Skip to content
Aperlena

France - Railway works - RER Line A - ITC FOBO 2027

Original France - Ouvrages ferroviaires - RER A - ITC FOBO 2027

Open Contract notice No deadline published
Watch this tender

We email you if the deadline moves or a correction is published. Free. Log in

The Aperlena Verdict

Open race

No supplier dominates: 24 different companies have won the last 25 comparable contracts from this buyer over 5 years. This is a genuinely open race.

Based on 25 comparable awards by this buyer in this sector over 5 years. Every verdict is recorded before the outcome and graded against the award notice. How we score ourselves.

Summary

Machine-generated summary

RATP is procuring railway track renewal works on the RER Line A, on the Vincennes to Marne la Vallee Chessy and Vincennes to Boissy Saint Leger branches east of Paris. The works comprise track platform drainage works (ASS) and point and crossing renewal (RAV), carried out during a four-week temporary traffic interruption from Friday 31 July 2027 to 23 August 2027, between Vincennes and Nogent between PK 7.216 and PK 8.022. Two mandatory technical scenarios are defined: Scenario 1 covering 1042 metres of main track, and Scenario 2 covering 1608 metres of main track, both including switch and crossing works. No estimated value, deadline or procedure details are given in the notice.

Description

Dans le cadre du projet de Renouvellement des Voies Ballastées (RVB par la suite) des branches Vincennes / Marne la Vallée Chessy et Vincennes / Boissy Saint Leger) situées à l’Est de la ligne A du RER, une campagne de travaux est programmée au cours de l’été 2027. Dans ce contexte, des travaux d’assainissement de plateforme de voie (ASS par la suite), et de renouvellement d’appareil de voie (RAV par la suite) sont à réaliser sous Interruption Temporaire de Circulation (ITC par la suite) durant 4 semaines en août 2027 du vendredi 31/07/27 PDS au 23/08/27 PDS. Les travaux sont localisés entre Vincennes et Nogent entre les PK 7.216 et 8.022. La RATP définit deux scénarios techniques obligatoires : - Scénario 1 : 1042mlv de voie principale, ADV inclus Ils couvrent les PK suivants : • Voie 1 du PK 7220 au PK 7739 (519m) • Voie 2 du PK 7216 au PK 7739 (523m) - Scénario 2 : 1608mlv de voie principale, ADV inclus Ils couvrent les PK suivants : • Voie 1 du PK 7220 au PK 8022 (802m) • Voie 2 du PK 7216 au PK 8022 (806m)

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 month ago

More from this buyer

Full buyer profile

162 open tenders right now

Who usually wins this buyer's contracts in this sector

Based on 25 awards with a linked company profile over the last 5 years.

What this buyer has paid before

Based on 18 comparable contracts this buyer awarded in this sector over the last 4 years.

€2.9M
Lower quartile
€5.4M
Median award
€7.9M
Upper quartile

Most recent awards

Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.

Similar tenders

Market context

Avg. open tender · Construction work
€32,745,079
30,734 open across Europe right now
Buyer track record on Aperlena
238 notices tracked · 70 awarded
€413,250,900 in awarded contracts

Never miss a tender like this

2,382 new notices in Construction work in France in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
/
Jump to the search box
?
Show these shortcuts
Esc
Close