Skip to content
Aperlena

Ireland - Architectural and related services - Multi-Party Framework Agreement for HSE Design Team Services Framework 2024 - FW02: Acute Healthcare Capital Works - project value €1M - €15M excl. VAT for HSE Regional Health Area: Cork / Kerry

Awarded Contract award No deadline published
Watch this tender

Bidding is closed. An award or a correction on this notice: an email when the register sees it. Log in

  1. Awarded
  2. Published

Description

The projects consists of the refurbishment of existing space in the CUH Theatre Block for a new Hybrid Vascular Theatre, including refurbishment and expansion of the current Theatre Reception and Theatre Recovery areas. Hybrid Vascular Theatre: A hybrid vascular theatre is a specialized operating room that combines traditional surgical capabilities with advanced imaging technologies such as MRI and CT which enables intra-operative diagnostics. This allow surgeons to perform both open and minimally invasive procedures on the same patient in a single, controlled environment. This means that the theatre can seamlessly integrate open surgery with endovascular procedures, such as stent placement or aneurysm repair, all without requiring the patient to be moved between different facilities. Theatre Reception: The current footprint of Theatre Reception is inadequate with only 4 bays which are too small and provide little privacy. The Nurse’s station consists of a stand-alone desk in this confined space offering no privacy for Nursing or Medical staff to have patient and/or staff sensitive discussions. The patients w.c. is small and located in a confined, difficult to access area and is not suitable for patients’ requiring chaperones or assistance. There are no Clean or Dirty utility or Storage facilities currently in Theatre Recovery. Theatre Recovery: Theatre Recovery has 9 bays serving 9 Theatres in the main Theatre Complex as well as 2 remote Theatres (Theatre 9 and the Hybrid Theatre). There are no isolation bays within the current footprint. Due to inadequate capacity in Theatre Recovery, patients are regularly recovered within Theatre, while awaiting one of the bays to become available. This has a significant impact on patient flow and Theatre utilization. The reconfigured CUH Theatre Complex with 11 theatres will have 22 Recovery bays. Net Floor Area of 1230 Sqr M

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 month ago

More from this buyer

Full buyer profile

64 open tenders right now

Recent awards

Change history

Every time an official source republished this notice with different content. We watch every source we index, including regional copies of the same notice.

  1. Read before bidding
    • Estimated value: Set to €400,000,000
    • Award date: Awarded on April 27, 2026
    • Estimated value: Set to €400,000,000

Follow this tender and we email you the moment it changes. Create account

Similar tenders

Market context

Avg. open tender · Architecture & engineering services
€9,396,529
15,626 open across Europe right now
Buyer track record on Aperlena
1,430 notices tracked · 685 awarded
€917,406,493 in awarded contracts

Never miss a tender like this

25 new notices in Architecture & engineering services in Ireland in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
/
Jump to the search box
?
Show these shortcuts
Esc
Close