Summary
Machine-generated summaryThe works comprise thermal insulation and weather protection of the digester top and gas dome of the old digester tower (1,260 m3, built 1969) and of the new digester tower (3,100 m3, built 1978), as well as insulation of the external walkway area between the old and the new digester tower. The works take place at the wastewater treatment plant of the RHV Ried association. The execution period is calendar weeks 31 to 32, meaning the works must be carried out within a short two-week window during summer.
Description
Official source
Source: AUSSCHREIBUNG.AT (Hubexo Austria GmbH)
Always verify details on the official notice.
Last verified against AUSSCHREIBUNG.AT (Hubexo Austria GmbH) 4 days ago
The official portal may ask for a free registration before downloading.
More from this buyer
Full buyer profile8 open tenders right now
- Renovation of the old digester tower, BL08, renovation and adaptation of railings (old and new digester towers, pre-thickener) No deadline published
- Renovation of the old digestion tower, BL06, digestion tower renovation (interior coating, exterior concrete) No deadline published
- Refurbishment of the old digester, BL05, condition survey of the existing digester No deadline published
This buyer has no award history in this sector yet. Usual winners, Construction work - Austria
| Company | Wins | Total awarded | Last win |
|---|---|---|---|
| PORR Bau GmbH | 55 | €286.0M | Sep 2026 |
| STRABAG AG | 50 | €257.2M | Sep 2026 |
| SWIETELSKY AG | 39 | €381.5M | Sep 2026 |
| Tischlerei Scheschy GmbH | 21 | €51.2M | Sep 2026 |
| Leyrer + Graf Baugesellschaft m.b.H. | 15 | €81.7M | Sep 2026 |
Based on 1818 awards with a linked company profile over the last 2 years.
Similar tenders
Market context
- Avg. open tender · Construction work
- €31,452,878
- Buyer track record on Aperlena
- 8 notices tracked · 0 awarded
Never miss a tender like this
166 new notices in Construction work in Austria in the last 7 days. Get an email when new ones appear. Free.
Set up my alert