The Aperlena Verdict
Open raceNo supplier dominates: 16 different companies have won the last 43 comparable contracts from this buyer over 5 years. This is a genuinely open race.
- 0%
- Expected final price vs the published estimate
Based on 43 comparable awards by this buyer in this sector over 5 years. Every verdict is recorded before the outcome and graded against the award notice. How we score ourselves.
Summary
Machine-generated summaryThe buyer is seeking a contractor to build a new DN500 drinking water transport pipeline in Brittany, France. The works form part of the Feeder Baud Brech project, Lot 2 (Chantier n°2), covering a 16.5 km stretch between the communes of Pluvigner and Brech. The operation has two phases: Phase 1 in Pluvigner starting from June 2027 and Phase 2 in Brech starting from June 2028. The contract is paid via unit prices. Works begin on the date set by the service order for each phase.
Description
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 month ago
More from this buyer
Full buyer profile3 open tenders right now
- Operation of new resources and expansion of treatment capacity at the Tourlaouen drinking water plant - Commune de Plouray 7 days left
- Temple Reservoir in Carentoir - Construction of a 500 m3 ground-level tank and rehabilitation of the existing drinking water storage facility 35 days left
Who usually wins this buyer's contracts in this sector
| Company | Wins | Total awarded | Last win |
|---|---|---|---|
| TPC OUEST | 7 | €5.5M | Dec 2025 |
| STURNO | 6 | €2.9M | Feb 2026 |
| SOC BRETON CANALISA EAU ASSAIN AUDO CIE | 5 | €3.1M | Dec 2025 |
| DLE OUEST | 5 | €2.7M | Nov 2025 |
| SATEC ENVIRONNEMENT | 4 | €1.3M | Dec 2025 |
Based on 43 awards with a linked company profile over the last 5 years.
What this buyer has paid before
Based on 43 comparable contracts this buyer awarded in this sector over the last 4 years.
- €340,892
- Lower quartile
- €525,000
- Median award
- €806,858
- Upper quartile
Most recent awards
- L'objet de l'opération est donc de restaurer la libre circulation piscicole et sédimentaire sur ce tronçon de l'Ellé, tout en maintenant la fonctionnalité de la prise d'eau potable. La consistance de l'opération comprend : - L'arasement du seuil de retenu aval à la cote 174,45 m NGF - L'arasement du seuil de la prise d'eau à la cote 174,45 m NGF - La création d'une banquette minérale en enrochement - Des travaux d'accompagnement (cloison siphoïde, berge rive gauche, clôture, échelle limnimétriqu €43,754
- Travaux de restauration du lit de la rivière Ellé au droit de la prise d'eau de la station de pompage de Pont St Yves €43,754
- ACBC 2026 EU TERRITOIRE D'ASB EN PARTIE €650,000
- La présente consultation concerne les travaux sur le territoire de EAU DU MORBIHAN - Programme de travaux CVM - Année 2026 Fourniture et pose de réseaux d'eau potable Lieu(x) d'exécution : Communes de LA CHAPELLE NEUVE, GUEHENNO, LIGNOL et BOHAL €312,934
- EAU DU MORBIHAN - Territoire de Ploërmel Communauté - Programme de travaux 2026 Fourniture et pose de réseaux d'eau potable Lieu(x) d'exécution : Communes de CRUGUEL, GUEGON et GUILLAC €304,365
Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.
Similar tenders
2
days left
€19,000,000
est. value
Market context
- Avg. open tender · Construction work
- €31,738,765
- Buyer track record on Aperlena
- 85 notices tracked · 65 awarded
- €28,162,049 in awarded contracts