Skip to content
Aperlena

Norway - Construction work for water and sewage pipelines - Water and sewage lengthwise, EP 03

Open Contract notice No deadline published
Watch this tender

We email you if the deadline moves or a correction is published. Free. Log in

Summary

Machine-generated summary

Nittedal and Romerike water board (NRVA) is procuring EP03, the final construction contract connecting the complete water and sewage stretch from Aaneby to Li in Norway. The works include digging a ditch on the river slope at Slattum main pump station, lifting, mirroring and connecting the existing water pipeline in the river with a new pipeline on land, reusing the defunct water pipeline in the Nite river between Nordre Holm and Li with a temporary system, cutting the pipeline at Nitelva, removing provisional pipelines at Li and establishing new municipal manholes and connections. Work is planned for summer/autumn 2026. Value and deadline are not stated above.

Description

EP03 consists of construction work that shall be carried out on land and on water. EP03 is the last contract that NRVA shall carry out to bind together the complete water and sewage stretch that stretches from Åneby to Li with the epithet water and sewage lengthwise. EP03 is therefore a minor contract that will have interface to the already executed contracts. The work shall be carried out in summer/autumn 2026. A ditch shall be dug on the slope of the river at Slattum main pump station and the existing water pipeline in the river shall be lifted, mirrored and connected with a new pipeline on land. The existing and defunct water pipeline in the Nite river between Nordre Holm and Li shall be reused and replaced with a temporary system. The water pipeline shall be cut in the Nitelva at Slattum main pump station, run on land and connected to previously established water pipeline on land. At the sales manhole/flushing toy at Li, the existing provisional water pipeline shall be removed when the new water pipeline between Nordre Holm and the sales manhole/flushing toy at Li shall be put into operation. When the provisional water pipeline at Li has been removed, the establishment of new municipal water and sewage manholes and pipelines outside the sales manhole for connection to the existing municipal network is also included.

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 month ago

More from this buyer

Full buyer profile

5 open tenders right now

This buyer has no award history in this sector yet. Usual winners, Construction work - Norway

Company Wins Total awarded Last win
Veidekke Industri AS 13 €54.3M Apr 2026
NCC Industry 6 €21.7M Apr 2026
HENT AS 5 €343.7M Apr 2026
AF Gruppen Norge AS 4 €641.9M Sep 2026
Norsk Teknisk Installasjon AS 4 €86.0M Jul 2026

Based on 222 awards with a linked company profile over the last 2 years.

Similar tenders

Market context

Avg. open tender · Construction work
€31,233,700
25,658 open across Europe right now
Buyer track record on Aperlena
14 notices tracked · 4 awarded
€1,393,203 in awarded contracts

Never miss a tender like this

63 new notices in Construction work in Norway in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
/
Jump to the search box
?
Show these shortcuts
Esc
Close