Summary
Machine-generated summaryThis works contract covers slope water protection in the residential expansion area known as 'Am Schranken'. The works consist of constructing a new retention basin that will collect the slope water accumulating in the area. Discharge from the basin will be controlled by a throttle valve, limiting the outflow rate. From there, the slope water flows through a discharge channel and is routed onwards into the existing ditch system. The project thus combines a new retention basin, a throttle structure and a drainage channel, connecting the new flood mitigation infrastructure to the existing drainage network serving the expansion area.
Description
Official source
Source: AUSSCHREIBUNG.AT (Hubexo Austria GmbH)
Always verify details on the official notice.
Last verified against AUSSCHREIBUNG.AT (Hubexo Austria GmbH) 2 weeks ago
The official portal may ask for a free registration before downloading.
More from this buyer
Full buyer profileThis buyer has no award history in this sector yet. Usual winners, Construction work - Austria
| Company | Wins | Total awarded | Last win |
|---|---|---|---|
| PORR Bau GmbH | 51 | €285.7M | Sep 2026 |
| STRABAG AG | 48 | €257.0M | Sep 2026 |
| SWIETELSKY AG | 35 | €380.6M | Sep 2026 |
| Tischlerei Scheschy GmbH | 20 | €49.7M | Sep 2026 |
| Leyrer + Graf Baugesellschaft m.b.H. | 14 | €81.2M | Sep 2026 |
Based on 1616 awards with a linked company profile over the last 2 years.
Similar tenders
2
days left
€6,700,000
est. value
2
days left
€90,000
est. value
2
days left
€280,000
est. value
2
days left
€720,000
est. value
Market context
- Avg. open tender · Construction work
- €31,918,758
- Buyer track record on Aperlena
- 1 notices tracked · 0 awarded
Never miss a tender like this
183 new notices in Construction work in Austria in the last 7 days. Get an email when new ones appear. Free.
Set up my alert