Skip to content
Aperlena

simap.ch - Swiss public procurement platform verified 9 hours ago Contract notice

Flood protection village Alpthal - Preliminary works

Original Hochwasserschutz Dorf Alpthal - Vormassnahmen

Open Switzerland Construction work

Buyer Bezirk Schwyz - Abteilung Umwelt

38 days left

Key facts

Closes
12:00 (UTC+1)
Procedure
Open procedure
  1. Published
  2. Today
  3. Deadline open for 38 days
  4. Awarded pending

Bidding window

38 days from publication to deadline

Usual length

Notices of this kind (Switzerland, open procedure) give a median of 41 days, half of them between 36 and 46 days, based on 2,544 notices of the last two years.

View the official notice Watch this tender

If the deadline moves or the notice is corrected, we email you. Log in

Summary

Machine-generated summary

This tender covers the preliminary works lot of the flood protection project for the village of Alpthal. The main works lot is not part of this tender. On the Geissbergbach, a new sediment collector will be built above the Hochweidstrasse, with a concrete block inlet, a concrete outlet wall with steel beams forming a rack screen, and a new gravel-grass access road for maintenance. Above the collector, the channel will be widened using a new basin structure with thresholds made of concrete blocks weighing 1.5 to 2.5 tonnes, and a diversion dam will be created by terrain adjustment at the forest edge. On the Hochweidbach, the channel will be enlarged to capture floodwater, with blocks and thresholds forming a basin structure. On the Mattlibach and Karlismattbach, new sediment collectors with inlets and rack outlet structures will be built, together with utility and spring water line relocations.

Description

Die Ausführung des Hochwasserschutzprojekts wird in zwei separaten Losen erstellt. -       Los Vormassnahmen -      Los Hauptarbeiten Die vorliegende Ausschreibung umfasst die Arbeiten vom Los Vormassnahmen. Das Los Hauptarbeiten ist nicht Bestandteil dieser Ausschreibung. Die Arbeiten beim Los Vormassnahmen umfassen folgende Massnahmen:   Geissbergbach Oberhalb der Hochweidstrasse wird ein neuer Geschiebesammler erstellt. Der Einlaufbereich wird mit Blöcken in Beton ausgeführt. Als Auslaufbauwerk wird eine Betonmauer mit eingesetzten Stahlträgern (Rechen) erstellt. Der Unterhaltszugang zum Geschiebesammler erfolgt ab der Hochweidstrasse über eine neue Erschliessungsstrasse mit Schotterrasen. Der best. Durchlass Hochweidstrasse bleibt unverändert. Oberhalb des Kiessammlers wird das Gerinne mittels einer neu erstellten Beckenstruktur mit Schwellen, bestehend aus 1.5 bis 2.5 Tonnen schweren Blöcken in Beton, auf den nötigen HW-Querschnitt ausgebaut. Die Blöcke in den Böschungen werden nicht einbetoniert. Weiter oben, ausgangs des Waldes, wird mittels Terrainanpassung ein Ablenkdamm erstellt.   Hochweidbach Oberhalb der Hochweidstrasse wird das Gerinne ausgebaut und der Abflussquerschnitt vergrössert, um das Wasser fassen zu können. Im steilen oberen Bereich wird der Bach durch Blöcke und Schwellen als Beckenstruktur gestaltet.   Mattlibach Im Oberlauf des Mattlibachs wird ein Geschiebesammler mit einem neuen Auslaufbauwerk erstellt. Der Einlaufbereich wird mit Blöcken in Beton ausgeführt. Das Auslaufbauwerk wird mittels Rechenkosruktion ausgebildet und schliesst an die bestehende Eindolung an.   Karlismattbach Oberhalb des Siedlungsrandes am Haggeneggweg wird ein neuer Geschiebesammler erstellt. Der Einlaufbereich wird mit Blöcken in Beton ausgeführt. Als Auslaufbauwerk wird eine Betonmauer mit eingesetzten Stahlträgern (Rechen) erstellt. Für den Bau sind vorgängig Umlegungen von Werk- und Quellwasserleitungen erforderlich. Der Unterhaltszugang zum Geschiebesammler erfolgt über eine neue Erschliessungsstrasse mit Schotterrasen.   Unterhalb des Kiessammlers wird das Gerinne mittels einer neu erstellten Beckenstruktur mit Schwellen, bestehend aus 1.5 bis 2.5 Tonnen schweren Blöcken in Beton, auf den nötigen HW-Querschnitt ausgebaut. Die Blöcke in den Böschungen werden nicht einbetoniert. Der kleine, bereits vorhandene Kiessammler bleibt unverändert bestehen.   Die detaillierten Massnahmen und genauen Abgrenzungen sind in den Projektpläne ersichtlich. Die einzelnen Baustellen sind auf verschiedene Teilperimeter verteilt und nicht zusammenhängend. Die Zwischentransporte von Aushubmaterial und Humus sind teilweise Bauplatzübergreifend, wobei die öffentlichen Strassen und Grundstücke/Strassen Dritter gequert werden müssen.

