Aller au contenu
Aperlena

Ireland - Architectural and related services - Multi-Party Framework Agreement for HSE Design Team Services Framework 2024 - FW02: Acute Healthcare Capital Works - project value €1M - €15M excl. VAT for HSE Regional Health Area: Cork / Kerry

Attribué Avis d'attribution Aucune date limite publiée
Suivre ce marché

Les offres sont closes. Une attribution ou un rectificatif sur cet avis : un e-mail quand le registre le voit. Se connecter

  1. Attribué
  2. Publié

Description

The projects consists of the refurbishment of existing space in the CUH Theatre Block for a new Hybrid Vascular Theatre, including refurbishment and expansion of the current Theatre Reception and Theatre Recovery areas. Hybrid Vascular Theatre: A hybrid vascular theatre is a specialized operating room that combines traditional surgical capabilities with advanced imaging technologies such as MRI and CT which enables intra-operative diagnostics. This allow surgeons to perform both open and minimally invasive procedures on the same patient in a single, controlled environment. This means that the theatre can seamlessly integrate open surgery with endovascular procedures, such as stent placement or aneurysm repair, all without requiring the patient to be moved between different facilities. Theatre Reception: The current footprint of Theatre Reception is inadequate with only 4 bays which are too small and provide little privacy. The Nurse’s station consists of a stand-alone desk in this confined space offering no privacy for Nursing or Medical staff to have patient and/or staff sensitive discussions. The patients w.c. is small and located in a confined, difficult to access area and is not suitable for patients’ requiring chaperones or assistance. There are no Clean or Dirty utility or Storage facilities currently in Theatre Recovery. Theatre Recovery: Theatre Recovery has 9 bays serving 9 Theatres in the main Theatre Complex as well as 2 remote Theatres (Theatre 9 and the Hybrid Theatre). There are no isolation bays within the current footprint. Due to inadequate capacity in Theatre Recovery, patients are regularly recovered within Theatre, while awaiting one of the bays to become available. This has a significant impact on patient flow and Theatre utilization. The reconfigured CUH Theatre Complex with 11 theatres will have 22 Recovery bays. Net Floor Area of 1230 Sqr M

Source officielle

Source : TED - Tenders Electronic Daily (Publications Office of the EU)

Vérifiez toujours les détails dans l'avis officiel.

Dernière vérification auprès de TED - Tenders Electronic Daily (Publications Office of the EU) il y a 1 mois

Plus de cet acheteur

Profil complet de l'acheteur

65 marchés ouverts actuellement

Attributions récentes

Historique des modifications

Chaque republication de cet avis par une source officielle avec un contenu différent. Nous surveillons toutes les sources que nous indexons, y compris les copies régionales du même avis.

  1. A lire avant de repondre
    • Valeur estimée: Fixé à 400 000 000 €
    • Date d'attribution: Attribué le 27 avril 2026
    • Valeur estimée: Fixé à 400 000 000 €

Suivez ce marche et nous vous ecrivons dès qu'il change. Créer un compte

Marchés similaires

Contexte de marché

Appel ouvert moyen · Services d'architecture & d'ingénierie
9 267 180 €
15 741 ouverts en Europe actuellement
Historique de l'acheteur sur Aperlena
1 430 avis suivis · 685 attribués
917 406 493 € de contrats attribués

Ne manquez plus aucun marché comme celui-ci

25 nouveaux avis pour Services d'architecture & d'ingénierie en Irlande au cours des 7 derniers jours. Recevez un e-mail quand de nouveaux avis paraissent. Gratuit.

Créer mon alerte

Raccourcis clavier

Parcourir une liste sans toucher la souris. Les raccourcis restent inactifs pendant la saisie dans un champ.

j
Résultat suivant
k
Résultat précédent
Entrée
Ouvrir le résultat
n
Page suivante
p
Page précédente
c
Comparer ce résultat
s
Ajouter ce résultat à la présélection
/
Aller au champ de recherche
?
Afficher ces raccourcis
Échap
Fermer