The Aperlena Verdict
Open raceNo supplier dominates: 76 different companies have won the last 110 comparable contracts from this buyer over 5 years. This is a genuinely open race.
- 0%
- Expected final price vs the published estimate
- 164 days
- Expected wait for the award decision
- from 23 past awards
Based on 110 comparable awards by this buyer in this sector over 5 years. Every verdict is recorded before the outcome and graded against the award notice. How we score ourselves.
Summary
Machine-generated summaryUniversity Hospital Limerick in Ireland is procuring construction works to vertically expand Block G, an existing 24-bed ward built under emergency legislation during the COVID-19 pandemic. The project will add 72 inpatient beds across three new ward levels, plus staff and ancillary accommodation, a plant room at the fourth and part of the fifth floor, and two new stair cores and lifts, creating approximately 6,617 m2 of floor area including plant room and site development above and below ground. Works take place on an operational acute hospital campus next to live 24/7 clinical departments.
Description
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 month ago
More from this buyer
Full buyer profile62 open tenders right now
- Miscellaneous health services - Music Therapy Sessions for HSE West and North West RHA, Mental Health Services Galway 8 days left
- Health and social work services - HSE 29617 - Authorisation Scheme for the Provision of Home Support Services - Round 4 10 days left
- Sandwiches - Provision of Sandwiches, wraps and related Products for Cork University Hospital 11 days left
Who usually wins this buyer's contracts in this sector
| Company | Wins | Total awarded | Last win |
|---|---|---|---|
| Carey Building Contractors | 8 | €31.9M | Aug 2026 |
| Precision Building Services | 5 | €320,857 | Mar 2026 |
| Elliott Properties Ltd | 4 | €2.3M | Jan 2026 |
| MURNAGHAN BROTHERS LIMITED | 4 | €1.1M | Apr 2026 |
| MVS Construction Ltd | 3 | €2.1M | Nov 2024 |
Based on 110 awards with a linked company profile over the last 5 years.
What this buyer has paid before
Based on 74 comparable contracts this buyer awarded in this sector over the last 4 years.
- €69,679
- Lower quartile
- €232,930
- Median award
- €760,484
- Upper quartile
This tender is estimated 39091.6% above that median
Most recent awards
- HSE Estates SW: Design and Build Contract for the Refurbishment of X-Ray Room in 4D of CRC Building at Cork University Hospital €173,215
- EST WORKS - Internal Building Fitout for the new Community Day Service at Unit 48A, Omni Shopping Centre, Swords, Dublin €793,746
- Construction work - EST Constr - Circular Road, Tubbercurry, Sligo. Tubbercurry Primary Care Centre €9,000,000
- Construction work for buildings relating to health - Estates SW: Electro-Physiology Laboratory development €410,240
- Est Constr - Sligo University Hospital - Lift replacement x 2, The Mall Sligo F91 H684 €468,892
Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.
Similar tenders
Market context
- Avg. open tender · Construction work
- €31,242,587
- Buyer track record on Aperlena
- 1,435 notices tracked · 690 awarded
- €924,935,681 in awarded contracts
Never miss a tender like this
35 new notices in Construction work in Ireland in the last 7 days. Get an email when new ones appear. Free.
Set up my alert