DNWP0073 - Lote 1B/In-SEP ID - Operaciones iniciales de desmantelamiento en zona controlada
Órgano de contratación: Altrad AtkinsRealis Joint Venture (A2R JV)
País: Reino Unido
Plazo: 17 sep. 2026, 12:00 (UTC+1)
Valor estimado: 23.360.938 €
Procedimiento: Otro procedimiento
Sector (CPV): Trabajos de construcción (45251111)
Aperlena: https://aperlena.com/es/t/dnwp0073-lot-1bin-sep-id-controlled-area-initial-decommissioning-operations-c2a8d9528d
Anuncio oficial: https://www.contractsfinder.service.gov.uk/Notice/8a4922ab-f26c-4229-acf5-47feda729b9d
El plazo de ofertas ha cerrado. Una adjudicación o una corrección de este anuncio: un email cuando el registro lo ve.
Iniciar sesión
01
Resumen
Resumen generado automáticamente
La unión temporal Altrad AtkinsRealis (A2R JV) contrató apoyo para las operaciones de desmantelamiento dentro del área controlada (In-SEP) bajo el anuncio DNWP0073, lote 1B. Se solicitaba personal de hasta 30 equivalentes a jornada completa, cuya proporción entre personal operativo y directivo determinaría el subcontratista. Los trabajos incluían retirada de residuos, envasado, expedición y reducción de tamaño, así como el desmontaje, izado, fragmentación y transporte de instalaciones obsoletas en edificios In-SEP existentes y futuros. Un contrato vigente, que finalizaba el 31 de marzo de 2027, demostraba el concepto, seguido de trabajos a más largo plazo con una duración estimada de 24 meses. Las tareas se consideraban construcción según CDM 2015. El valor estimado fue de GBP 20.000.000, unos EUR 23.360.938, convertidos de GBP. El plazo de licitación cerró el 2026-09-17.
02
Descripción
The anticipated scope for DNWP0073 is indicatively only. The Contractor requires support to the Inside Controlled Area (In-SEP) Decommissioning Operations. This will take the form of the provision of resource, up to 30 Full Time Equivalent (FTE), with an appropriate ratio of blue:white collar resources to be determined by the Subcontractor to best meet the Initial Decommissioning (ID) activities required by the Contractor.
A current contract is in place until 31st March 2027 to prove the concept and develop an initial operating capability. This EOI relates to the longer-term works anticipated to commence thereafter, with an estimated duration of 24 months.
The tasks undertaken will be broad and varied, and will be located in existing In-SEP and any future In-SEP buildings. Broadly, the Subcontractor will be required to provide Operational Support to the ID capability, build upon the previously developed ID capability, drive future improvements and assist in building scope of ID workload. Specific work and details will be decided by the ID In-SEP, Delivery Board and locally on plant at Plant Operations Control Centres (POCCs).
Initial works will include waste removal, waste packaging and despatch and size reduction. Deplanting, involving the removal, lifting, size reduction and transport of redundant plant will also be required. Works will grow and develop in complexity as the capability matures, subject to providing ongoing Value for Money. (VFM)
Tasks which meet the definition of 'Construction' (CDM 2015 Part 1 Regulation 2) should now be anticipated and appropriate management and supervision arrangements incorporated. This Contract Opporutnity represents a long-term commitment by the Contractor to further develop the Suitably Qualified and Experienced Person (SQEP) workforce of the Subcontractor to undertake works in uniquely hazardous facilities requiring prior knowledge and experience.
The Subcontractor will be responsible for the design of all temporary works, this is anticipated to primarily be access/scaffolding but may also include design of lifting plans. The Subcontractor will ensure a safe sequence is adhered to for all activities. This may require the use of Contractor's structural/mechanical engineer on an ad-hoc basis.
The Subcontractor shall integrate and co-ordinate its design with the following design of the Contractor and Others. The Subcontractor shall submit all temporary works plans to the Project Manager for acceptance prior to erection. The Subcontractor will be responsible for ensuring an appropriate level of checking and approval for their designs.
The review period for the Project Manager to review the Review Documents is up to 2 weeks (10 working days). No temporary works will be erected until the Review Documentation has been authorised by the Project Manager.
Important: Delivery is within a live operational environment, and scope is subject to change.
Additional information: https://www.linkedin.com/company/a2r-altrad-atkinsrealis-remediation
https://www.gov.uk/government/news/sellafield-ltd-awards-high-hazard-risk-reduction-framework-contract
Fuente oficial
Fuente: Contracts Finder (UK Cabinet Office)
Verifica siempre los detalles en el anuncio oficial.
de las adjudicaciones fueron a los tres adjudicatarios más frecuentes
6%
compradores adjudicaron contratos aquí
394
Según 1.533 adjudicaciones con adjudicatario identificado en los últimos 3 años. Contadas por adjudicación y no por importe, porque los importes de lotes y acuerdos marco no son comparables.
Concentrado: los tres adjudicatarios más frecuentes obtuvieron el 65% de las adjudicaciones o más; muchos proveedores: menos del 35% con al menos diez adjudicatarios distintos.