Skip to content
Aperlena

GB-London: 1008157290 T1414 Testing the feasibility of the use of solar reflective solutions on rolling stock

Awarded Contract award
Watch this tender

Bidding is closed. An award or a correction on this notice: an email when the register sees it. Log in

  1. Deadline
  2. Awarded decided in 31 days
  3. Published

Summary

Machine-generated summary

RSSB bought a study to test whether solar reflective solutions can reduce internal temperatures of GB passenger rolling stock, aiming to improve passenger comfort, cut HVAC energy demand and improve component reliability. The work includes benchmarking existing paint systems, box trials representative of a rail vehicle, a business case for adoption, and planning of next steps. The contract was awarded to Engineering Support Group Ltd for EUR 139,619.78, the same as the estimated value (within 1%). The deadline for bids was 2026-02-27 and the award date was 2026-03-30.

Description

T1414 aims to demonstrate the effective use of Solar Reflective Solutions to reduce internal vehicle temperatures, supporting improved passenger comfort, reduced HVAC energy consumption demand and improved component reliability for GB passenger rolling stock. Work Package 1- Benchmarking and trial planning • Assess the current performance of existing rolling stock paint systems to establish a baseline against which the potential benefit and disbenefits of adopting solar reflective alternatives can be determined. • Identify and select SRSs which meet GB passenger rolling stock requirements to ensure the SRSs trialled meet technical, safety, and operational material requirements. • Develop a test plan for a box trial, representative of a rail vehicle, to assess the effect that SRSs would have on internal rail vehicle temperature. Work Package 2 - Box trials • Undertake box trials2, representative of a rail vehicle, as per the test plan produced in WP1, to gather data on the solar, thermal and operational environment performance of SRSs. •Analyse the data gathered from the box trials to enable cost-benefit analysis of the material systems and mitigate potential risk/unsuitable candidates. Work Package 3 - Business case for SRS adoption • Produce an initial business case for the use of SRSs on GB passenger rolling stock based on WP2. Work Package 4 - Planning next steps - This will only be undertaken if business case in WP3 is positive • Identify the questions (including technical) that remain to be answered to make informed decisions on the adoption of SRS. • Develop a test plan for trial(s) that would answer the outstanding questions identified in WP 2 and 3 so RSSB may seek support from relevant parties and plan for such trial(s). Note - The decision to proceed with the last work package will be made by RSSB based on the findings from WP2 and 3. The work for WP4 should be included in the total price, but with the cost separately identified to be able to be removed if WP4 is not progressed.

Official source

Source: Contracts Finder (UK Cabinet Office)

Always verify details on the official notice.

Last verified against Contracts Finder (UK Cabinet Office) 1 week ago

Documents on Contracts Finder (UK Cabinet Office) (English)

More from this buyer

Full buyer profile

Recent awards

Similar tenders

Market context

Avg. open tender · Research & development
€3,210,636
534 open across Europe right now 96% below sector average
Buyer track record on Aperlena
5 notices tracked · 3 awarded
€249,079 in awarded contracts

Never miss a tender like this

23 new notices in Research & development in United Kingdom in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
/
Jump to the search box
?
Show these shortcuts
Esc
Close