The Aperlena Verdict
Open raceNo supplier dominates: 5 different companies have won the last 5 comparable contracts from this buyer over 5 years. This is a genuinely open race.
Based on 5 comparable awards by this buyer in this sector over 5 years. Every verdict is recorded before the outcome and graded against the award notice. How we score ourselves.
Summary
Machine-generated summarySBB (Swiss Federal Railways) is procuring major equipment supplies and services for the substantial renewal of the Barberine cascade hydropower plants. The Châtelard I plant in Le Châtelard, municipality of Finhaut, canton of Valais, built between 1919 and 1923 and extended in 1972, primarily supplies railway power (16.7 Hz) for Western Switzerland and the Simplon line. The tender covers a 50 Hz three-phase asynchronous motor, a static frequency converter for 50/16.7 Hz grid coupling including converter transformers, and a variable frequency drive including converter transformer, each with all necessary associated systems, aiming at reliable turbine and pump operation for at least 40 years.
Description
Official source
Source: simap.ch - Swiss public procurement platform
Always verify details on the official notice.
Last verified against simap.ch - Swiss public procurement platform 1 month ago
More from this buyer
Full buyer profile10 open tenders right now
- Kaskade Barberine major renovation, lot Electrical Engineering 5 days left
- Connection boxes 230 V, 16.7 Hz for power supply from the overhead contact line 10 days left
- Switzerland - Electricity distribution and switchgear - Cascade Barberine major renovation, lot: variable frequency drive train PN and grid coupling 18 days left
Who usually wins this buyer's contracts in this sector
| Company | Wins | Total awarded | Last win |
|---|---|---|---|
| DE_Siemens Energy AG | 1 | €23.5M | Jul 2026 |
| DE_Elektrotechnische Werke Fritz Driescher & Söhne GmbH; DE_Pfiffner Schaltgeräte AG | 1 | €11.6M | Jun 2026 |
| DE_Hitachi Energy AG | 1 | €3.3M | Jul 2026 |
| DE_Pfiffner Messwandler AG | 1 | €1.9M | Aug 2026 |
| DE_Sécheron SA | 1 | €899,066 | Jun 2026 |
Based on 5 awards with a linked company profile over the last 5 years.
What this buyer has paid before
Based on 5 comparable contracts this buyer awarded in this sector over the last 4 years.
- €1.9M
- Lower quartile
- €3.3M
- Median award
- €11.6M
- Upper quartile
Most recent awards
- Schweiz - Teile von Elektrizitätsverteilungs- oder -schalteinrichtungen - Messwandler 15kV 16.7Hz für Fahrstrom €1,858,381
- Schweiz - Transformatoren - LOS 1: Rahmenvertrag 16.7Hz, 21.8MVA Fahrleitungstransformator / LOS 2: Projekt UW Andermatt / Göschenen 16.7Hz, 132-66/11kV, 10MVA €23,545,703
- Schweiz - Transformatoren - LOS 1: Rahmenvertrag 16.7Hz, 21.8MVA Fahrleitungstransformator / LOS 2: Projekt UW Andermatt / Göschenen 16.7Hz, 132-66/11kV, 10MVA €3,282,240
- Schweiz - Schaltanlagen - 16.7Hz, 15kV Innenraumschaltanlage Unterwerk Frutigen €899,066
- Schweiz - Elektromechanische Ausrüstung - Motorantriebe für Fahrleitungsschalter €11,597,420
Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.
Similar tenders
Market context
- Avg. open tender · Electrical machinery
- €51,775,974
- Buyer track record on Aperlena
- 20 notices tracked · 9 awarded
- €45,588,491 in awarded contracts
Never miss a tender like this
26 new notices in Electrical machinery in Switzerland in the last 7 days. Get an email when new ones appear. Free.
Set up my alert