Skip to content
Aperlena

Ireland - Project management consultancy services - Project Management (PM) Led Integrated Multi-Disciplinary Design Team Consultancy Services for Infrastructure Delivery - Flood Mitigation Work at IDA Lands National Technology Park, Co. Limerick

Awarded Contract award No deadline published
Watch this tender

Bidding is closed. An award or a correction on this notice: an email when the register sees it. Log in

  1. Awarded
  2. Published

Description

IDA previously carried out a review of the options for flood alleviation at the National Technology Park NTP Limerick. The purpose of the review was to examine viable options to minimise the risk of ingress of flood waters to NTP from the Shannon and Mulcair and manage flood water arising from surface water run off within the park during river flood pluvial flooding. A new flood defence is necessary because the existing flood defence berm provides an insufficient level of protection and currently allows for water seepage beneath the berm through extensive granular soils. There is an existing boundary fence associated with a client’s facility to the east of the site And this fence will be relocated further to the south to facilitate the construction of the flood defence. Due to environmental constraints identified on the Mulkear River spawning lamprey it is proposed to remove existing stormwater outfalls from the site along the Mulkear River and create a new stormwater drainage network with attenuation ponds and treatment draining to the River Shannon through the existing outfall. The Project Management led Multi-Disciplinary Team should consist of suitably qualified and experienced resources including a Project Manager, Civil, Structural and Design Engineers, Quantity Surveyor, Employer’s Representative, PSDP, Assigned Certifier, Third Party co-ordinator, Ecologist and any relevant specialist advisors to provide design, planning and implementation of all subsequent contracts for the provision of the project. The scope of services for the Project Management Led Multi-Disciplinary Design Team will include if required completion of Stage 1 Planning Permission queries 2 Post Planning Submission and Detailed Design 3 Procurement and Assessment of Works Contractor 4 Construction and 5 Handover. A multi-disciplinary Technical Resource Resident Engineer will be required to be procured by the appointed Design Team and a separate appointment will be made for this.

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 month ago

More from this buyer

Full buyer profile

9 open tenders right now

Recent awards

Change history

Every time an official source republished this notice with different content. We watch every source we index, including regional copies of the same notice.

  1. Read before bidding
    • Title: "Ireland - Project management consultancy services - Project Management (PM) Led..." to "Ireland – Project management consultancy services – Project Management (PM) Led..."
    • Estimated value: Set to €900,000
    • Estimated value: Set to €900,000

Follow this tender and we email you the moment it changes. Create account

Similar tenders

Market context

Avg. open tender · IT services
€26,486,804
5,984 open across Europe right now 97% below sector average
Buyer track record on Aperlena
376 notices tracked · 179 awarded
€37,217,061 in awarded contracts

Never miss a tender like this

41 new notices in IT services in Ireland in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
/
Jump to the search box
?
Show these shortcuts
Esc
Close