractor to undertake works in uniquely hazardous facilities requiring prior knowledge and experience. The Subcontractor will be responsible for the design of all temporary works, this is anticipated to primarily be access/scaffolding but may also include design of lifting plans. The Subcontractor will ensure a safe sequence is adhered to for all activities. This may require the use of Contractor's structural/mechanical engineer on an ad-hoc basis. The Subcontractor shall integrate and co-ordinate its design with the following design of the Contractor and Others. The Subcontractor shall submit all temporary works plans to the Project Manager for acceptance prior to erection. The Subcontractor will be responsible for ensuring an appropriate level of checking and approval for their designs. The review period for the Project Manager to review the Review Documents is up to 2 weeks (10 working days). No temporary works will be erected until the Review Documentation has been authorised by the Project Manager. Important: Delivery is within a live operational environment, and scope is subject to change. Additional information: https://www.linkedin.com/company/a2r-altrad-atkinsrealis-remediation https://www.gov.uk/government/news/sellafield-ltd-awards-high-hazard-risk-reduction-framework-contract

Source officielle

Source : Contracts Finder (UK Cabinet Office)

Vérifiez toujours les détails dans l'avis officiel.

Dernière vérification auprès de Contracts Finder (UK Cabinet Office) il y a 1 semaine

Documents sur Contracts Finder (UK Cabinet Office) (anglais)

Marchés similaires

Contexte de marché

Appel ouvert moyen · Travaux de construction
30 492 874 €
29 978 ouverts en Europe actuellement 23% en dessous de la moyenne du secteur
Historique de l'acheteur sur Aperlena
1 avis suivis · 0 attribués

Ne manquez plus aucun marché comme celui-ci

Recevez un e-mail pour les nouveaux marchés : Travaux de construction · Royaume-Uni. Gratuit.

Créer mon alerte

13 jours restants

Source