Summary
Machine-generated summaryThe town of Zerbst/Anhalt is procuring construction works to build a bridge over the Nuthe river at the Puschkinpromenade in Zerbst/Anhalt. The works cover a foot and cycle path bridge as a single-span steel and timber structure, approximately 7.67 m long with a usable width of about 3.04 m, designed for a pedestrian and bicycle traffic load of 5.0 kN/m2. The load-bearing structure consists of steel main girders with cross beams, the deck is made of larch timber planks, wooden railings are planned on both sides, and the bridge rests on four well-ring foundations. The contract is not divided into lots. Work is to begin on 23.11.2026 and be completed by 31.05.2027. Variant tenders are not permitted, several main offers are allowed.
Description
Official source
Source: Datenservice Öffentlicher Einkauf (Bekanntmachungsservice)
Always verify details on the official notice.
Last verified against Datenservice Öffentlicher Einkauf (Bekanntmachungsservice) 1 hour ago
More from this buyer
Full buyer profile5 open tenders right now
- Architectural services - Planning services for the renovation of the Marstall building in Zerbst/Anhalt 2 days left
- Conversion of the floodlight system to LED No deadline published
- Road construction No deadline published
Similar tenders
Market context
- Buyer track record on Aperlena
- 37 notices tracked · 1 awarded
Never miss a tender like this
4,444 new notices in all sectors in Germany in the last 7 days. Get an email when new ones appear. Free.
Set up my alert