Skip to content
Aperlena

Ireland - Works for complete or part construction and civil engineering work - Shesknan Bridge Works

Open Contract notice 28 days left
Watch this tender

Deadline 20 Oct. If it moves, an email when the register sees it. A correction: the same email. Your plan: decide by 6 Oct, questions by 6 Oct, draft by 13 Oct. Log in

  1. Published
  2. Today
  3. Deadline open for 29 days
  4. Awarded pending

The Aperlena Verdict

Open race

No supplier dominates: 4 different companies have won the last 4 comparable contracts from this buyer over 5 years. This is a genuinely open race.

Based on 4 comparable awards by this buyer in this sector over 5 years. Every verdict is recorded before the outcome and graded against the award notice. How we score ourselves.

Summary

Machine-generated summary

Works contract for the full replacement of Shesknan Bridge, a single-span masonry arch bridge of approximately 6m span carrying a local road over a watercourse in Ireland. The bridge has partially collapsed due to advanced deterioration, reinforcement corrosion, section loss and spalling, making repair uneconomical. Scope includes site mobilisation, temporary works and access, demolition of defective components, replacement of the bridge deck and parapet walls, abutment and wingwall re-pointing, vegetation clearance and habitat measures, road reinstatement, surfacing, safety barrier installation, and final inspection and handover.

Description

The project involves the replacement/rehabilitation of a single-span road bridge in poor structural condition and has partially collapsed. Works will focus on the replacement of bridge deck and parapet walls, abutment and wingwall re-pointing, vegetation clearance, and associated ancillary works. Shesknan Bridge is a single-span masonry arch bridge of approximately 6m span, supporting a local road crossing over a natural watercourse. The bridge consists of a masonry arch barrel, stone sidewalls and parapets, with a relatively shallow depth of fill material supporting the road surface above. The recommended solution for the bridge is full replacement. This addresses advanced deterioration including reinforcement corrosion, section loss and spalling, which render repair-only strategies uneconomical and short-lived. Additional works are anticipated to include the following:  Site mobilisation and establishment.  Temporary works and access provision.  Demolition of defective components.  Parapet, abutment and wingwall works.  Vegetation clearance and habitat measures.  Road reinstatement, surfacing and safety barrier installation.  Final inspection and handover.

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 hour ago

More from this buyer

Full buyer profile

7 open tenders right now

Who usually wins this buyer's contracts in this sector

Company Wins Total awarded Last win
Roadstone Ltd 1 €1.2M Sep 2026
Sean Quigley Contracts Ltd 1 €461,067 Sep 2025
Gallagher Const 1 n/a Apr 2026
Truir Construction Ltd 1 n/a Jun 2026

Based on 4 awards with a linked company profile over the last 5 years.

Similar tenders

Market context

Avg. open tender · Construction work
€32,562,838
30,665 open across Europe right now 98% below sector average
Buyer track record on Aperlena
42 notices tracked · 12 awarded
€2,175,078 in awarded contracts

Never miss a tender like this

35 new notices in Construction work in Ireland in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
/
Jump to the search box
?
Show these shortcuts
Esc
Close