North Macedonia - Chargers - Supply of equipment - EV Chargers
Buyer: Centre for development of the South-East planning region
Country: North Macedonia
Procedure: Open procedure
Sector (CPV): Electrical machinery (31158000)
Aperlena: https://aperlena.com/en/t/north-macedonia-chargers-supply-of-equipment-ev-chargers-a8ca0a622f
Official notice: https://ted.europa.eu/en/notice/-/detail/633338-2026
Bidding is closed. An award or a correction on this notice: an email when the register sees it.
Log in
The Centre for development of the South-East planning region awarded a contract for the supply, delivery, installation, connection, testing and commissioning of six fast EV charging stations in the south-east of North Macedonia, covering the municipalities of Strumica, Gevgelija, Valandovo, Radovish, Dojran and Novo Selo. The scope included foundation works, electrical connections, traffic signage and markings, training, warranty and aftersales support. The contract was awarded to Solar Spektar AG DOOEL for EUR 298,980 on 26 August 2026.
02
Description
The contract concerns the supply, delivery, installation, connection, testing and commissioning of six fast electric vehicle (EV) charging stations in the SouthEast of North Macedonia, to be installed in the municipalities of Strumica, Gevgelija, Valandovo, Radovish, Dojran and Novo Selo. The charging stations shall be supplied in accordance with the technical specifications defined in the tender documentation and shall fully comply with all applicable EU safety, technical and performance standards. Each charging station will be mounted on an appropriate concrete foundation and connected to the electrical grid, including all necessary civil, electrical and auxiliary works required for full operational readiness. The scope of the contract includes, but is not limited to: • Supply, delivery and installation of the EV charging stations with the technical characteristics defined in the tender specifications; • construction of foundation bases for each charging station; • electrical connection works, including cable lines, disconnection boxes and all required protective elements; • installation of vehicle stop elements and vertical and horizontal traffic signage and markings related to the charging points; • testing and commissioning of the installed equipment to ensure safe and proper operation. The contractor shall also provide training for designated local personnel on the operation and routine maintenance of the charging stations, as well as warranty coverage and aftersales support throughout the warranty period. All required documentation, certificates of conformity, technical manuals and asbuilt documentation must be delivered to ensure correct use, maintenance and longterm functionality of the equipment. Delivery, installation, testing and commissioning of the charging stations must be completed within the timelines defined in the project implementation schedule. The charging infrastructure is intended to promote sustainable transport, encourage lowcarbon mobility and contribute to the development of regional electric vehicle infrastructure.
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)