Bid or no-bid?

Six questions before you commit a team. Under each one, what the register holds on it. The answers are yours.

  1. In your favour:

    Do we meet every eligibility criterion?

    Open procedure: any interested supplier may submit a bid.

  2. Your call:

    Can we deliver this with the team we have?

    The register holds nothing on this. The official documents will.

  3. Your call:

    Do we have two comparable references?

    Comparable work is in Construction work.

  4. In your favour:

    Is the deadline realistic for a proper offer?

    38 days left, 28 of them working days.

  5. Your call:

    Is there a margin at the likely winning price?

    In this country this kind of contract is usually awarded for between €392,747 and €2.1M.

  6. Your call:

    Do we know this buyer?

    The register holds nothing on this. The official documents will.

Can I bid?

  • Open procedure: any interested supplier may submit a bid.
  • The notice is written in German.

Official source

Source: simap.ch - Swiss public procurement platform

Always verify details on the official notice.

This is not an official publication. The data published on the www.simap.ch platform are authoritative.

Report an error in this notice

Last verified against simap.ch - Swiss public procurement platform 9 hours ago

What this market pays

The buyer has too few awards of its own in this sector, so this is the range of the last 2,000 awards for Construction work in Switzerland.

Median award
€810,314
Middle half of past awards
€392,747 to €2.1M

simap.ch - Swiss public procurement platform publishes no value for this notice, so it has no mark on the scale. The official documents may state one.

Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.

Bezirk Schwyz - Abteilung Umwelt

Switzerland

This buyer has no award history in this sector yet. Usual winners, Construction work - Switzerland

Company Wins Total awarded Last win
DE_Equans Switzerland AG 22 €26.5M Sep 2026
DE_Walo Bertschinger AG 18 €79.4M Oct 2026
DE_Frutiger AG 17 €540.4M Aug 2026
DE_Anliker AG Bauunternehmung 17 €166.4M Jul 2026
DE_Implenia Schweiz AG 16 €528.6M Oct 2026

Based on 2794 awards with a linked company profile over the last 2 years.

2 open tenders right now

Market context

simap.ch - Swiss public procurement platform publishes no value for this notice, so it cannot be placed among the open notices of its sector. The official documents may state one.

open now in Construction work
29,117
median open notice
€854,747

Who wins in this market

Many suppliers

Switzerland · Construction work

different companies won awards here
1,431
of the awards went to the three most frequent winners
2%
buyers awarded contracts here
554

Based on 2,794 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
4.4
of those lots received a single tender
7%
of the awards went to companies based in another country
1%
of the tenders came from another country
0%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Similar tenders

Open now

Awarded before

Never miss a tender like this

2,871 new notices in Construction work in Switzerland in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

38 days left

Open notice

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language