Skip to content
Aperlena

Stubbington Study Centre, Repairs to Water Main and Supply Room 27

Awarded Contract award No deadline published
Watch this tender

Bidding is closed. An award or a correction on this notice: an email when the register sees it. Log in

  1. Published
  2. Awarded pending

Description

Install a new water supply from the boiler room (Room 34, Building 004A) to reconnect the kitchen sink in Room 27. The proposed route is to exit the building near the boiler ventilation opening and run the pipework externally, either beneath or alongside the building on the existing raised brick piers, before connecting to the currently disconnected sink. If an external route is adopted, the pipework should be insulated and adequately protected from direct sunlight to minimise the risk of water warming and to maintain the integrity of the water supply.

Official source

Source: Find a Tender Service (UK Cabinet Office / Crown Commercial Service)

Always verify details on the official notice.

Last verified against Find a Tender Service (UK Cabinet Office / Crown Commercial Service) 1 month ago

Documents on Find a Tender Service (UK Cabinet Office / Crown Commercial Service) (English)

More from this buyer

Full buyer profile

3 open tenders right now

Recent awards

Similar tenders

Market context

Buyer track record on Aperlena
186 notices tracked · 175 awarded
€133,165,517 in awarded contracts

Never miss a tender like this

6,857 new notices in all sectors in United Kingdom in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
/
Jump to the search box
?
Show these shortcuts
Esc
Close