Skip to content
Aperlena

Ireland - Construction work for sports facilities - Munster Technological University (MTU) High Performance Indoor Athletics Centre (HPAC) at Bishopstown Campus, Cork

Original Ireland - Construction work for sports facilities - Munster Technological University (MTU) High Performance Indoor Athletics Centre (HPAC) at Bishopstown Campus, Cork.

Open Contract notice 51 days left
Watch this tender

Deadline 13 Nov. If it moves, an email when the register sees it. A correction: the same email. Your plan: decide by 30 Oct, questions by 30 Oct, draft by 6 Nov. Log in

  1. Published
  2. Today
  3. Deadline open for 51 days
  4. Award, estimated late January 2027

Award expected around late January 2027. Based on 22 past awards by this buyer in this sector, a median of 125 days from publication to decision.

The Aperlena Verdict

Open race

No supplier dominates: 7 different companies have won the last 9 comparable contracts from this buyer over 5 years. This is a genuinely open race.

125 days
Expected wait for the award decision
from 22 past awards

Based on 9 comparable awards by this buyer in this sector over 5 years. Every verdict is recorded before the outcome and graded against the award notice. How we score ourselves.

Summary

Machine-generated summary

Munster Technological University is procuring construction works for a High Performance Indoor Athletics Centre at its Bishopstown Campus in Cork. The building is part single and part three storey, covering about 5250 square metres, and includes sports laboratories, classrooms, studios and plant space, plus an external roof terrace. Works also cover landscaping, site and services works. The facility will be built to the south of the existing running track within the main campus on Rossa Avenue and connected to the existing MTU Arena at first and second floor levels. Full details are given in the attached tender documentation.

Description

This tender relates to the Construction of a part single / part three storey High Performance Indoor Athletics Training Centre (HPAC) with associated sports laboratories, classrooms, studios and plant (approx. area 5250sqm), along with an external roof terrace, and associated landscaping, site and services works. The new facility is to be located to the south of the existing running track within the main MTU Bishopstown campus located at Rossa Avenue, Bishopstown, Cork and will be connected to the existing MTU Arena at 1st and 2nd Floor levels. Full details are in the tender documentation attached to this Contract Notice.

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 minute ago

More from this buyer

Full buyer profile

4 open tenders right now

This buyer has no award history in this sector yet. Usual winners, Construction work - Ireland

Company Wins Total awarded Last win
TRIUR Construction Limited 20 €107.4M Aug 2026
Roadstone Ltd 12 €12.8M Sep 2026
Carra Plant Hire Ltd 12 €1.7M Sep 2026
Jons Civil Engineering Company Limited 9 €45.3M Aug 2026
Global Rail Services Ltd 9 €7.7M Sep 2026

Based on 901 awards with a linked company profile over the last 2 years.

Similar tenders

Market context

Avg. open tender · Construction work
€31,349,730
25,897 open across Europe right now 30% below sector average
Buyer track record on Aperlena
263 notices tracked · 215 awarded
€24,978,239 in awarded contracts

Never miss a tender like this

32 new notices in Construction work in Ireland in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
/
Jump to the search box
?
Show these shortcuts
Esc
Close