Summary
Machine-generated summaryDransEnergie SA awarded civil engineering works for the RENOFGB project at the FGB plant. The project replaces the existing 40 MVA production unit with two new 22 MVA units handling the same flow as the old unit. The new units will receive water from the Dranse d'Entremont accumulated in the Toules dam via the existing headrace gallery and penstock. The planned turbines are horizontal-axis triple-jet Pelton types. The contract covers the civil engineering transformations in the FGB plant linked to replacing the existing unit with the two new units NG1 and NG2. The contract was awarded to FR_PraderLosinger SA for EUR 1,149,712.89.
Description
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Report an error in this notice
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 3 weeks ago
Similar tenders
Market context
- Avg. open tender · Construction work
- €32,600,825
- Buyer track record on Aperlena
- 3 notices tracked · 2 awarded
- €1,149,713 in awarded contracts
Never miss a tender like this
391 new notices in Construction work in Switzerland in the last 7 days. Get an email when new ones appear. Free.
Set up my alert