Description

Project: P176114 - Improving Power System Resilience for European Power Grid Integration Reference: UHE-IPSR-ТЕО Procurement method: Consultant Qualification Selection Financing: World Bank UPDATED!!! REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES - FIRMS SELECTION) Country : Ukraine Name of the Project : “Ukraine - Improving Power System Resilience for European Power Grid Integration (Installation of Hybrid Systems for Electricity Production in PJSC “Ukrhydroenergo”)” Loan No. : IBRD No. 9284-U, CTF No. TF0B5994 and CTF Grant No. TF0B5724 Project ID : P176114 Assignment Title : Elaboration of Feasibility Study for the Project “Ukraine - Improving Power System Resilience for European Power Grid Integration (Installation of Hybrid Systems for Electricity Production in PJSC “Ukrhydroenergo”)” Reference No . (as per Procurement Plan): UHE-IPSR-TEO Ukraine received financing from the International Bank for Reconstruction and Development (hereinafter - “the World Bank”, “IBRD”) and the Clean Technology Fund (hereinafter - “the Fund”, “CTF”) under Loan Agreements toward the implementation of Project “Ukraine - Improving Power System Resilience for European Power Grid Integration (Installation of Hybrid Systems for Electricity Production in PJSC “Ukrhydroenergo”)” (“the Project”) and intends to apply part of the proceeds for consulting services to elaborate feasibility study for the Project “Ukraine - Improving Power System Resilience for European Power Grid Integration (Installation of Hybrid Systems for Electricity Production in PJSC “Ukrhydroenergo”)” under this request for expression of interest. Adhering to the requirements of Ukrainian legislation regarding the composition and content of the Feasibility Study and environmental impact assessment, the Consultant shall develop the Feasibility Study, including a set of technical and preparatory design drawings, and an environmental impact (and social impact) assessment - EA and, if necessary, EIA. Despite the fact that the Project provides for 5 separate construction sites, which the Feasibility Study shall consider as separate construction objects (subprojects and/or construction phases), the Feasibility study will be combined into a single document under the following single name: "Construction. Installation of Hybrid Systems for Electricity Production in Ukrhydroenergo at: "Kyiv HPP and PSPP Cascade" branch - Kyiv HPP, “Kaniv HPP” branch, “Kremenchuk HPP” branch, “Seredniodniprovska HPP” branch, “Dniester HPP” branch ("Ukraine - Improving Power System Resilience for European Power Grid Integration - P176114)". The composition and content of the work involves the following stages: 1st stage: Preparation of the Design Assignment. 2nd stage: Feasibility Study. 3rd stage: EIA / EA (if necessary, including public discussions / hearings). 4th stage: Feasibility Study expertise. 5th stage: Acknowledgment / approval of the Feasibility Study. The Feasibility Study expertise shall be conducted by an independent third party (which is called an "expert organization"). This third party can be a private or public entity that is part of the Ministry for Communities, Territories and Infrastructure Development of Ukraine (Ministry of Infrastructure). The Feasibility Study is submitted by the Client for examination, but at the same time, the assignment includes support by the Consultant during the above-mentioned steps and up to the acknowledgment / approval of the design documentation (Feasibility Study), with a flexible schedule for the provision of consulting services depending on Ukrainian procedures and regulations. Approval of the Feasibility Study - after the Feasibility Study documentation has successfully passed the expertise, further acknowledgement/approval will mean formal approval and/or acceptance of the Feasibility Study by the relevant state bodies, up to the Cabinet of Ministers of Ukraine, or, otherwise, UHE, although in this last case - subject to compliance by UHE with certain conditions. UHE shall inform the Consultant in a timely manner and in advance on the manner in which the acknowledgement/approval of the Feasibility Study is envisaged. The duration of the Services provision is tentatively estimated for a period of 8 calendar months starting from the conclusion date of the Contract with the Consultant. Detailed information on the provision of the said services is provided in ToR via this link - https://drive.google.com/file/d/13_HRFadqr6mscAuBErQesp-3yy6Eb9Un/view?usp=sharing . At this stage, the TOR is provided for information purposes only for the consultant to understand the nature and specifics of the assignment and the scope of responsibilities. It shall not be discussed with the consultants at this stage and any changes, if appropriate, will be subsequently negotiated with the most qualified consultant at the later stages of the selection process. The most qualified consultant will be selected based on the Qualification criteria listed

Official source

Source: World Bank - Procurement Notices (Bank-financed projects)

Always verify details on the official notice.

Last verified against World Bank - Procurement Notices (Bank-financed projects) 2 weeks ago

Documents on World Bank - Procurement Notices (Bank-financed projects) (English)

More from this buyer

Full buyer profile

1 open tender right now

Similar tenders

Market context

Buyer track record on Aperlena
10 notices tracked · 0 awarded

Never miss a tender like this

15,336 new notices in all sectors in Ukraine in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
/
Jump to the search box
?
Show these shortcuts
Esc
Close