Skip to content
Aperlena

Romania - Construction works for school buildings - Construction of an education unit - primary and lower secondary school

Original România - Lucrări de construcţii de instituţii şcolare - CONSTRUIRE UNITATE DE INVATAMANT - SCOALA PRIMARA SI GIMNAZIALA, CONFORM P.U.Z. APROBAT PRIN H.C.L. NR. 76/29.08.2024

Open Contract notice 35 days left
Watch this tender

Deadline 30 Oct. If it moves, an email when the register sees it. A correction: the same email. Your plan: decide by 16 Oct, questions by 16 Oct, draft by 23 Oct. Log in

  1. Published
  2. Today
  3. Deadline open for 37 days
  4. Awarded pending

Summary

Machine-generated summary

The contracting authority in Dumbravita commune, Timis county, Romania, is procuring the construction of a primary and lower secondary school, as approved by local council decision H.C.L. no. 76 of 29.08.2024. The investment aims to ensure non-discriminatory access to quality education for rural school populations, addressing overcrowding and demographic growth. Works and equipment include site utilities (460,000 lei), construction and installations (32,257,911.67 lei), technological and functional equipment with installation (3,052,093.90 lei) and site organisation construction works (335,081.42 lei), for a total estimated value of 36,105,086.99 lei. Clarification requests must be submitted at least 20 days before the offer submission deadline.

Description

Investiția propusă constă în construirea unei unități de învățământ pentru ciclurile primar și gimnazial în comuna Dumbrăvița, județul Timiș, în vederea asigurării accesului nediscriminatoriu la educație de calitate pentru populația școlară din mediul rural. Proiectul urmărește realizarea unei infrastructuri educaționale conforme cerințelor actuale privind siguranța, funcționalitatea, accesibilitatea și dotarea cu echipamente moderne, dimensionată în raport cu evoluția demografică și gradul ridicat de supraaglomerare a unităților existente. Valoarea estimata a procedurii este de 36.105.086,99 lei si se compune din: - cap. 2.1.1 din DG - Cheltuieli pentru asigurarea utilitatilor - 460.000,00 lei - cap. 4.1 din DG - Constructii si instalatii - 32.257.911,67 lei - cap. 4.3 din DG - Utilaje, echipamente tehnologice si functionale cu montaj - 3.052.093,90 lei - cap. 5.1.1 din DG - Lucrari de constructii si instalatii aferente organizarii de santier - 335.081,42 lei A. In conformitate cu prevederile art. 160 alin. (1) din Legea nr. 98/2016, termenul limita pana la care orice operator economic interesat are dreptul de a solicita clarificari sau informatii suplimentare in legatura cu documentatia de atribuire este de maxim 20 zile inainte de data limita de depunere a ofertelor. B. In conformitate cu prevederile art. 160 alin. (2) din Legea nr. 98/2016 autoritatea contractanta va raspunde in mod clar si complet tuturor solicitarilor de clarficare/informatiilor suplimentare in a 12 -a zi dinainte de termenul limita stabilit pentru depunerea ofertelor. Orice solicitare de clarificare transmisa dupa data mentionata la punctul A, va pune autoritatea contractanta in imposibilitatea de a oferi un raspuns in termenul mentionat la punctul B. si drept urmare, orice solicitare de clarificare in afara termenelor mentionate se va considera TARDIVA. „CONSTRUIRE UNITATE DE INVATAMANT - SCOALA PRIMARA SI GIMNAZIALA, CONFORM PUZ APROBAT PRIN H.C.L. NR. 76/29.08.2024” Lucrarile se vor executa în conformitate cu indicatorii și cantitățile prevazuti/ prevazute pe site-ul www.elicitatie. ro. Durata maxima de executie: 24 luni.

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 3 hours ago

More from this buyer

Full buyer profile

Who usually wins this buyer's contracts in this sector

Company Wins Total awarded Last win
NEW RPC 321 1 €857,887 Aug 2026
MM WEST 1 €333,739 Aug 2026

Based on 2 awards with a linked company profile over the last 5 years.

Similar tenders

Market context

Avg. open tender · Construction work
€31,996,122
25,597 open across Europe right now 79% below sector average
Buyer track record on Aperlena
9 notices tracked · 4 awarded
€1,445,871 in awarded contracts

Never miss a tender like this

387 new notices in Construction work in Romania in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
/
Jump to the search box
?
Show these shortcuts
Esc
Close